4.4.1 Group A inspection.
a. Tests shall be as specified in table IIA herein.
b. For device class M, subgroups 7 and 8 tests shall be sufficient to verify the truth table. For device classes Q and V,
subgroups 7 and 8 shall include verifying the functionality of the device.
c. Subgroup 4 (CIN measurement) shall be measured only for the initial qualification and after process or design changes
which may affect capacitance. CIN shall be measured between the designated terminal and GND at a frequency of
1 MHz. Tests shall be sufficient to validate the limits defined in table I herein.
4.4.2 Group C inspection. The group C inspection end-point electrical parameters shall be as specified in table IIA herein.
4.4.2.1 Additional criteria for device class M. Steady-state life test conditions, method 1005 of MIL-STD-883:
a. Test condition A, B, C, or D. The test circuit shall be maintained by the manufacturer under document revision level
control and shall be made available to the preparing or acquiring activity upon request. The test circuit shall specify
the inputs, outputs, biases, and power dissipation, as applicable, in accordance with the intent specified in test method
1005 of MIL-STD-883.
b. TA = +125°C, minimum.
c. Test duration: 1,000 hours, except as permitted by method 1005 of MIL-STD-883.
4.4.2.2 Additional criteria for device classes Q and V. The steady-state life test duration, test condition and test temperature,
or approved alternatives shall be as specified in the device manufacturer's QM plan in accordance with MIL-PRF-38535. The
test circuit shall be maintained under document revision level control by the device manufacturer's TRB in accordance with
MIL-PRF-38535 and shall be made available to the acquiring or preparing activity upon request. The test circuit shall specify
the inputs, outputs, biases, and power dissipation, as applicable, in accordance with the intent specified in test method 1005 of
MIL-STD-883.
4.4.3 Group D inspection. The group D inspection end-point electrical parameters shall be as specified in table IIA herein.
4.4.4 Group E inspection. Group E inspection is required only for parts intended to be marked as radiation hardness
assured (see 3.5 herein).
a. End-point electrical parameters shall be as specified in table IIA herein.
b. For device classes Q and V, the devices or test vehicle shall be subjected to radiation hardness assured tests as
specified in MIL-PRF-38535 for the RHA level being tested. For device class M, the devices shall be subjected to
radiation hardness assured tests as specified in MIL-PRF-38535, appendix A for the RHA level being tested. All
device classes must meet the postirradiation end-point electrical parameter limits as defined in table I at
TA = +25°C ±5°C, after exposure, to the subgroups specified in table IIA herein.
c. When specified in the purchase order or contract, a copy of the RHA delta limits shall be supplied.
4.4.4.1 Total dose irradiation testing. Total dose irradiation testing shall be performed in accordance with MIL-STD-883,
method 1019 and as specified herein.
4.4.4.1.1 Accelerated aging test. Accelerated aging tests shall be performed on all devices requiring a RHA level greater
than 5k rads(Si). The post-anneal end-point electrical parameter limits shall be as specified in table I herein and shall be the
pre-irradiation end-point electrical parameter limit at +25°C ±5°C. Testing shall be performed at initial qualification and after
any design or process changes which may affect the RHA response of the device.
4.4.4.2 Neutron irradiation. Neutron irradiation for device type 02 shall be conducted in wafer form using a neutron fluence
of approximately 1 x 1014 neutrons/cm2.
4.4.4.3 Dose rate induced latchup testing. Dose rate induced latchup testing shall be performed in accordance with test
method 1020 of MIL-STD-883 and as specified herein (see 1.4 herein). Tests shall be performed on devices, SEC, or approved
test structures at technology qualification and after any design or process changes which may affect the RHA capability of the