5 Assembly....................................................................................................................................................33
5.1 Preparations for installation....................................................................................................33
5.1.1 Requirements for installation..................................................................................................33
5.1.2 Insulation resistance and polarization index..........................................................................34
5.1.3 Testing the insulation resistance and polarization index........................................................35
5.1.4 Preparing the mating faces....................................................................................................38
5.2 Lift the machine to where it will be installed, and position it...................................................38
5.2.1 Checking the load handling attachments...............................................................................38
5.2.2 Preconditions for correct alignment and secure attachment .................................................39
5.2.3 Mounting the output elements................................................................................................39
5.2.4 Lifting the machine.................................................................................................................41
5.2.5 Working on the underside of the machine..............................................................................43
5.2.6 Removing anti-corrosion protection.......................................................................................43
5.2.7 Putting the machine down......................................................................................................44
5.2.8 Draining condensation...........................................................................................................44
5.2.9 Roughly aligning the machine................................................................................................45
5.3 Installing the machine............................................................................................................46
5.3.1 Safety instructions for installation...........................................................................................46
5.3.2 Selecting bolts........................................................................................................................46
5.3.3 Preconditions for smooth, vibration-free operation................................................................47
5.3.4 Aligning and attaching the machine to the driven machine....................................................47
5.3.5 Axial and radial forces at the second shaft extension............................................................48
5.4 Connecting the supply lines...................................................................................................49
5.4.1 Connecting the cooling water supply.....................................................................................49
5.5 Complete the installation work...............................................................................................49
6 Electrical connection...................................................................................................................................51
6.1 Safety instructions..................................................................................................................51
6.2 Preparation.............................................................................................................................51
6.2.1 Selecting cables.....................................................................................................................51
6.2.2 Route the cable with an appropriate loop so that water can drip off......................................52
6.2.3 Terminal designation..............................................................................................................52
6.2.4 Terminal box..........................................................................................................................53
6.2.5 Connecting the grounding conductor.....................................................................................53
6.3 Inserting and routing the cables.............................................................................................54
6.3.1 Connecting the machine for a specific direction of rotation....................................................54
6.3.2 Minimum air clearances.........................................................................................................56
6.3.3 Connecting aluminum conductors..........................................................................................56
6.3.4 Stepless mating face for sealing in the terminal box cover....................................................56
6.3.5 Performing connection operations.........................................................................................57
6.4 Connecting the auxiliary circuits.............................................................................................57
6.4.1 Selecting cables.....................................................................................................................57
6.4.2 Connecting temperature monitoring for the stator winding....................................................58
7 Commissioning...........................................................................................................................................59
7.1 Prior to commissioning ..........................................................................................................59
7.2 Insulation resistance and polarization index..........................................................................61
Table of contents
SIMOTICS HV C 1NA14544WA600AG0-Z
6Operating Instructions 06/2018