
Table of contents
1PH813/1PH816 main motors
10 Operating Instructions, 01/2015, 610.48006.40c
5 Connection ........................................................................................................................................... 59
5.1 Mechanical connection of water cooling system .................................................................... 59
5.2 Electrical connection .............................................................................................................. 60
5.2.1 Cable routing .......................................................................................................................... 61
5.2.2 Circuit diagram ....................................................................................................................... 62
5.2.3 Terminal box .......................................................................................................................... 63
5.2.4 Power connector (for 1PH813 only) ....................................................................................... 66
5.2.5 Electrical connection data ...................................................................................................... 66
5.2.6 Motors with DRIVE-CLiQ interface ........................................................................................ 68
5.2.7 Motors without DRIVE-CLiQ interface ................................................................................... 69
5.2.8 Connecting an HTL incremental encoder .............................................................................. 70
5.2.9 Connecting the temperature sensor ...................................................................................... 72
5.2.10 Connecting a grounding conductor in the terminal box ......................................................... 72
5.2.11 Connecting the external fan ................................................................................................... 73
5.2.12 Connecting-up a converter ..................................................................................................... 76
5.2.13 Connecting a holding brake (option) ...................................................................................... 76
5.2.14 Sealing air connection (option Q12)....................................................................................... 76
6 Commissioning ..................................................................................................................................... 79
6.1 Safety instructions for commissioning ................................................................................... 79
6.2 Checklists for commissioning ................................................................................................. 82
6.3 Checking the insulation resistance ........................................................................................ 85
6.4 Switching-on and switching-off .............................................................................................. 87
6.5 Cooling ................................................................................................................................... 88
7 Operation .............................................................................................................................................. 89
7.1 Faults ..................................................................................................................................... 90
7.2 Non-operational periods ......................................................................................................... 93
8 Maintenance ......................................................................................................................................... 95
8.1 Inspection and maintenance .................................................................................................. 96
8.1.1 General inspection guidelines ................................................................................................ 96
8.1.2 Maintenance and inspection intervals .................................................................................... 96
8.1.3 Initial inspection...................................................................................................................... 97
8.1.4 General inspection ................................................................................................................. 98
8.1.5 Bearing replacement intervals ............................................................................................... 99
8.1.6 Cleaning the motor and fan (external fan) ........................................................................... 101
8.1.7 Replacing an encoder .......................................................................................................... 103
8.2 Corrective maintenance ....................................................................................................... 103
8.2.1 Removing/installing the motor .............................................................................................. 105
8.2.2 Removing/installing the speed encoder ............................................................................... 106
8.2.3 Removing/installing the toothed-wheel encoder .................................................................. 109
8.2.4 Replacing the DRIVE-CLiQ interface (encoder module) ..................................................... 112
8.2.5 Tightening torque for screwed connections ......................................................................... 113
8.2.6 Removing/mounting a holding brake (option) ...................................................................... 113