Operating Instructions
N – R 463 en 04.05
Three–phase motors with squirrel cage for low voltage,
with sleeve bearings
ANTA-355..–.. to 560..-..
ANQA-630..–.. to 800..-..
ANXA-355..–.. to 560..-..
JNTA–315..-.. to 800..-..
JNQA–500..-.. to 800..-..
JNXA–355..-.. to 800..-..
LOHER GmbH
P.O. Box 1164 94095 RUHST ORF
Hans–Loher–Str. 32 94099 RUHSTORF
GERMANY
Phone +49 8531 39–0 Fax +49 8531 32895
E–Mail: info@loher.de
http://www.loher.de
N–R 463 en 04.05 Page 1 of 26
Table of contents
Page
1. Safety and commissioning instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3. Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4. Installation and commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
5. Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
6. Additional equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
7. Spare parts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
8. Storage instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
9. Faults and remedies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
10. EC Declaration of Conformity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Appendix 1; Alignment check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Subject to modifications
Loher GmbH 2005
All rights reserved
Danger
N–R463 en 04.05Page 2 of 26
Safety and commissioning instructions
1. Safety and commissioning instructions
1.1 Safety symbols in these instructions
The symbols are used in this user manual in order to draw attention to special dangers.
This symbol indicates a dangerous situation. Fatal or serious injuries or larger material damage
can result.
This symbol shows a situation that may be dangerous. If not avoided, injuries or material damage
may result.
1.2 General
Low voltage motors have dangerous, live and rotating parts, and probably hot surfaces. All work for transport,
connection, commissioning and maintenance is to be made by qualified, responsible specialists
(EN 50110–1/VDE 0105, IEC 60364 must be observed). An inadequate behaviour can cause severe damages
to persons and property.
1.3 Specified use
These low voltage motors are meant for use in industrial plants. They are in accordance with the standards of
the series EN 60034 (VDE 0530).
The degrees of protection v IP 23 are by no means intended for outdoor use. Air–cooled types are suitable for
ambient temperatures from –20°C (–4°F) to +40°C (+104°F) as well as altitudes 1000 m above sea level.
Ambient temperature for air–/water–cooled models should be not less than +5°C (for sleeve–bearing machines,
see manufacturer’s documentation). It is imperative to observe differing data on the rating plate. The condi-
tions at the site of application must comply with all indicated data on the rating plate.
Low voltage motors are components to be installed into machines in accordance with
Directive 98/37/EG.
Commissioning is not allowed as long as the conformity of the end product with this directive is not estab-
lished (EN 60204–1 has also to be observed).
1.4 Transport, storage
The carrier is immediately to be informed on damages found upon delivery; commissioning must not be
admitted, if required. Screwed–in eye bolts are to be tightened. They are suitable for the weight of the low volt-
age motor, no additional loads are allowed to be attached. If required, sufficiently dimensioned means of trans-
port (e.g. rope guides) are to be used. Prior to commissioning the transport locking devices are to be re-
moved. Reuse for further transports. For storage of low voltage motors, take care of a dry, dustfree and
low–vibration (veff v 0.2 mm/s) ambience (bearing damages with motor at standstill).
Before commissioning the insulation resistance is to be measured. In case of values v 1k per Volt of the
rated voltage the winding must be dried. Observe the ”Storage instructions”.
N–R 463 en 04.05 Page 3 of 26
Safety and commissioning instructions
1.5 Installation
Take care of an even ground, suitable fastening of feet or flange and an exact alignment for direct coupling.
Avoid that structure–dependent natural frequencies occur within the rotary frequency and the double mains fre-
quency. Turn rotor by hand, listen to abnormal frictioning noises. Check direction of rotation before coupling
(Observe section ”Electrical connection”).
Pulleys and couplings are only allowed to be installed or removed with suitable devices (Heating!) and to be
covered with protection against accidental contact. Avoid inadmissible belt tensions (Tech. List). The bal-
ance of the low voltage motor is indicated on the shaft end face or on the rating plate (H = half key, F = full
key). In case of a half key (H), the coupling must also be balanced with a half key. In case of any protruding
and visible part of the key take care of the mass balancing.
If required, make the necessary pipe connections. Mounting types with the shaft end facing upwards are to be
provided with a cover by the customer, avoiding that foreign bodies fall into the fan.
1.6 Electrical connection
All work is only allowed to be done by qualified personnel with the low voltage motor and driven machine at
standstill, electrically dead and locked against restart.
This is also applicable to auxiliary circuits (e.g. space heater).
Check de–energizing!
A non–observance of the tolerances indicated in EN 60034–1/VDE 0530, part 1 – voltage " 5%, fre-
quency " 2%, curvature, symmetry – will result in an excessive heating and is influencing the electromagnetic
compatibility. Observe data on the rating plate as well as wiring diagram in the terminal box.
Observe connection and differing data on the rating plate as well as the wiring data in the terminal box.
Connection is to be made in such a way that a durably safe, electrical connection is maintained (no uncovered
wire ends); especially provided cable end equipment is to be used. A safe earthing is to be made.
The minimum air gaps between uninsulated and live parts themselves and to earth must not be lower than the
following values: 8 mm at UN v 550 V, 10 mm at UN v 725 V, 14 mm at UN v 1000 V.
The terminal box must be free of foreign bodies, dirt as well as humidity. Unused cable entries and the box it-
self are to be sealed against dust and water. For trial operation without driving elements the key is to be se-
cured. For low voltage motors with brake it is to be checked before putting into operation, if the brake is per-
fectly functioning.
Ventilation must not be hindered and the
outgoing air – also from adjacent units – must
not be directly sucked in again.
Danger
N–R463 en 04.05Page 4 of 26
Safety and commissioning instructions
1.7 Operation
Vibration severities in the ”satisfactory” range (V rms 4.5 mm/s) according to ISO 3945 are accept-
able in coupled–mode operation. In case of deviations from normal operation
e.g elevated temperature, noises, vibrations – disconnect machine, if in doubt.
Establish cause, consult manufacturer, if necessary.
Do not defeat protective devices, not even in trial run.
In case of heavy dirt deposits, clean cooling system at regular intervals. From time to time, open
closed condensate drain holes, if any.
In case of sleeve–bearing machines, observe time–limit for oil–change.
Refer to manufacturer’s documentation for sound power level and information about the use of ap-
propriate sound–reducing measures.
1.8 Warranty
The Warranty is only applicable if all of these instructions for safety and putting into operation as
well as the following paragraphs of the operating instructions and the directions for possible
additional units are strictly observed.
N–R 463 en 04.05 Page 5 of 26
Description
2. Description
2.1 Overall construction and design
Mounting arrangement acc. to EN 60034–7: see dimension drawing or rating plate
Horizontal arrangement IM B3
Vertical arrangement IM V1 or IM V10
Connection designations acc. to
DIN VDE 530 part 8
IEC 60034 – 8: see wiring diagram
Degree of protection acc. to
EN 60034 – 5: see rating plate
Cooling acc. to EN 60034–6:
IC 411 surface cooling or hollow–fin cooling
IC 511 tube cooling
IC 01 internal cooling
IC 611 internal cooling with mounted–on air–to–air heat exchanger
IC 81 W internal cooling with air–water heat exchanger
IC 71 W water jacket cooling
Details of the motor design are indicated in the relevant technical catalogues.
2.2 Bearings
The motors are equipped with sleeve bearings. The bearings are provided with oil-ring lubrica-
tion (with natural cooling) or with circulating oil lubrication (external oil cooling) or water cooling.
The rotor has axial play. The axial play is indicated in the dimension drawing and marked on
the motor. The additional operating instructions “Axial Play Indicator” must be
observed. It is not permissible that axial forces from the coupling or from the working machine
are transmitted to the motor bearings. (Special bearings for taking up axial forces will only be
provided if specially ordered).
2.3 Cooling
2.3.1 Surface cooling (TEFC) for the Type ANTA–... / ANQA–...
Design for fin–, hollow–fin– or tube cooling, where an external fan takes in the cooling air through
the openings in the fan cover and presses the air over the surface or through the cooling tubes of
the stator housing. In case of hollow–fin or tube cooling the heat dissipation is supported by a
closed cooling air circuit inside the motor.
2.3.2 Internal cooling for the Type JNTA–...
In case of motors with method of protection IP 23, the cooling air (ambient air) is taken in by internal
fans through air inlet openings, led over the heat–generating elements in the motor and blown out
through air outlets.
2.3.3 Internal cooling with mounted–on air–water heat exchanger for the Type JNXA–...
The motors are equipped with air–water circuit coolers. The cooling air led through the heat ex-
changer and motor is recooled in the heat exchanger and the heat loss is dissipated through the
cooling water. The heat exchangers are provided with special ribbed tubes.
2.3.4 Internal cooling with mounted–on air–to–air heat exchanger for the Type JNQA–...
The motors are equipped with an air–to–air heat exchanger. The cooling air led through the
heat exchanger and motor is recooled in the heat exchanger and the heat loss is dissipated
through air as the cooling medium.
2.3.5 Water jacket cooling for the Type ANXA–355..–.. to ANXA–560..–..
The stator housing has a double casing. It is sub–divided by spirals for water channelling and the
cooling water passes through it. This results in a good heat dissipation. Additionally, this reduces
the danger of suspended matters carried along in the water getting deposited.
N–R463 en 04.05Page 6 of 26
Description
2.4 Motor frame
2.4.1 Construction for surface cooling (TEFC), hollow–fin cooling or tube cooling
(Type ANTA–...–.. / ANQA–...)
Depending on the frame size the stator frame and end shields are made of grey cast iron or steel.
The fan cover is made of sheet steel. The stator frame surface is provided with cooling fins, hollow
fins or tubes and an attached terminal box.
2.4.2 Construction for internal cooling (ODP) for the Type JNTA–...
Depending on the frame size the stator frame and end shields are made of cast iron or steel. The
stator frame has an even surface with an attached terminal box. There are spacer fins between
stator jacket and stator pack to facilitate internal cooling.
2.4.3 Construction for internal cooling with air–water heat exchanger for the Type JNXA–...
The stator frame and end shields are of steel. The stator frame surface is plain with
mounted–on terminal box. Between the stator jacket and the stator core there are spacing ribs
to facilitate the internal cooling. An air–water circuit cooler is mounted on the ventilation open-
ings.
2.4.4 Construction for internal cooling with air–to–air heat exchanger for the Type JNQA–...
Like for the internal cooling with air–water heat exchanger, however, an air–to–air heat ex-
changer is mounted onto the ventilation openings.
2.4.5 Construction for water jacket cooling (Type ANXA–355..–.. to ANXA–560..–..)
Stator frame and end shields are made of grey cast iron or steel.
The stator jacket is designed as a double casing, through which the cooling water is led.
The housing is provided with an inlet and outlet for the cooling water.
2.5 Stator winding
The stator winding is made in an insulation class (see rating plate) acc. to EN 60034–1.
High–quality winding wires, suitable surface insulating materials and the type of impregnation pro-
vide a high level of mechanical and electrical stability with a high utilization factor and a long service
life.
2.6 Rotor
The rotor has a hard–soldered cage.
The rotor is dynamically balanced.
The balance is indicated on the shaft end or the rating plate, see Paragraph 4.1 ”Installation”.
The motors in standard design meet the requirements of vibration level N
acc. to DIN EN 60034–14 / IEC 60034–14, in special cases level R (reduced) or S (special).
2.7 Terminal boxes
If required, additional terminals for the monitoring devices are available inside the
terminal box. On special order an additional terminal box will be installed for larger motors (see
dimension drawing).
The number of available terminals is indicated in the wiring diagrams.
2.8 Monitoring devices
Monitoring devices are only available if specially ordered. See the wiring diagram.
N–R 463 en 04.05 Page 7 of 26
Transport
3. Transport
For handling during transport, the stator construction of the motor is equipped with lifting lugs, to
which the lifting hooks can be fixed.
Check whether the screwed lifting lugs are securely tightened.
Lift motors only by using these lifting lugs. Several lifting lugs must always be used
together.
Lifting the motors from other parts (e.g. shaft ends) is not permitted, since this might result in
considerable damage.
The lifting lugs are only suitable for the motor weight. Additional loads attached to the
motor must never be lifted using these lugs.
3.1 Check before installation
Check whether the motor has been damaged during transport. If the packing is damaged to such
an extent that motor damage is to be assumed, the packing should be removed in the presence
of a representative of the carrier.
3.2 Bearing lock
The rotor of the motor is axially locked by a securing device for transport that is fixed on the shaft
end or on the mounted coupling, braced against the bearing body.
Before the motor is commissionined, the securing device must be removed. Thereafter, it must be
possible to easily rotate the shaft.
The transport locking mechanism must be reused for further transports.
Prevent failures and thus avoid damage to persons and property.
The person responsible for the installation has to make sure, that
safety instructions and operating instructions are available and observed
the operating conditions and technical data acc. to the order are observed
protective equipment is used
the specified maintenance work is carried out.
N–R463 en 04.05Page 8 of 26
Installation and commissioning
4. Installation and commissioning
A most careful mounting and alignment of the motors on an absolutely even surface is impera-
tive to avoid distortions when the screws are being tightened. For machines which are to be
coupled, attention must be paid to careful alignment. See Appendix 1 for alignment checking.
Couplings that are as elastic as possible should be used.
When using pulleys, gear wheels etc., ensure that the permitted radial and axial shaft loads are
not exeecced.
Motors with surface cooling (TEFC), hollow–fin cooling or tube cooling , internal
cooling or internal cooling with air–to–air heat exchanger
(for all specified types except Type ANXA–... and JNXA–...)
The maximum permissible coolant temperature (ambient temperature at installation site) acc. to
EN 60034–1/IEC 60034–1 is 40°C (104°F) and a permissible altitude up to 1000 m above mean
sea level (other values see rating plate).
Care must be taken that the cooling air can flow unhindered into the air inlet openings and freely
pass through the air outlet openings and cannot be directly sucked in again. Suction and outlet
openings must be protected from obstructions and coarse dust.
The motors with water jacket cooling (Type ANXA–355..–.. to ANXA–560..–..)
Before commissioning the water–cooled motors, the trouble–free working of the cooling–water cir-
cuit must be ensured. It must be ensured that the motor will only be switched on when the cooling–
water circuit is in operation. The circuit must be kept in operation until the motor comes to standstill
after it is switched off. The inlet and outlet openings are located on the motor housing.
The cooling water circuit is to be monitored. Normally, the motor is equipped with PTC thermistor
sensors, which switch of f the motor if the cooling–water circuit fails. If the housing is provided with
vent plugs for the water chamber, venting should be done for the first filling and thereafter at regular
intervals.
Only clean, non–aggressive cooling water must be used. The permissible content of suspended
solids is max. 10mg/l
The inlet temperature of the cooling water should be at least 20 °C (68 °F).
Temperatures below 20 °C (68 °F) result in higher formation of condensation water and motor fail-
ure. The permissible inlet and outlet temperature, maximum pressure and the required amount of
cooling water are indicated on the motor plates.
If the motors are only allowed to operate at a coolant temperature below 0 °C (32 °F) then, because
of the reduced cooling action owing to the addition of antifreeze consultation with the motor manu-
facturer is necessary.
The motors with mounted–on air–water heat exchanger for the Type JNXA–..
Before commissioning the motors, the trouble-free working of the cooling–water circuit must be
ensured. It must also be ensured that the motor will only get switched on if the cooling–water circuit
is in operation. The cooling water circuit must be kept working until the motor comes to standstill
after it has been switched off.
The permissible inlet and outlet temperature, maximum pressure and the required amount of cool-
ing water are indicated on the motor plates.
Danger
N–R 463 en 04.05 Page 9 of 26
Installation and commissioning
4.1 Mounting
Fitting of pulleys or couplings.
First the shaft end should be cleaned (not with emery cloth) and then greased. The Pulley or coupl-
ing should be fitted only with the aid of a fitting device. The threaded centering hole in the shaft
end can be used for this purpose.. Insert a threaded bolt into the threaded hole. Then put into place
the steel washer, the diameter of which is large enough to cover the hub borehole of the pulley
or coupling.
Then fit the pulley and coupling onto the shaft end by means of a nut or a suitable hydraulic device.
The fitting of the drive elements by means of hammer blows is not permitted because of
the risk of bearing damage.
When replacing the bearings they must only be removed and reinstalled by means of suit-
able devices using the shaft centering. Only original spare parts must be used.
The rotor of the motor is dynamically balanced. The balance state is indicated on the shaft end
face or the rating plate (H = half key, F = full key). Take care of the balance for installation of the
driving element!
The balancing of the transmission elements to be fitted must be adapted to the rotor balancing.
In case of half key balancing, any protruding and visible part of the key must be removed.
The motor must only be mounted and operated according to the specified mounting arrangement
(see rating plate).
4.2 Connection, insulation resistance
Connection must only be made by an expert and in accordance with the valid safety regulations.
The relevant installation– and operating instructions as well as national and international rules must
be observed.
Note the data on the rating plate!
Compare the type of current, mains voltage and frequency (refer to item 4.3.1)!
Check the wiring diagram!
Observe the rated current for setting the protective switch!
Connect the motor in accordance with the wiring diagram provided in the terminal box!
The motor must be protected against excessive heating.
For earthing the motor is provided with an earthing terminal, which depending on the mounting ar-
rangement is either located on the frame or on the flange end shield as the case may be. In addition
all motors have a protective conductor terminal inside the terminal box.
N–R463 en 04.05Page 10 of 26
Installation and commissioning
As protection against dust and humidity unused cable entries in the terminal box must have a tor-
sionproof seal. All terminal screws and nuts have to be securely tightened to avoid excessive
transition resistances (see paragraph 4.9.2).
Protective measures are to be taken.
In case of terminal boards with U–shaped terminal washers the
conductors to be connected have to be bent in U–shape and
placed underneath the terminal washers. See sketch!
In case of motors with terminal boxes which have ground surfaces between cover and base a thin
grease film is to be applied for sealing and against corrosion.
After longer storage periods or standstill (see paragraph 8.1.2) the insulation resistance of the
winding must be measured phase against phase and phase against ground before putting into
operation.
Humid windings might cause creeping currents, arcing and ruptures. In case of values 1 k per
Volt of rated voltage measured at a winding temperature of 20 °C (68 °F) the winding must be dried.
The cable entries, lead entries and connecting cables must be suitable for the ambient tem-
peratures that occur.
N–R 463 en 04.05 Page 11 of 26
3.2
Installation and commissioning
4.3 Direction or rotation and designation of the terminals acc. to
DIN VDE 0530–8/IEC 60034–8
4.3.1 In the case of motors with only one direction of rotation, the direction of rotation is marked on the
motor with an arrow. Terminals U1, V1, W1 to phases L1, L2, L3 (in alphabetical or natural order)
always results in right–handed rotation.
This applies to all motors, even if they are not suited for right–handed rotation.
4.3.2 Changing the direction of rotation:
The rotational direction can be switched by exchanging two supply lines on the motor terminal
board.
For a machine with only one shaft end or two shaft ends with different thicknesses, the direction
of rotation is that seen an observer when he views the outer face of the only shaft end or the thicker
shaft end.
4.3.3 In case of forced ventilation, the direction of rotation is separately marked by an arrow on the forced
ventilation system itself.
4.4 Air–water heat exchanger
(motors with air–water heat exchanger of the type JNXA–...)
For connection and commissioning the instructions for air–water heat exchangers must be con-
sidered. The permissible inlet and outlet temperature, maximum pressure and the required
amount of cooling water are indicated on the motor plates.
4.5 Oil supply
The diameter of the piping must be chosen in such a way that for the supply line the flow rate does
not exceed 1.5 m/s approx.; for the return line the flow rate should not exceed 0.15 m/s.
If a gradient of 15° in the return line cannot be realized because of constructional reasons,
correspondingly large diameters must be installed in order to avoid a back draft of oil, which could
cause overflowing of the bearing.
Welded and hot-bent, rusty or internally significantly dirty piping must be pickled before installation.
After installation of the piping the whole oil circuit must be flushed in order to avoid bearing damage
by contamination. Use kerosene or flushing oil. For this purpose all measuring fittings (pressure
switches etc.) must be removed and their connections must be closed. After flushing, the filters
must be cleaned.
The bearings must never be left in the flushing circuit under any circumstances.
For filling the bearing lube oil by collecting units, for example in connection with gears, a corre-
sponding filter must be provided in the pressure pipe to the motor . Further, before every bearing
a suitable pressure reducing valve must be provided in the pressure pipe, using which the oil pres-
sure can be adjusted from 0.2 to 0.8 bar (at operating temperature). W e recommend installing elec-
tronic flow indicators in the discharge lines behind the bearings to be able to check the oil circuit.
Flow inspection glasses are provided as a standard feature.
N–R463 en 04.05Page 12 of 26
3.2
Installation and commissioning
4.6 Sleeve bearings
In order to avoid leaking of the oil during transport, the bearings of the motors are delivered without
bearing oil from the factory. Prior to commissioning, the bearings must be filled with oil up to the
oil level mark and up to the oil return respectively.
The viscosity class acc. to DIN 51519 of the bearing lube oil and the oil quality respectively are
indicated on an instruction plate at the motor.
In general, any branded mineral oil with low foaming property and good ageing stability, which has
the specified viscosity can be used as lubricant. If for any reason a lube oil with a viscosity deviating
from that specified is to be used, a confirmation from the motor manufacturer is required. In case
of greater deviations, the calculations for the bearings must be performed afresh.
If synthetic oils are used, attention must be paid to ensure that only PAO (Poly-Alpha-Olefine) oils
are used. For all other synthetic oils, it is necessary to consult the motor manufacturer!
The use of motors with sleeve bearings is generally permissible from an ambient temperature
of = 0 º C, unless special measures have been taken (e.g. bearing heating).
The lower limiting temperature is then specified on the rating plate.
At lower ambient temperatures, the lubricating oil must have a pour point of at least 10 Kelvin
below the ambient temperature.
In the case of sleeve bearings that are lubricated with oil circulation, in order to ensure suffi-
cient oil flow in the oil inlet pipes, the inflow temperature of the oil must not drop below + 10 ºC.
4.7 Sleeve bearings for oil-ring lubrication with water cooling
See dimension drawing or instruction plate on the motor!
Make sure that the motor is only switched on, when the cooling water circuit is operating. It must
be kept running till the motor comes to a stillstand after switch-off.
Cooling water supply for sleeve bearings
In order to achieve an ef fective cooling of the bearings, the cooling water inlet temperature should
be kept as low as possible!
The water speed should not exceed 1.5 m/s to avoid damage by cavitation, which occurs particu-
larly in the pipe elbows. The customer should provide the corresonding regulating devices.
Unpressurized discharge of the water is required. It must be possible to drain the cooling water
circuit.
To control the cooling water circuit it is recommended that electronic flow indicators be installed
behind the bearings in the discharge lines.
The cooling water requirement, max. cooling water inlet temperature, max. cooling water pressure
etc. are indicated on the instruction plates at the motor.
N–R 463 en 04.05 Page 13 of 26
3.2
Installation and commissioning
4.8 Check before commissioning
– Observe data on the rating plate!
– Check whether voltage and frequency of the motor comply with the mains data!
– Check whether the bearing lock has been removed!
See Paragraph 3.2 “Bearing lock”.
– Check whether the bearing is properly filled with oil.
– Check whether the oil-ring is seated on the shaft in the correct position!
– Check whether, for the bearings, the oil circuit for oil lubrication is in operation!
– Check whether the rotor is located in the magnetic center!
– Check at starting up whether the oil ring is running freely and provides a perfect
oil supply for the sleeve bearing!
– Check at the bearings for water cooling, whether the cooling water circuit is in operation!
– Check whether the direction of rotation is correct!
– Check whether the motor is protected as specified in the regulations!
– Check whether the electrical connections are securely tightened and whether the
monitoring devices are correctly connected and adjusted!
– Check whether protective measures have been taken: earthing!
– Check coolant temperature!
– Check whether additional equipment – if present – is functioning.
– Check whether the cooling air inlet openings and cooling surfaces are clean!
– If a condensation water drain hole exists, open the hole for a short time, so that the
condensation water that may have accumulated can be drained.
– Check the insulation resistance of the stator winding!
– Check whether the motor is securely fixed!
– In case of a belt drive, check the belt tension!
– Check whether the cover of the terminal box is closed and whether the cable
entrances are properly sealed.
– In cade of water-cooled motors, check whether the cooling water circuit is in operation!
– For motors with forced ventilation, check whether the forced ventilation
is functioning and in operation when the main motor is switched on.
N–R463 en 04.05Page 14 of 26
Installation and commissioning
4.9 Tightening torques for screwed joints
4.9.1 General
If no other data is indicated, the following torque limits (screw and nut) are applicable to
threaded joints.
Note: Screws which become unusable have to be replaced by
new ones of the same strength class and type.
4.9.2 Screwed joints for electrical connections
Thread Tightening torque [Nm] Thread Tightening torque [Nm]
M 4 1.2 M 12 15.5
M 5 2M 16 30
M 6 3M 20 52
M 8 6M 24 80
M10 10 M 30 150
4.9.3 Screwed joints strength class 8.8 and A4–70
Tightening torques for screws of the strength class 8.8 and A4–70 (A4–80) only in components
with higher strength (e.g. grey cast iron, steel).
Thread Tightening torque [Nm] Thread Tightening torque [Nm]
M 4 2.3 M 14 105
M 5 4.6 M 16 160
M 6 7.9 M 20 330
M 8 19 M 24 560
M10 38 M 30 1100
M 12 66 M 36 1900
4.9.4 Screwed joints strength class 5.6
Tightening torques for screws of the strength class 5.6, 4.6, A2 or for screws in components
with lower strength (e.g. aluminium).
Thread Tightening torque [Nm] Thread Tightening torque [Nm]
M 4 1.1 M 14 49
M 5 2.1 M 16 75
M 6 3.7 M 20 150
M 8 8.9 M 24 260
M10 18 M 30 520
M 12 30 M 36 920
N–R 463 en 04.05 Page 15 of 26
Maintenance
5. Maintenance
The person responsible for the facility must ensure that the specified maintenance work
is carried out properly.
5.1 Bearings, lubrication and cooling of the bearings
The bearings of these motors are constructed in two parts. The bearing shells allow self-adjust-
ment under load.
The bearing surfaces are subjected to a precise machining. Rescraping of the surfaces should
therefore be strictly avoided under any circumstances. The oil rings are essential for the bearings
and require careful treatment. They must be protected against damage and deformations.
5.1.1 Sleeve bearings with oil-ring lubrication (natural cooling)
The big ribbed housing surface of the bearings guarantees good cooling.
The bearing housings must be kept clean form the outside in order not to affec the heat radiation
owing to dust or dirt deposits.
Lubrication is done automatically by oil-ring lubrication. The oil rings are absolutely essential for
the bearing. Prior to commissioning, the bearings must be filled with oil up to the oil level mark.
Commissioning
After starting the bearings must be continuously monitored during the first hours, for the following
parameters
a) Bearing temperature
The temperature should rise constantly up to the steady-state temperature. If the steady-state
point does not occur below 90 °C (194 °F), the equipment must be stopped and the reasons
determined. If operating temperatures have been indicated for the bearings, the reasons have
to be found, in case of downward deviations (cold bearings)as well. For example, it is possible
that the thermometers are defective.
b) Oil leaks
The bearings must not lose oil, neither on the lateral bore holes nor at the parting line or the
oil levels, screw plugs etc. Check whether unused connection holes are plugged. In case of oil-
ring lubricated bearings an oil loss can quickly result in destruction of the bearing
surfaces.
c) Running smoothness
The running smoothness of an equipment depends on many influencing factors. If uneven
running occurs during the commissioning, the equipment must be stopped at once and the
cause must be eliminated.
N–R463 en 04.05Page 16 of 26
Maintenance
Check after commissioning
– Check whether the motor is running smoothly.
– Check whether the oil ring is seated on the shaft and runs freely.
Oil change periods
The first oil change should be done after 600 – 700 operating hours.
Die Ölwechselfristen sind auf einem Hinweisschild am Motor gestempelt.
5.1.2 Plain bearings for oil circulation lubrication (external oil cooling)
Bearing cooling is ensured through the oil circulation lubrication.
The maintenance of the oil circulation must be monitored by the system.
The large–fanned housing surface of the bearings guarantees additional cooling.
The bearing housings must be kept clean externally in order not to disturb the heat radiation with
dust or dirt deposits.
Lubrication i s carried out automatically via the loose ring lubrication. The lubrication rings are abso-
lutely essential for the bearing.
For commissioning, bearing temperature, oil sealing, running quietness and checking: refer to sec-
tion 5.1.1
5.1.3 Plain bearings with loose ring lubrication and water–cooling
Bearing cooling is guaranteed by the oil circulation lubrication.
The maintenance of the oil circulation must be monitored by the system.
The large–fanned housing surface of the bearings guarantees additional cooling.
The bearing housings must be kept clean externally in order not to hinder the heat radiation with
dust or dirt deposits.
Lubrication takes place automatically via the loose ring lubrication. The lubrication rings are essen-
tial for the bearing. Before commissioning, the bearings must be filled with oil up to the oil level
mark.
For commissioning, bearing temperature, oil sealing, running quietness and control after commis-
sioning: refer to section 5.1.1
5.2 Bearing insulation short–circuiting
If both bearings are insulated, the bearing insulation on the drive end has to be neutralized
during operation by attachment of a short–circuiting (jumper) cable.
This measure avoids the build-up of a dangerous voltage potential in the rotor.
The motor has an instruction plate attached with the following text:
“Attention, both bearings insulated.
During operation the DE bearing insulation must be short–circuited.”
N–R 463 en 04.05 Page 17 of 26
Maintenance
5.3 Checking the bearing insulation
The bearing insulation short–circuit may be neutralized by disconnecting the short–circuiting
cable only at stillstand. Insulation of the bearings can now be checked. Upon completion of the
insulation test, reconnect the short–circuiting cable.
5.4 Venting filters
The sleeve bearing on the driven side or, with air outflow dampers, even the drive–side sleeve
bearing, have screwed–on venting filters.
The venting filters must be subjected to a visual inspection.
The visual inspection can be carried out while the machine is running.
Danger of accidents! Pay attention to rotating parts.
No dirt or dust may be allowed to penetrate into the air pipe of the sleeve bearing.
The lubricating oil must not get dirty.
Cover the air pipe during the visual inspection. Do not forget! Put the venting filter on again.
5.5 Maintenance of the venting filters
A visual inspection of the venting filters is neessary, with normal use, after 1 year and in case
of applications with dust and sand pollution, after year.
In case of intense dirtying, the venting filter must be replaced with an original spare part.
5.6 Avoiding mechanical damage (bearing damage)
All machines must be regularly inspected for mechanical damage. Particular attention must be
paid to compliance with the prescribed oil–changing intervals.
In case of bearings with external oil supply, the owner/operator must monitor the preservation
of the lubrication by suitable means.
The plant must be switched off when the permissible temperature is exceeded, but not later
than at 100º C.
The bearing insulation, if present, must always conform to DIN 31692–4 and must never be
bridged (e.g. by a thermometer) or reduced.
N–R463 en 04.05Page 18 of 26
Maintenance
Regular checking of the lubricant level must be carried out, in case of self–lubricating bearings,
through the oil level glass or with level monitoring, or, in the case of externally lubricated bea-
rings, by means of a flow monitoring system to be provided by the owner/operator. If the per-
missible limiting values are exceeded or undershot, the machine must be switched off without
delay.
In case of circulation system lubricated bearings, continuous oil filtering must be provided.
The mesh width of the oil filter must not exceed 20 mm.
5.7 Terminal locations, terminals, ventilating passages
Depending on the operating conditions, the following should be done at certain intervals
cleaning the terminal locations and terminals
checking the electrical connections with regard to firm seating
(see Paragraph 4.9.2 for tightening torques).
cleaning the cooling air passages.
The cooling air inlets and the cooling surfaces must be protected against obstruction and
contamination.
If required, the water chambers must be flushed and cleaned of deposits.
Never use sharp–edged tools for cleaning.
5.8 Air–water heat exchanger
(Motors with air–water heat exchangers of the type JNXA–...)
For maintenance, please consider the instructions for the air–water heat exchangers.
5.9 Condensation water drain hole
If the motor has a condensation water drain hole, it has to be opened at regular intervals to have
the accumulated condensation water can drain off.
Care must be taken to seal the condensation water drain hole by a screw with lock washer
to ensure the method of protection.
N–R 463 en 04.05 Page 19 of 26
4.2
Additional equipment
6. Additional equipment
On special order only.
6.1 Temperature monitoring *)
The temperature sensors for monitoring e.g. the stator winding temperature, the bearings, the
coolant must be connected by one or several additional terminal boxes.
The temperature sensors have to be connected according to the relevant connection diagram.
The specifications and instructions acc. to Paragraph 4.2 ”Connection” are applicable to the con-
nection.
6.2 Space heater *)
Heating capacity and connection voltage: See instruction plate on the motor. The space heater has
to be connected by an additional terminal box according to the relevant connection diagram.
The specifications and instructions according to Paragraph 4.2 “Connection” are applicable to the
connection. Operation of the space heater is only allowed when the motor is switched off. The
space heater must never be switched on during motor operation.
6.3 Forced ventilation *)
Observe direction of rotation! (see arrow for direction of rotation.)
Forced ventilation must be connected according to the wiring diagram inside the terminal box.
During operation of the main motor, the forced ventilation motor must be switched on!
The forced ventilation dissipates the heat loss during operation of the main motor. When switching
off the main motor, the forced ventilation must be continued on a a temperature–dependant basis.
6.3.1 To be checked when commissioning the main motor:
Check whether the forced ventilation works and is in operation when the main motor is
switched on!
*) On special order only
7. Spare parts and components
When ordering spare parts, please state:
Spare part designation
Motor type
Motor serial number
Example: End shield DE
ANTA–450LM–02A
5 134 004
The type and serial number of the motor can be taken from the rating plate.
N–R463 en 04.05Page 20 of 26
Storage instructions
8. Storage specifications
8.1 For motors which have to be stored for a period of up to 2 years, the fol-
lowing must be observed:
8.1.1 Storage
8.1.1.1 The motors are to be stored dry, dustfree and at room temperature. No special packing is then re-
quired. Otherwise the motors must be packed in plastic foil with hygroscopic substances (e.g. Bra-
nogel) or sealed in an air–tight foil. Protective cover must be provided against sun and rain.
8.1.1.2 In order to avoid secondary failures at the bearings caused by vibrations at standstill, for example
by adjacent running machines, the motors are only allowed to be stored in vibrationless rooms.
8.1.1.3 For transport, motors with sleeve bearings must be equipped with a bearing lock on the
drive side. It must remain locked until commissioning or re-installed after an inspection or a trial
operation.
8.1.1.4 The motors are delivered and stored without oil filling in the bearings. In order to protect the
sleeve bearings incl. the motor shaft against corrosion until commissioning, the following measu-
res must be taken:
All the openings must be sealed,
the threaded holes must be fitted with plugs,
the connection flanges must be fitted with blank flanges,
the gap between gasket and shaft or gasket and housing must be covered (self-adhesive, durable
tape).
Remove the glass cover on the bearing housing; with a pneumatic spraying gun, spray an
anti-corrosive through this opening. This medium (e.g. Valvoline Tectyl 511 M) must be such that
it does not have to be removed for commissioning the motor.
Put a bag with hygroscopic filling (e.g. Branogel) below the glass cover to avoid condensation water
being generated. Then, screw down the bearings tight again.
If the period of 1/2 year from the date of conservation to the date of commissioning is exceeded,
the conservation steps described above must be repeated.
Prior to commissioning the hygroscopic fillings must be removed from the bearing housings and
the sleeve bearing must be filled up with bearing oil up to the marking on the oil level indicators.
The viscosity class of the bearing oil and the oil change intervals are indicated on an additional
plate.
8.1.1.5 In case of motors with sealed condensation water drain holes, it might be necessary to have the
condensation water drain out. Afterwards, the boreholes must be sealed again.
N–R 463 en 04.05 Page 21 of 26
Storage instructions
8.1.2 Commissioning
8.1.2.1 Before commissioning the insulation resistance of the winding must be measured by qualified per-
sonnel phase against phase and phase against mass. Damp windings may cause leakage cur-
rents, arcing and ruptures. In case of values 1 k per V olt of rated voltage measured at a winding
temperature of 20 °C (68 °F) the winding must be dried. Drying is possible by feeding of the winding
with single phase a.c. current. The voltage has to be adjusted in a way that the recommended va-
lues of the heating current in accordance with Illustrations a) and b) are not exceeded.
The temperature should reach approx. 80 °C (176 °F) and be active for several hours. Drying is
also possible in a drying kiln.
IMAX = 65 % IrIMAX = 75 % Ir
a) Db) Y
Recommended heating circuits and maximum heating currents
8.1.2.2 In the case of motors with a bearing lock, the bearing lock must be removed before commissioning.
8.1.2.3 Prior to commissioning the hygroscopic substances must be removed from the bearing
housings and the sleeve bearing must be filled up with bearing oil up to the marking on the oil level
indicators. The viscosity class of the bearing oil and the oil change intervals are indicated on an
additional plate.
8.1.3 For motors which are transported and stored in assembled condition with the machine
to be driven the following must be observed:
8.1.3.1 Storage
a) The free shaft ends must be greased before installation of the motors, as also the other naked
metal parts, e.g. foot- and flange surfaces or supporting faces of terminal boxes and covers. As
protection against dust and humidity, grease seals with antifriction bearing grease, must be instal-
led at the shaft opening.
b) A hygroscopic substance (e.g. Branogel) must be filled in the terminal boxes of the motors.
c) The machines are to be stored dry, dustfree and in a temperature-controlled room.
d) For the additional measures, the specifications according to the items 8.1.1.2 – 8.1.1.5 are appli-
cable.
N–R463 en 04.05Page 22 of 26
Storage instructions
8.1.3.2 Commissioning
Before commissioning, the hygroscopic substance (e.g. Branogel) must be removed from the ter-
minal boxes and the measures according to 8.1.2 must be carried out.
8.1.3.3 For outdoor storage, the following is additionally required:
Protective cover must be provided against the influence of sun and rain, exchange of air must be
possible to avoid condensation water.
After 2 months, a check must be carried out, whether the protective measures according to
8.1.3.1a are still present and functioning.
8.2 For motors which are stored for more than 2 and up to 3 years before commission-
ing,
the following apllies in addition:
8.2.1 Storage
8.2.1.1 The manufacturer must be informed about the storage time in the purchase order.
8.2.1.2 Terminal box covers must be provided with grease seals (e.g. antfriction bearing grease).
8.2.1.3 A hygroscopic substance (e.g. Branogel) must be present in the terminal boxes.
8.2.1.4 Further measures according to Paragraph 8.1.1.4.
8.2.2 Commissioning
8.2.2.1 Before commissioning the hygroscopic substance (e.g. Branogel) must be removed
from the terminal boxes.
Further measures according to Paragraph 8.1.2.
8.3 For motors with sleeve bearings that are stored for more than 3 years,
Paragraphs 8.1.1 and 8.1.3 are applicable and in addition for the sleeve bear-
ings as follows:
8.3.1 Storage
The sleeve bearings must be completely dismantled and all points and components subject to cor-
rosion including the motor shaft have to be treated with Valvoline Tectyl 164 for conservation.
The dry film thickness is 100 to 150 µm, wet film thickness 200 µm. Seaworthy packing of the com-
ponents is required.
The conservation of the dismantled bearing and of the motor shaft must be checked in regular inter-
vals of 2 years and renewed if insufficient.
8.3.2 Commissioning
Prior to commissioning the conservation has to be removed by means of solvent Valvoline 150 or
kerosene or a general solvent.
Assemble the bearing and fill it up with bearing oil up to the marking on the oil level indicators. The
viscosity class of the bearing oil and the oil change intervals are indicated on an additional plate.
Further measures according to Paragraph 8.1.2 and 8.2.2.
N–R 463 en 04.05 Page 23 of 26
Storage instructions
8.4 If motors with direct water jacket cooling or with air–water cooler
(Type ANXA–... or JNXA–... )
are stored at temperatures up to –20 °C (–4 °F) the following must be ob-
served in addition to the instructions in Points 8.1 and 8.2:
The water has to be removed completely from the air–water coolers.
In any case, the coolers must be dried completely with hot air at max. 60 °C (140 °F) and then
sealed.
Motors with coolers must be stored in a dry and dustfree room.
8.5 Further to these storage instructions all data in these operating instruc-
tions must be taken into account.
The manufacturers warranty is only applicable if all of the above men-
tioned items are strictly observed.
N–R463 en 04.05Page 24 of 26
Faults and remedies
9. Faults and remedies
Fault Possible causes Remedy
Bearing is too hot Bearing noise Motor runs
unevenly
y
No or insuf ficient oil circuit in case
of circulating-oil lubrication Activate the oil circuit
Bearing surface dirty Clean bearing surface
Wrong oil viscosity Check oil quality
Coupling forces are pulling
or pushing Realign motor exactly, correct cou-
pling
Too little oil in the bearing Fill up according to specifications
Coolant temperature above 40 °C
(104 °F) Adjust temperature of cooling air
Bearing shell worn e.g. caused by
motor start without bearing oil Replace bearing shell
Inbalance caused by coupling Exact balancing
Motor fastening too unstable Check fastening
Fault Possible causes Remedy
Motor does
not start Motor is too
hot High de-
crease in
speed
Protective
device
triggers Countertorque too high Check motor torque and
load torque
Mains voltage too low Check mains conditions
Phase interruption Check mains supply
W rong winding connection Follow the wiring diagram and
rating plate
Overload Compare data on rating plate
Too many starts per hour Observe rated duty type
Insufficient ventilation Chec k ventilation pass ages, check
direction of rotation
Insufficient cooling Cooling water Check inlet and out-
let temperature
Ventilation passages dirty or cooling
water circuit obstructed Clean
Short-circuit of winding or
terminal board Measure insulation resistance
Starting time exceeded Chec k starti ng conditions
N–R 463 en 04.05 Page 25 of 26
EC Declaration of Conformity
10. EC Declaration of Conformity
N–R463 en 04.05Page 26 of 26
Appendix 1
Servicebericht / Service report
Überprüfung der Ausrichtung /
Alignment check
Seite /
Page
...
Servicenr. / Service No.: Bestellnr. / Order No.:
Typ / Type: Seriennr./ Serial No.:
Kupplungstyp / Coupling type: Durchmesser / Diameter:
Empfohlene Ausrichtgenauigkeit / Recommended accuracy for alignment*
Drehzahl / Speed
(rpm)
750
1500
3000
Parallelversatz / Parallel offset
(1/100 mm)
9
6
3
Winkelversatz / Angular offset
1/100 mm pro / 1/100 mm each
9
5
2.5
Gemessene Werte an der Kupplung / Measured values at the coupling
Parallelversatz / Offset Winkelversatz / Angular offset
Messung /
Measure-
ment
Bemerkungen / Comments
* Falls keine Werte vom Kupplungshersteller vorgeschrieben sind / If no values were specified by the coupling manufacturer
LOHER GmbH
P.O. Box 1164 94095 RUHSTORF
Hans–Loher–Str. 32 94099 RUHSTORF
GERMANY
Phone +49 8531 39–0 Fax +49 8531 32895
E–Mail: info@loher.de
http://www.loher.de
Satz Loher – Druck Loher 04.05 Printed in Germany