System Manual Edition 11/2003 Part of Totally I n t e gr a t e d Automation ecofast Introduction and Notes, Contents System ECOFAST System Manual Order number 3RK1703-0BB18-0AA0 ECOFAST System Description 1 Power & Control Modul (PCM) IP65 2 Power & Control Modul (PCM) Cabinet Installation 3 Power Tee Connectors 4 Hybrid Field Bus Connections 5 Data Tee Plug Connector 6 Discriminating Module 7 Installation Guidelines 8 Wiring and Interfaces 9 Questions and Answers A ECOFAST Pilot Project B Order numbers C Glossary Edition 11/2003 GWA 4NEB 950 5060-02 Safety Guidelines This manual contains notices which you should observe to ensure your own personal safety, as well as to protect the product and connected equipment. These notices are highlighted in the manual by a warning triangle and are marked as follows according to the level of danger: Danger indicates that death, severe personal injury or substantial property damage will result if proper precautions are not taken. Warning indicates that death, severe personal injury or substantial property damage can result if proper precautions are not taken. Caution indicates that minor personal injury or property damage can result if proper precautions are not taken. Caution indicates that property damage can result if proper precautions are not taken. Note draws your attention to particularly imporant information on the product, handling the product, or to a paricular part of the documentation. Qualified Personnel Only qualified personnel should be allowed to install and work on this equipment. Qualified persons are defined as persons who are authorized to commission, to ground, and to tag circuits, equipment, and systems in accordance with established safety practices and standards. Correct Usage Note the following: Warning This device and its components may only be used for the applications described in the catalog or the technical descriptions, and only in connection with devices or components from other manufacturers which have been approved or recommended by Siemens. This product can only function correctly and safely if it is transported, stored, set up, and installed correctly, and operated and maintained as recommended. Trademarks SIMATIC(R), SIMATIC HMI(R), ECOFAST(R) and SIMATIC NET(R) are registered trademarks of SIEMENS AG. Han Brid (R), Han Q8(R), Han 10E(R) are registered trademarks of Harting. Some of other designations used in these documents are also registered trademarks; the owners rights may be violated if they are used by third parties for their own purposes. Copyright Siemens AG 2003 All rlghts reserved Disclaimer of Liability The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. We have checked the contents of this manual for agreement with the hardware and software described. Since deviations cannot be precluded entirely, we cannot guarantee full agreement. However, the data in this manual are reviewed regularely and any necessary corrections included in subsequent editions. Suggestions for improvement are welcomed Technical Assistance: Telephone: +49 (0) 9131-7-43833 (8 - 17 MEZ) Fax: +49 (0) 9131-7-42899 E-mail: nst.technical-assistance@siemens.com Internet: www.siemens.de/lowvoltage/technical-assistance Technical Support: Telephone: +49 (0) 180 50 50 222 Siemens AG Automation & Drives Low Voltage Controls and Distribution D-91050 Erlangen Siemens Aktiengesellschaft (c) Siemens AG 2003 Technical data subject to change. Contents Contents 1 ECOFAST System Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 Philosophy of the ECOFAST System . . . . . . . . . . . . . . . . . . . . . . Requirements Specified for Innovative Automation and Drive Systems . Desina and Field Bus Certificates. . . . . . . . . . . . . . . . . . . . . ECOFAST certified and ECOFAST integrated . . . . . . . . . . . . . . . . . . ECOFAST ES Software . . . . . . . . . . . . . . . . . . . . . . . . . . The ECOFAST Basic System . . . . . . . . . . . . . . . . . . . . . . . . . . . Topology of the Network . . . . . . . . . . . . . . . . . . . . . . . . . Overview of Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . .. .. . . . .. .. . . . . . . 1-2 1-3 1-4 1-4 1-5 1-5 1-6 1-8 2 Power & Control Module (PCM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1 2.2 2.3 2.3.1 2.3.2 2.3.3 2.4 2.5 2.6 Description . . . . . . . . . . . . . . . . . . . . Connections of the IP 65 Version . . . . . . Installation and Wiring of the IP 65 Version Installation . . . . . . . . . . . . . . . . . . . . Wiring . . . . . . . . . . . . . . . . . . . Commissioning . . . . . . . . . . . . . . . Diagnostics . . . . . . . . . . . . . . . . . . . . Dimension Drawings . . . . . . . . . . . . . . Technical Specifications . . . . . . . . . . . . .. .. .. .. .. .. .. .. . . . . . . .. .. .. .. .. .. 2-2 2-5 2-7 2-7 2-8 2-10 2-11 2-13 2-14 3 Power & Control Module (PCM), Cabinet Installation . . . . . . . . . . . . . . . . . . . . 3-1 3.1 3.2 3.3 3.3.1 3.3.2 3.3.3 3.4 3.5 3.6 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connections of the Cabinet Installation Version . . . . . . . . Installation and Wiring of the Cabinet Installation Version . . Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . Commissioning . . . . . . . . . . . . . . . . . . . . . . . Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dimension Drawings . . . . . . . . . . . . . . . . . . . . . . . . Technical Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. 3-2 3-5 3-6 3-6 3-7 3-9 3-10 3-12 3-13 4 Power Tee Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.1 4.2 4.3 4.4 4.5 Description . . . . . . . . Connections . . . . . . . Installation and Wiring . Dimension Drawings . . Technical Data . . . . . . 4-2 4-5 4-6 4-8 4-9 ECOFAST System Manual GWA 4NEB 950 5060-02 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . .. .. . . . .. .. . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .. . . .. . . . . .. .. .. .. . . . . .. .. .. .. .. .. .. . . . . .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i Contents 5 Hybrid Field Bus Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.1 5.2 5.3 5.3.1 5.3.2 5.3.3 5.4 5.5 5.6 5.7 5.7.1 5.7.2 5.7.3 5.7.4 5.7.5 5.7.6 5.7.7 5.7.8 5.7.9 5.7.10 5.7.11 5.7.12 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation, Wiring, and Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dimension Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Passive Hybrid Field Bus Connection for Supply . . . . . . . . . . . . . . . . . . . . . Passive Hybrid Field Bus Connection for Conducting . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Supply . . . . . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Conducting . . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Supply . . . . . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Conducting . . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Supply . . . . . . . . . . . . . . . . . . . . . . Active Hybrid Field Bus Connection for Supply . . . . . . . . . . . . . . . . . . . . . . Conveyor Section With Hybrid Field Bus Connections for Supply and Conducting . Installation Method with PROFIBUS-DP - Cu . . . . . . . . . . . . . . . . . . . PROFIBUS-DP - Optical-Fiber Cable . . . . . . . . . . . . . . . . . . . . . . . . PROFIBUS-DP (Cu) and Passive Hybrid Field Bus Connections with 2 Separate Power Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . 5.7.13 PROFIBUS-DP (Cu) and Active Hybrid Field Bus Connections with 2 Separate Power Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . 5.7.14 PROFIBUS-DP (Optical-Fiber Cable) and Passive Hybrid Field Bus Connections with 2 Separate Power Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . . . . . . . . . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . 5-1 5-2 5-4 5-7 5-7 5-8 5-10 5-11 5-12 5-13 5-14 5-14 5-15 5-16 5-17 5-18 5-19 5-20 5-21 5-22 5-23 5-24 . . . .5-25 . . . .5-26 . . . .5-27 6 Data Tee Plug Connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6.1 6.1.1 6.2 6.2.1 Description . . . . . . Pin assignment . . . Dimension Drawing Technical Data . . . 6-2 6-3 6-4 6-5 7 Discriminating Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7.1 7.2 7.3 7.3.1 7.3.2 7.3.3 7.4 7.5 7.6 7.7 Description . . . . . . . . Connections . . . . . . . Installation and Wiring . Setting the Address . . Required Components. Installation. . . . . . . Commissioning . . . . . Messages . . . . . . . . Dimension Drawing . . Technical Specifications 7-2 7-3 7-4 7-4 7-5 7-6 7-7 7-7 7-8 7-9 .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . .. . . . . . . . . . . . . . . . . . . . . . . .. . .. . .. . .. ECOFAST System Manual ii GWA 4NEB 950 5060-02 Contents 8 Installation Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8.1 8.2 8.3 8.3.1 8.3.2 8.4 8.5 8.5.1 8.5.2 8.5.3 8.5.4 8.5.5 8.5.6 Installation Guidelines for PROFIBUS-DP with ECOFAST Hybrid Field Bus Cable . . . . . Installation Guidelines for PROFIBUS-DP with DESINA Hybrid Field Bus Cable . . . . . Guidelines for PROFIBUS-DP standard cables. . . . . . . . . . . . . . . . . . . . . . . . . . Potential equalization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cable Shielding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PNO Installation Guideline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power Bus Installation Variants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation with Power Tee Connector and Power Cable (Prefabricated) . . . . . . . . . . Installation with Power Tee Clamping Connector and Power Cable (Not Prefabricated) Sub-Segments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ET 200X Sub-Segments with EM300 Motor Starter . . . . . . . . . . . . . . . . . . Possible power distribution with discriminating modules . . . . . . . . . . . . . . . . Line Protection in Power Bus Segment for Motor Starters Without Thermal Motor Model (Installation Near Motor) . . . . . . . . . . . . . . . . 8-2 8-3 8-6 8-6 8-7 8-9 8-10 8-10 8-11 8-12 8-13 8-15 . . . . . . . . . . . . . 8-16 9 Wiring and Interfaces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.1 9-1 9.2 9.2.1 9.2.2 9.3 9.3.1 9.3.2 9.3.3 9.4 9.4.1 Securing Plug in Connections that are not Safe Against Finger Touch When Using Frequency Converters . . . . . . . . . . . . . . . . . . . . . Wiring Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Selecting the power leads. . . . . . . . . . . . . . . . . . . . . . . . . . . Unused Connections . . . . . . . . . . . . . . . . . . . . . . . . . Power Cables Prefabricated at One End . . . . . . . . . . . . . . . . . . Power Cables Prefabricated at One End with Han Q8 Pin . . . . . . . . Power Cables Prefabricated at One End with Han 10E Pin . . . . . . Prefabricating Power Cables . . . . . . . . . . . . . . . . . . . . . AS Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connection Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3 9-4 9-4 9-5 9-6 9-6 9-7 9-8 9-10 9-10 A Questions and Answers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 A.1 Frequently Asked Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 B ECOFAST Pilot Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 B.1 B.2 2.2.1 Production line for SIRIUS 2 - Siemens Cham . . . . . . . . . . . . . . . . . . . . . . . . . . . Configuration in the Automotive Industry - Production Planning . . . . . . . . . . . . . . . . Configuration with ECOFAST ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-2 B-5 B-6 C Order numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1 C.1 C.2 C.3 C.4 C.5 C.6 C.7 C.8 C.9 C.10 Motor Starters (Reversing starters) . . . . . . . . . Motor Connection Cables and Power Cables. . . . Power & Control Modules (Infeed Modules) . . . . Discriminating Modules . . . . . . . . . . . . . . . . Hybrid Fieldbus Cables . . . . . . . . . . . . . . . . AS-Interface Shaped Cable . . . . . . . . . . . . . . Hybrid Fieldbus Interfaces . . . . . . . . . . . . . . Connectors . . . . . . . . . . . . . . . . . . . . . . . . Project engineering software and Documentation Tools, Connector Sets, Configuration . . . . . . . . ECOFAST System Manual GWA 4NEB 950 5060-02 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . .. . . .. . . . . . . . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . . . . . .. . . .. . . . . . . . . .. . . .. . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. C-2 C-3 C-6 C-6 C-7 C-9 C-9 C-10 C-11 C-12 iii Contents ECOFAST System Manual iv GWA 4NEB 950 5060-02 Purpose of the manual This manual is intended to serve as a reference document. The information it contains will help you operate the ECOFAST system with the PROFIBUS-DP and AS-Interface field buses. English Topics Deutsch Introduction and Notes on Using the Manual This manual consists of instruction chapters and reference chapters. It covers the following topics, among others: * System description * Power & control module (PCM) IP65 and cabinet installation * Power tee connector * Hybrid field bus connections * Data tee connector * Discriminating module * Installation guidelines * Wiring and interfaces * Questions and Answers * ECOFAST pilot projects * Order numbers * Glossary Note Important information requiring particular attention is enclosed between two horizontal lines. Specifications This manual only describes shared components of the ECOFAST system. Correction sheet A correction sheet is attached at the end of this manual. Please enter any suggestions for improvements, additions or corrections there and return the sheet to us. In doing so, you can help us improve the next edition. ECOFAST System Manual GWA 4NEB 950 5060-02 v ECOFAST System Manual vi GWA 4NEB 950 5060-02 ECOFAST System Description Section Topic 1 Page 1.1 Philosophy of the ECOFAST System 1-2 1.1.1 Requirements Specified for Innovative Automation and Drive Systems 1-2 1.1.2 Desina and Field Bus Certificates 1-4 1.1.3 ECOFAST certified and ECOFAST integrated 1-4 1.1.4 ECOFAST ES Software 1-5 1.1.5 The ECOFAST Basic System 1-5 1.1.6 Topology of the Network 1-6 1.1.7 Overview of Interfaces 1-8 ECOFAST System Manual GWA 4NEB 950 5060-02 1-1 ECOFAST System Description 1.1 Philosophy of the ECOFAST System ECOFAST - An integrated connection system for data and power on the field level The ECOFAST system (Energy and Communication Field Installation System) sets new standards whenever machines and plant need to be equipped with automation, control & distribution and drive technology. The central elements of the ECOFAST philosophy are extensive decentralization and modularization of the installation system and comprehensive diagnostics on the component level. ECOFAST links all the components of an automation system together using an integrated connection technique for data and power that complies with the high IP65 degree of protection. ECOFAST is thus an integral part of "Totally Integrated Automation" and open from the point of view of both manufacturers and users. SIMATIC S7 Motor starter SIMATIC ET 200X COMBIMASTER Motor/converter unit ELMO pump ELMO-G side-channel compressor Fig. 1-1: Typical components of an automation system ECOFAST System Manual 1-2 GWA 4NEB 950 5060-02 ECOFAST System Description 1.1.1 Requirements Specified for Innovative Automation and Drive Systems * * * * Short phases for offering, planning and configuring machines and plant Rapid installation and assembly Quick and easy commissioning High system availability Short phases for offering, planning and configuring machines and plant * * * * * * * * * * Modular planning process for machines and plant Offers prepared by combining prefabricated modules Use of CAD/CAE macros Use of standardized bus systems such as PROFIBUS-DP and AS-Interface Rapid installation and assembly Cabinetless installation systems with a high degree of protection Use of prefabricated and tested functional units Smaller system footprint Rapid installation on site Standardized connection method for power and data lines Quick and easy commissioning * Potential fault sources reduced to a minimum thanks to standardized connectors * Comprehensive diagnostics on the device and over the bus * Improved EMC because the contact unit and the drive are linked together directly High system availability * * * * * Shorter downtimes because devices can be replaced quickly and easily No need to interrupt the power and field buses in order to replace a device Automatic parameterization if a device is replaced Comprehensive status and diagnostic information Transfer of operating parameters, such as current values or status signals ECOFAST System Manual GWA 4NEB 950 5060-02 1-3 ECOFAST System Description 1.1.2 Desina and Field Bus Certificates Fig. 1-2: Desina and Field Bus Certificates Advantages * * * * * 1.1.3 Common connection method for all modules PROFIBUS-DP connected using Han Brid connectors AS-Interface connected using the insulation displacement method Power connected with HAN Q8/0 connectors Recommended by Profibus International (PNO) and Verein Deutscher Werkzeugfabriken VDW (DESINA) ECOFAST certified and ECOFAST integrated Fig. 1-3: Zertifikate ECOFAST certified and ECOFAST integrated ECOFAST certified The new "ECOFAST certified" certificate, which is assigned by an accredited test laboratory, guarantees reliable planning. It confirms that devices from different manufacturers are compatible with ECOFAST specifications. ECOFAST integrated Another user-friendly and time-saving feature. Plans and quantity lists/bills of material are created along with the entire system documentation for ECOFAST ES. Using an export function, they can then be easily integrated for further CAD processing. In addition to Siemens components, devices from other manufacturers can be integrated in this configuration tool. Their integration and conformity is confirmed by the "ECOFAST integrated" function. ECOFAST System Manual 1-4 GWA 4NEB 950 5060-02 ECOFAST System Description 1.1.4 ECOFAST ES Software The ECOFAST ES configuration tool supports power-engineering system design with the following range of functions: * Graphical configuration of the consumers, cables, and switching/protection functions * Power bus dimensioning by automatically determining cable cross-sections and automatic dimensioning of the switching/protection elements * Power-engineering design and testing according to the relevant standards and today's generally accepted practices * Creation of documentation: circuit diagram of the power bus, bills of material and quantity lists 1.1.5 The ECOFAST Basic System Operator control Motor starter and monitoring motor IP20 component e.g. OP 27 plugged in e.g. SIMOCODE-DP Power & Control module (PCM) Motor starter motor nearby ET 200X COMBIMASTER MM 411 Engineering software ECOFAST ES Fig. 1-4: The ECOFAST basic system ECOFAST System Manual GWA 4NEB 950 5060-02 1-5 ECOFAST System Description 1.1.6 Topology of the Network Block diagram The block diagram below shows a possible topology of the ECOFAST network: 2 x 24 V DC 1 x AS-i 3a Station 1 Power & Control Module with - PROFIBUS-DP Master - AS-i Master - Power Supply 1 x AS-i, 2 x 24 V DC - 400 V AC Main Power Supply 3 x AC 400 V Bus Terminating Connector Hybrid Field Bus Cable 2 x 24 V DC and Data Data tee plug connector As-i AUX PWR ECOFAST Consumer ECOFAST Consumer ECOFAST Consumer ECOFAST Consumer Station 2 Station 3 Station 4 Station 32 Power Tee Plug Connector Yellow AS-i Line 1 x AS-i and Data Black AS-i Line 1 x 24 V DC (AUX PWR) Insulation Displacement Method ECOFAST Consumer ECOFAST Consumer ECOFAST Consumer Station 1 Station 2 Station 3 Power Cable 3/PE-50/60 Hz; 400 V AC Fig. 1-5: Block diagram of the network topology ECOFAST System Manual 1-6 GWA 4NEB 950 5060-02 ECOFAST System Description Power & control module (PCM) * Supplies power up to 690 V * Generates 24 V for interfaces to the field bus and the sensors * Generates 24 V for actuators (can be switched by EMERGENCY STOP modules in the power & control module) * Integrates EMERGENCY STOP functionality Power bus The consumers are supplied by the power bus via power tee connectors. Field bus The DP master supplies the DP protocol into the hybrid line (optical fiber or Cu). ECOFAST motor starters allow the stations on the PROFIBUS-DP to be connected uninterruptibly to the data tee connector. The AS-i master supplies the AS-i protocol into the AS-i line. The stations on the AS-Interface are connected using the insulation displacement method. ECOFAST System Manual GWA 4NEB 950 5060-02 1-7 ECOFAST System Description 1.1.7 Overview of Interfaces Diagram The diagram below shows an overview of the system interfaces, taking the example of a motor starter: Motor connector Digital inputs Data terminal Motor terminal Local device interface Local device interface* Power terminal 3RK1 303-2AS51-.... motor starters only Data tee connector Data connector Hybrid field bus cable Power tee connector Power connector * Fig. 1-6: Overview of interfaces Field Bus Interfaces ECOFAST components feature the following field bus interfaces, depending on the device version: PROFIBUS-DP PROFIBUS-DP interface with data terminal, data tee connector, data connector optionally for copper cable (Cu) or optical-fiber cable AS-Interface AS-i R AUX PW AS-i interface with insulation displacement method for yellow AS-i line (data and 24 V nonswitched) and black AS-i line (AUX PWR: 24 V DC switched) Fig. 1-7: Field bus interfaces ECOFAST System Manual 1-8 GWA 4NEB 950 5060-02 Power & Control Module (PCM) Section Topic 2 Page 2.1 Description 2-2 2.2 Connections of the IP65 Version 2-4 2.3 Installation and Wiring of the IP65 Version 2-6 2.3.1 Installation 2-6 2.3.2 Wiring 2-7 2.3.3 Commissioning 2-9 2.4 Diagnostics 2-10 2.5 Dimension Drawings 2-12 2.6 Technical Specifications 2-13 ECOFAST System Manual GWA 4NEB 950 5060-02 2-1 Power & Control Module (PCM) 2.1 Description Tasks of the power & control module (PCM) The PCM performs the following tasks in the ECOFAST system: * Supplying the connected ECOFAST components via two Han Q8/0 sockets with - 400 V AC power * Short-circuit protection with the S2 circuit breaker * Supplying the connected ECOFAST components via two Han Brid sockets with - 24 V DC (switched) (DC24V-S): This voltage is not always present. It is used to control the switching elements (e.g. contactor). - 24 V DC (non-switched) (DC24V-NS): This voltage is always present. It is used to supply power to the electronic ECOFAST components and sensors and interrogate auxiliary contacts. - PROFIBUS-DP * Supplying the AS-Interface profile lines with 24 V DC (switched) (black, AUX PWR) and 24 V DC (non-switched) (yellow, AS-i) via AS-Interface. * Protection and monitoring * PLC function - Central SIMATIC S7 module: CPU 313-2 DP, 16 DI + 16 DO x 24 V DC with 64K memory card or - SIMATIC S7 slave module: ET 200M with digital input output module: SM 323 16 DI + 16 DO x 24 V DC A program for controlling the PCM is installed in the CPU at the factory. You can also store the user program for controlling your system here. For more information, refer to "System Software for S7 300/400, System and Standard Functions Reference Manual". * EMERGENCY STOP function with contactor safety combination - Main switch function, rotary actuator - SIGUARD safety combination 3TK2 8... or - Safety at work 3RK1 1... - Stop category: 0 to EN 60204-1 (uncontrolled shutdown by means of immediate switch-off of power to the machine actuator components) - Category: 4 according to EN 954-1 ECOFAST System Manual 2-2 GWA 4NEB 950 5060-02 Power & Control Module (PCM) Set-up Depending on the device version, the PCM comprises the following components: - PLC (DP master, DP slave, AS-i master) - 24 V DC (switched) (DC24V-S) and 24 V DC (non-switched) (DC24V-NS) - 24 V DC switched (AUX PWR) and non-switched (AS-i) for AS-Interface - 3TK28 (SIGUARD) safety combination or AS-i monitor Fig. 2-1: Power & control module (PCM) IP65 24 V DC power supplies The 24 V DC power supplies (switched (24 V DC-S)) and non-switched (24 V DC-NS)) are available in two different variants. Features you can consider during configuration: * Variant 1: SIDAC power supply - Contains a safety isolating transformer - Very high EMC resistance - Very robust * Variant 2: SITOP power supply - Very high control accuracy for output voltage - Settable voltage level - Lightweight ECOFAST System Manual GWA 4NEB 950 5060-02 2-3 Power & Control Module (PCM) Device versions Power & control modules are currently available in the following versions: Device version Order No. Power and Control Module (PCM), version IP65 Housing dimensions (W x H x D) in mm: 550 x 850 x 255 Overall dimensions without external connector (W x H x D) in mm: 600 x 920 x 310 Main power supply Safety system Generation of auxiliary voltage PROFIBUS master SIGUARD with S7-300 CPU 313C-2 DP safety contactor combination PROFIBUS master with S7-300 CPU 313C-2 DP plus AS-Interface bus master AS-Interface Safety at Work with 2.4 A AS-Interface power supply SIDAC DC 24 V, 10 A (NS), 10 A (S) PROFIBUS Slave with ET 200M SIGUARD safety contactor combination 4FB2 111-2A 1-0AA0 4FB2 121-2A 1-0AA0 4FB2 112-2A 1-0AA0 SITOP DC 24 V, 10 A (NS), 10 A (S) 4FB2 112-2A 2-0AA0 SIDAC DC 24 V, 10 A (NS), 10 A (S) 4FB2 111-2A 1-0AA1 SITOP DC 24 V, 10 A (NS), 10 A (S) 4FB2 111-2A 2-0AA1 Main power supply Breaking capacity External back-up fuse*) 16 A 50 KA 100 A A0 20 A 50 KA 125 A B0 25 A 50 KA 125 A C0 32 A 50 KA 125 A D0 40 A 50 KA 160 A E0 Unregulated Regulated 1 2 Table 2-1: PCMl device versions *) External back-up fuse If the short-circuit current at the installation location exceeds Icu =100 kA, a back-up fuse (gL/gG) with the maximum value specified in the table is required. Max. input voltage: 415 V AC ECOFAST System Manual 2-4 GWA 4NEB 950 5060-02 Power & Control Module (PCM) 2.2 Connections of the IP 65 Version Connections and throughfeeds on the underside Cable feed-throughs (access possible here, e.g. for sensors) 2 x Han Q8/0 socket for supplying the power bus (400 V AC) PROFIBUS-DP/ MPI plug Main power supplied 400 V AC X10 X2 2 x Han Brid socket for PROFIBUS-DP and 2 x 24 V DC per channel Main power looped through 400 V AC X3 4 x M screwed gland Access possible here for round cables and AS-Interface profile lines Fig. 2-2: Connections and throughfeeds on the underside of the PCM Connections on the inside X01 X08 X08 terminal block for start, EMERGENCY STOP, AS-Interface X01 terminal block for main power (N/L1/L2/L3/PE) Fig. 2-3: Connections on the inside of the PCM ECOFAST System Manual GWA 4NEB 950 5060-02 2-5 Power & Control Module (PCM) Power supply X01 Supplying and looping through the main power. Terminal block N/L1/L2/L3/PE Caution All 5 conductors (N/L1/L2/L3/PE) must be wired. Main circuit output X2/X3 Output: 2 x Han Q8 socket Pin assignment acc. to DESINA: Pin Assignment Comment 1 Neutral conductor N -- 2 Phase L2 -- 3 Brake Optional 4 -- -- 5 -- -- 6 Phase L3 -- 7 Brake Optional 8 Phase L1 -- 9 PE, ground -- Table 2-2: Pin assignment of the Han Q8 pin/socket AS-Interface field bus: X08 AS-Interface(s) for AS-Interface profile line(s) * yellow * black Assignment page 2-9 PROFIBUS-DP field bus: X10 2 x hybrid field bus socket connection Pin assignment acc. to DESINA: Pin Assignment Comment 1 + 24 V Non-switched 2 0 V DC Corresponds to 1 3 0 V DC Corresponds to 4 4 + 24 V Switched Field bus -- A/B Table 2-3: Pin assignment of the hybrid field bus connection ECOFAST System Manual 2-6 GWA 4NEB 950 5060-02 Power & Control Module (PCM) 2.3 Installation and Wiring of the IP 65 Version Note Warning Hazardous electrical voltages! These may cause electric shock and burns. Disconnect the system and device from the power supply before starting work. Caution Refer to the information in the operating instructions. 2.3.1 Installation To install the PCM, carry out the following steps: 1 Description The PCM is designed for wall mounting. Choose a flat surface. Allow the specified minimum clearance to guarantee adequate convection. 100* 100 400 Step * PCM with PROFIBUS-DP interface on the left-hand side: If you want to connect a PROFIBUS-DP cable with a straight plug, you must allow a clearance of approx. 150 mm around this plug. PCM 400 150* 2 Drill 4 holes for the screws. 576 4x 695 8 3 Screw the screws into the wall. The screws should protrude approx. 5 mm to enable the PCM to be mounted. 4 Hook the PCM onto the screws. Make sure it is fastened so that it is absolutely secure (it is very heavy!). 5 Tighten the screws. Table 2-4: Installing the PCM, IP 65 Version ECOFAST System Manual GWA 4NEB 950 5060-02 2-7 Power & Control Module (PCM) 2.3.2 Wiring To wire the PCM, carry out the following steps: Step Description 1 Open the door of the PCM. To do so, unlock the two safety locks and turn the main switch counter clockwise. 2 Strip the lines. For more information on stripped lengths, cross-sections, and terminal assignments, refer to the table on the next page. 3 Insert the lines for Start, EMERGENCY STOP and if necessary AS-Interface through the M screwed glands on the underside and into the PCM up to the X08 terminal block. 4 Connect the lines to the X08 terminal block with Cage Clamps. 5 Insert the lines for the main power through the M screwed glands on the underside and into the PCM up to the X01 terminal block, 6 Connect the lines to terminal block X01 with cage clamps. 7 Connect the hybrid field bus cables (maximum of 2) to X10 if you are using a PCM with PROFIBUS-DP. 8 Connect a maximum of 2 power cables to X2 and X3. 9 Attach suitable screw caps to the underside of any unused throughfeeds to attain degree of protection IP65. Close the screw cap of the MPI plug on the left-hand side. 10 This completes wiring. Close the F1 circuit-breaker. Table 2-5: Wiring of the PCM Safety lock F1 circuit breaker Main switch X01 terminal block MPI-connector Safety lock X08 terminal block (concealed) X10 Han-Brid sockets (concealed) ECOFAST System Manual 2-8 GWA 4NEB 950 5060-02 x x x x x 4FB2 121-2AE01-0AA0 4FB2 111-2AE01-0AA1 4FB2 112-2AC01-0AA0 4FB2 112-2AC02-0AA0 AWG 28...12 0.08 ... 4 mm Start 1-2 4FB2 111-2AE01-0AA0 9 9 9 X08/ Start -- -- x x x AWG 28...12 0.08 ... 4 mm 3-4 EMERGENCY STOP x x -- x -- AS-i 5 (+) 6 (-) AS-Interface x x -- x -- AUX PWR 7 (+) 8 (-) AUX PWR AWG 24..0.6 17 x x x x x 0.2 ... 16 mm2 L1 L2 L3 N PE 17 17 X01/ Main power Power & Control Module (PCM) Stripped lengths, cross sections, terminal assignment Table 2-6: Stripped lengths, cross sections, terminal assignment ECOFAST System Manual GWA 4NEB 950 5060-02 2-9 Power & Control Module (PCM) 2.3.3 Commissioning Sequence of steps After installing and wiring the PCM, you must commission it. To commission the PCM, and thus also the connected field bus(es) and power bus (sub-)segments, carry out the following steps: Step Description 1 Turn the rotary switch on the front of the CPU to "RUN". 2 If you are using motor starters without a thermal motor model and with a motor supply lead (installation near motor), also observe the line protection guidelines in 8.5.6 on page 8-16. 3 Close the door of the PCM and lock the two safety locks. Turn the main switch clockwise. 4 Switch on the 400 V AC main power supply. 5 Switch on the PCM. 6 Reset the external EMERGENCY STOP if necessary and actuate the external start switch. The power bus(es) and the field bus(es) are now supplied with power. 7 Configure the AS-i monitor if necessary. The password assigned in the factory is "ECOFAST". Note the information below. Table 2-7: Sequence of steps for commissioning the PCM Caution The AS-i monitor "measures" the connected cables and saves the configuration. During commissioning, the factory-side configuration is still stored. For this reason, the system displays a prompt after you have entered your password because the system has to be reconfigured. Diagram Safety lock Rotary switch on CPU (concealed) Main switch External start switch Safety lock Start Main power Fig. 2-4: Commissioning diagram ECOFAST System Manual 2-10 GWA 4NEB 950 5060-02 Power & Control Module (PCM) 2.4 Diagnostics Missing voltages Voltage missing 400 V AC 24 V internal 24 V switched 24 V non-switched 24 V AS-i switched 30 V AS-i nonswitched Shown by Potential fault Cause D1/D2 E0.0 OFF Q1 OFF --- D1/D2 E0,1 OFF Q1 OFF Overload D1/D2 E0.2 OFF Q1 OFF Short circuit D1/D2 E0.3 OFF K1 and/or K2 OFF Emergency stop, 24 V internal, D5 or K5 All OFF Q1 OFF --- All OFF F1 OFF --- F2/channel 4 red F2 Overload F2/channel 4 red F2, blade-type fuse defective Short circuit D1/D2 E0.4, D1/D2 E0.7 OFF K3 and/or K4 OFF D5 or K5, emergency stop D1/D2 E0.7 OFF F2/channel 1 red Overload D1/D2 E0.7 OFF F2/channel 1 red, blade-type fuse defective Short circuit D1/D2 E0.6 OFF F2/channel 3 red Overload D1/D2 E0.6 OFF F2/channel 3 red, blade-type fuse defective Short circuit D1/D2 E1.1, D1/D2 E0.4 K3 and/or K4 OFF D5 or K5, emergency stop E1.1 F2/channel 2 Overload E1.1 F2/channel 2, bladetype fuse defective Short circuit D5 or D3 G2 Overload Table 2-8: Diagnostics - missing voltages ECOFAST System Manual GWA 4NEB 950 5060-02 2-11 Power & Control Module (PCM) Signal states Signal What's wrong? Potential fault Cause D1/D2 E 0.0 OFF All OFF Q1 OFF --- D1/D2 E 0.1 OFF All OFF Q1 overloaded --- D1/D2 E 0.2 OFF All OFF Q1 short circuit --- D1/D2 E 0.3 OFF 400 V AC K1, K2 OFF D5 (K5), emergency stop, 24 V internal D1/D2 E 0.4 OFF 24 V switched, 24 V AS-i K3, K4 OFF D5 (K5), emergency stop, 24 V internal, F2/ channel 1 D1/D2 E 0.5 OFF 400 V, 24 V switched, 24 V AS-i K1, K2, K3, K4 Emergency stop D1/D2 E 0.6 OFF 24 V non-switched F2/channel 3 F2/channel 3 overloaded D1/D2 E 0.7 OFF 24 V switched F2/channel 1 F2/channel 2 overloaded D1/D2 E 1.0 OFF All OFF F1 OFF Overload, short circuit D1/D2 E 1.1 OFF 24 V AS-i F2/channel 2 Overload, short circuit F2/channel 1 red ON 24 V switched F2/channel 1 Overload, short circuit F2/channel 2 red ON 24 V AS-i F2/channel 2 Overload, short circuit F2/channel 3 red ON 24 V non-switched F2/channel 3 Overload, short circuit F2/channel 4 red ON All OFF F2/channel 4 Overload, short circuit Table 2-9: Diagnostics - signal states ECOFAST System Manual 2-12 GWA 4NEB 950 5060-02 Power & Control Module (PCM) 310 max. Dimension Drawings 255 max. 2.5 4x 600 2 O9 O 15 920 max. 50 0.2 695 1 850 2 576 Clearance (hatched): 100* Drilling dimensions: 100 695 400 576 150* PCM 8 400 4x * Allow clearance for plug if necessa Fig. 2-5: Dimension drawings of the power & control module ECOFAST System Manual GWA 4NEB 950 5060-02 2-13 Power & Control Module (PCM) 2.6 Technical Specifications Order number 4FB2111-2AE010AA0 4FB2121-2AE010AA0 4FB2111-2AE010AA1 4FB2112-2AC0. 0AA0 Version Master/slave PROFIBUS-DP (master) PROFIBUS-DP (master) AS-Interface (master) PROFIBUS-DP (slave) PROFIBUS-DP (master) AS-Interface (master) Protection SIGUARD SIGUARD SIGUARD AS-i monitor Power supply Input voltage/range 3 AC 400 V/10% +6% System frequency I range 50, 60 Hz 5% Main power supply See table Seite 2-4 Output Main circuit 3 AC 400 V 24 V switched (24 V S) Output voltage 24 V DC (20.4 V to 28.8 V) Output current DC 5 A when AS-Interface fitted DC 10 A when AS-Interface not fitted Residual ripple < 5% Backup min. 20 ms 24 V DC non-switched (24 V S) Output voltage 24 V DC (20.4 V to 28.8 V) Output current 10 A DC 10 A DC 10 A DC 10 A DC Residual ripple < 5% < 5% < 5% <5% Backup min. 20 ms min. 20 ms min. 20 ms min. 20 ms 30 V DC non-switched (AS-i) Output voltage AS-i -- 30 V DC (29.5 V to 31.6 V) -- 30 V DC (29.5 V to 31.6 V) Output current -- 2.4 A DC -- 2.4 A DC Residual ripple -- < 300 mVpp -- < 300 mVpp Backup -- min. 20 ms -- min. 20 ms Protection and monitoring Short circuit protection Main circuit Built-in circuit breaker Auxiliary circuits Built-in residual current-operated protective device Signaling devices Green (ready for operation) Yellow (power connected) Red (internal fault) Safety Degree of protection IP65 Certificates and approvals (in preparation) CE, UL, CSA Safety class I ECOFAST System Manual 2-14 GWA 4NEB 950 5060-02 Power & Control Module (PCM) Order number 4FB2111-2AE010AA0 4FB2121-2AE010AA0 4FB2111-2AE010AA1 4FB2112-2AC0. 0AA0 EMC Emitted interference EN 55 081-2 Noise immunity EN 61000-6-2 Temperatures Ambient temperature 0 C to +40 C, +50 C with derating in the main circuit/auxiliary circuits Transport/ storage temperature -25 C to +70 C Relative humidity 15% to 75% at 25C (no condensation) Air pressure 700 to 1060 hPa Mechanical environmental conditions Transport Vibratory load 3g Shock 15 g with 11 ms Operation Vibratory load f = 10 to 58 Hz, d = 0,075 mm/58 to 100 Hz, 10g Shock 10 g with 6 ms/6 g with 10 ms Connections/feed-throughs Input connections Cage Clamp max. 2 x 16 mm2 max. current carrying capacity Throughfeeds 2 x M40 x 1.5 Output connections Main circuit 2 x HAN Q8 socket (DESINA) Output connections Auxiliary circuits/field bus 2 x HAN Brid socket/socket (DESINA) Output connections AS-Interface Output connections EMERGENCY STOP -- Cage Clamp, 2.5 mm2 Throughfeed via cable throughfeed flange Cage Clamp, 2.5 mm 2 Throughfeed 4 x AS-i seal Cage Clamp, 2.5 mm 2 Throughfeed 4 x AS-i seal Cage Clamp, 2.5 mm 2 Throughfeed via cable throughfeed flange Cage Clamp, 2.5 mm 2 Throughfeed via cable throughfeed flange SIMATIC connections Cage Clamp, 1.5 mm 2 Cable throughfeed flanges 8 x 3.8 to 6.3 mm -- Cage Clamp, 2.5 mm2 Throughfeed via cable throughfeed flange 2 x 6.1 to 8.8 mm 2 x 7.8 to 10.7 mm Dimensions/weight Housing dimensions (WxHxD) 550 x 850 x 255 Overall dimensions (WxHxD) 600 x 920 x 310 Fixing dimensions (WxH) 575 x 695 Fixing holes 4 x M8 Weight max. 77 kg Fasteners Double-bit key ECOFAST System Manual GWA 4NEB 950 5060-02 2-15 Power & Control Module (PCM) Order number 4FB2111-2AE010AA0 4FB2121-2AE010AA0 4FB2111-2AE010AA1 4FB2112-2AC0. 0AA0 SIMATIC Controller S7-300, CPU 313C-2 DP I/O module S7-300, CPU 313C-2 DP I/O module AS-Interface master Main memory (EEPROM) MMC IM151, 64 KByte IM151, 64 KByte IM151, 64 KByte -- MMC Included Included Included -- Unassigned SIMATIC inputs 6 6 6 6 Unassigned SIMATIC outputs 13 13 13 13 External interfaces PROFIBUS-DP PROFIBUS-DP PROFIBUS-DP PROFIBUS-DP Data transfer rate S7-300, CPU 313C-2 DP I/O module AS-Interface master ET 200B I/O module max. 12 Mbit/s ECOFAST System Manual 2-16 GWA 4NEB 950 5060-02 Power & Control Module (PCM), Cabinet Installation Section Topic 3 Page 3.1 Description 3-2 3.2 Connections of the Cabinet Installation Version 3-4 3.3 Installation and Wiring of the Cabinet Installation Version 3-6 3.3.1 Installation 3-6 3.3.2 Wiring 3-7 3.3.3 Commissioning 3-9 3.4 Diagnostics 3-10 3.5 Dimension Drawings 3-12 3.6 Technical Specifications 3-13 ECOFAST System Manual GWA 4NEB 950 5060-02 3-1 Power & Control Module (PCM), Cabinet Installation 3.1 Description Tasks of the power & control module (PCM) The PCM performs the following tasks in the ECOFAST system: * Supplying the connected ECOFAST components via two Han Q8/0 sockets with - 400 V AC power * Short-circuit protection with the S2 circuit breaker * Supplying the connected ECOFAST components via two Han Brid sockets with - 24 V DC (switched) (DC24V-S): This voltage is not always present. It is used to control the switching elements (e.g. contactor). - 24 V DC (non-switched) (DC24V-NS): This voltage is always present. It is used to supply power to the electronic ECOFAST components and sensors and interrogate auxiliary contacts. - PROFIBUS-DP * Supplying the AS-Interface profile lines with 24 V DC (switched) (black, AUX PWR) and 24 V DC (non-switched) (yellow, AS-i) via AS-Interface. * Protection and monitoring * PLC function - Central SIMATIC S7 module: CPU 313-2 DP, 16 DI + 16 DO x 24 V DC with 64K memory card or - SIMATIC S7 slave module: ET 200M with digital input output module: SM 323 16 DI + 16 DO x 24 V DC A program for controlling the PCM is installed in the CPU at the factory. You can also store the user program for controlling your system here. For more information, refer to "System Software for S7 300/400, System and Standard Functions Reference Manual". * EMERGENCY STOP function with contactor safety combination - Main switch function, rotary actuator - SIGUARD safety combination 3TK2 8... or - Safety at work 3RK1 1... - Stop category: 0 to EN 60204-1 (uncontrolled shutdown by means of immediate switch-off of power to the machine actuator components) - Category: 4 according to EN 954-1 ECOFAST System Manual 3-2 GWA 4NEB 950 5060-02 Power & Control Module (PCM), Set-up Depending on the device version, the PCM comprises the following components: - PLC (DP master, DP slave, AS-i master) - 24 V DC (switched) (DC24V-S) and 24 V DC (non-switched) (DC24V-NS) - 24 V DC switched (AUX PWR) and non-switched (AS-i) for AS-Interface - 3TK28 (SIGUARD) safety combination or AS-i monitor Power & control module for cabinet installation with 24 V DC SITOP power supply Fig. 3-1: Power & control module (PCM) IP65 24 V DC power supplies The 24 V DC power supplies (switched (24 V DC-S) and non-switched (24 V DC-NS)) are available in two different variants. Features you can consider during configuration: * Variant 1: SIDAC power supply - Contains a safety isolating transformer - Very high EMC resistance - Very robust * Variant 2: SITOP power supply - Very high control accuracy for output voltage - Settable voltage level - Lightweight ECOFAST System Manual GWA 4NEB 950 5060-02 3-3 Power & Control Module (PCM), Cabinet Installation Device versions Power & control modules for cabinet installation are currently available in the following versions: Device version Order No. Power and Control Module (PCM), cabinet installation version Housing dimensions (W x H x D) in mm: 550 x 850 x 255 Overall dimensions without external connector (W x H x D) in mm: 600 x 920 x 310 Main power supply Safety system Generation of auxiliary voltage PROFIBUS master SIGUARD with S7-300 CPU 313C-2 DP safety contactor combination PROFIBUS master with S7-300 CPU 313C-2 DP plus AS-Interface bus master AS-Interface Safety at Work with 2.4 A AS-Interface power supply SIDAC DC 24 V, 10 A (NS), 10 A (S) PROFIBUS Slave with ET 200M SIGUARD safety contactor combination 4FB2 111-2A 1-0AA0 4FB2 121-2A 1-0AA0 4FB2 112-2A 1-0AA0 SITOP DC 24 V, 10 A (NS), 10 A (S) 4FB2 112-2A 2-0AA0 SIDAC DC 24 V, 10 A (NS), 10 A (S) 4FB2 111-2A 1-0AA1 SITOP DC 24 V, 10 A (NS), 10 A (S) 4FB2 111-2A 2-0AA1 Main power supply Breaking capacity External back-up fuse*) 16 A 50 KA 100 A A0 20 A 50 KA 125 A B0 25 A 50 KA 125 A C0 32 A 50 KA 125 A D0 40 A 50 KA 160 A E0 Unregulated Regulated 1 2 Table 3-1: PCMl device versions *) External back-up fuse If the short-circuit current at the installation location exceeds Icu =100 kA, a back-up fuse (gL/gG) with the maximum value specified in the table is required. Max. input voltage: 415 V AC ECOFAST System Manual 3-4 GWA 4NEB 950 5060-02 Power & Control Module (PCM), 3.2 Connections of the Cabinet Installation Version Connections and feed-throughs on the underside X01 PROFIBUS-DP 2 x 9-pin SUB-D socket X10 Terminal block X10 2 x 24 V DC (switched and non-switched) X2/X3 Terminal block X2/X3 Output Main circuit 400 V AC X08 X08 terminal block for start, EMERGENCY STOP, AS-Interface X01 terminal block Power supply (N/L1/L2/L3/PE) Fig. 3-2: Connections and throughfeeds on the underside of the PCM Power supply X01 Supplying and looping through the main power. Terminal block N/L1/L2/L3/PE Caution All 5 conductors (N/L1/L2/L3/PE) must be wired. Main circuit output X2/X3 To supply the power bus 2 x terminal block N/L1/L2/L3/PE Start, EMERGENCY STOP, field bus AS-Interface X08 AS-i interface(s) for AS-Interface profile line(s) * Yellow * Black Assignment page 3-8 24 V DC geschaltet und nicht geschaltet X10 PROFIBUS-DP field bus: 2 x 9-pin SUB-D socket directly on PLC ECOFAST System Manual GWA 4NEB 950 5060-02 3-5 Power & Control Module (PCM), Cabinet Installation 3.3 Installation and Wiring of the Cabinet Installation Version Note Warning Hazardous electrical voltages! These may cause electric shock and burns. Disconnect the system and device from the power supply before starting work. Caution Refer to the information in the operating instructions. 3.3.1 Installation To install the PCM, carry out the following steps: Step 1 2 Description The PCM is designed to be installed in control cabinets. The degree of protection of the control cabinet must be at least IP32. Drill 4 holes for the screws. 350 8 809 4x 3 Screw the screws into the cabinet. The screws should protrude approx. 5 mm to enable the PCM to be mounted. 4 Hook the PCM onto the screws. Make sure it is fastened so that it is absolutely secure (it is very heavy!). 5 Tighten the screws. Table 3-2: Installing the PCM, Cabinet Installation Version ECOFAST System Manual 3-6 GWA 4NEB 950 5060-02 Power & Control Module (PCM), 3.3.2 Wiring To wire the PCM, carry out the following steps: Step Description 1 Strip the lines. For more information about the stripped lengths, crosssections, and terminal assignments, refer to the table on the next page. 2 Insert the lines for start, EMERGENCY STOP and, if necessary, the AS-Interface into the control cabinet and use cage clamps to connect them to terminal block X08. 3 Insert the lines for 24 V DC (switched) and 24 V DC (non-switched) into the control cabinet and use cage clamps to connect them to terminal block X10. 4 Insert the lines for the power supply into the control cabinet and use cage clamps to connect them to terminal block X01. 5 Insert the lines for the main circuit outputs into the control cabinet and use cage clamps to connect them to terminal block X2/X3. 6 Connect the PROFIBUS-DP to the 9-pin SUB-D socket on the front of the CPU. 7 This completes wiring. Close the F1 circuit-breaker. 8 Close the cabinet door. Table 3-3: Wiring of the PCM ECOFAST System Manual GWA 4NEB 950 5060-02 3-7 3-8 9 9 24 V DC +S/-S 3-4 -- AWG 28...12 AWG 28...12 0,08 ... 4 mm 0,08 ... 4 mm 24 V DC +NS/-NS 1-2 x 4FB2 112-2A...-0AA1 9 x 4FB2 111-2A...-0AA3 x x x AWG 28...12 4FB2 121-2A...-0AA1 AWG 28...12 x X10/ 3-4 0,08 ... 4 mm 0,08 ... 4 mm Start 1-2 x 9 9 9 X08/ 4FB2 111-2A...-0AA2 IP00 3 2 1 AWG 24...6 17 x x x x 0,2 ... 16 mm2 L1 L2 L3 N PE 17 17 X01/ Cage Clamp AWG 24...8 12 X01 0,2 ... 10mm2 L1 L2 L3 N PE x -- x -- AUX PWR 7 (+) 8 (-) 12 12 X2/X3 x -- x -- AS-i 5 (+) 6 (-) X08 Power & Control Module (PCM), Cabinet Installation Stripped lengths, cross sections, terminal assignment Table 3-4: Stripped lengths, cross sections, terminal assignment ECOFAST System Manual GWA 4NEB 950 5060-02 Power & Control Module (PCM), 3.3.3 Commissioning Sequence of steps After installing and wiring the PCM, you must commission it. To commission the PCM, and thus also the connected field bus(es) and power bus (sub-)segments, carry out the following steps: Step Description 1 If you are using motor starters without a thermal motor model and with a motor supply lead (installation near motor), also observe the line protection guidelines in 8.5.6 on page 8-16. 2 Switch on the 400 V AC main power supply. 3 If necessary, reset the external EMERGENCY STOP function and press the external start switch. The power bus(es) and the field bus(es) are now supplied with power. 4 Configure the AS-i monitor if necessary. The password assigned in the factory is "ECOFAST". Note the information below. Table 3-5: Sequence of steps for commissioning the PCM Caution The AS-i monitor "measures" the connected cables and saves the configuration. During commissioning, the factory-side configuration is still stored. For this reason, the system displays a prompt after you have entered your password because the system has to be reconfigured. ECOFAST System Manual GWA 4NEB 950 5060-02 3-9 Power & Control Module (PCM), Cabinet Installation 3.4 Diagnostics Missing voltages Voltage missing 400 V AC 24 V internal 24 V switched 24 V non-switched 24 V AS-i switched 30 V AS-i nonswitched Shown by Potential fault Cause D1/D2 E0.0 OFF Q1 OFF --- D1/D2 E0,1 OFF Q1 OFF Overload D1/D2 E0.2 OFF Q1 OFF Short circuit D1/D2 E0.3 OFF K1 and/or K2 OFF Emergency stop, 24 V internal, D5 or K5 All OFF Q1 OFF --- All OFF F1 OFF --- F2/channel 4 red F2 Overload F2/channel 4 red F2, blade-type fuse defective Short circuit D1/D2 E0.4, D1/D2 E0.7 OFF K3 and/or K4 OFF D5 or K5, emergency stop D1/D2 E0.7 OFF F2/channel 1 red Overload D1/D2 E0.7 OFF F2/channel 1 red, blade-type fuse defective Short circuit D1/D2 E0.6 OFF F2/channel 3 red Overload D1/D2 E0.6 OFF F2/channel 3 red, blade-type fuse defective Short circuit D1/D2 E1.1, D1/D2 E0.4 K3 and/or K4 OFF D5 or K5, emergency stop E1.1 F2/channel 2 Overload E1.1 F2/channel 2, bladetype fuse defective Short circuit D5 or D3 G2 Overload Table 3-6: Diagnostics - missing voltages ECOFAST System Manual 3-10 GWA 4NEB 950 5060-02 Power & Control Module (PCM), Signal states Signal What's wrong? Potential fault Cause D1/D2 E 0.0 OFF All OFF Q1 OFF --- D1/D2 E 0.1 OFF All OFF Q1 overloaded --- D1/D2 E 0.2 OFF All OFF Q1 short circuit --- D1/D2 E 0.3 OFF 400 V AC K1, K2 OFF D5 (K5), emergency stop, 24 V internal D1/D2 E 0.4 OFF 24 V switched, 24 V AS-i K3, K4 OFF D5 (K5), emergency stop, 24 V internal, F2/ channel 1 D1/D2 E 0.5 OFF 400 V, 24 V switched, 24 V AS-i K1, K2, K3, K4 Emergency stop D1/D2 E 0.6 OFF 24 V non-switched F2/channel 3 F2/channel 3 overloaded D1/D2 E 0.7 OFF 24 V switched F2/channel 1 F2/channel 2 overloaded D1/D2 E 1.0 OFF All OFF F1 OFF Overload, short circuit D1/D2 E 1.1 OFF 24 V AS-i F2/channel 2 Overload, short circuit F2/channel 1 red ON 24 V switched F2/channel 1 Overload, short circuit F2/channel 2 red ON 24 V AS-i F2/channel 2 Overload, short circuit F2/channel 3 red ON 24 V non-switched F2/channel 3 Overload, short circuit F2/channel 4 red ON All OFF F2/channel 4 Overload, short circuit Table 3-7: Diagnostics - signal states ECOFAST System Manual GWA 4NEB 950 5060-02 3-11 Power & Control Module (PCM), Cabinet Installation Dimension Drawings 224 3.5 2x O9 520 809 830 350 2x O9 350 8 809 4x Fig. 3-3: Dimension drawings of the power & control module ECOFAST System Manual 3-12 GWA 4NEB 950 5060-02 Power & Control Module (PCM), 3.6 Technical Specifications Order number 4FB2111-2AE010AA0 4FB2121-2AE010AA0 4FB2111-2AE010AA1 4FB2112-2AC0. 0AA0 Version Master/slave PROFIBUS-DP (master) PROFIBUS-DP (master) AS-Interface (master) PROFIBUS-DP (slave) PROFIBUS-DP (master) AS-Interface (master) Protection SIGUARD SIGUARD SIGUARD AS-i monitor Power supply Input voltage/range 3 AC 400 V/-10% +6% System frequencyIrange 50, 60 Hz 5% Main power supply See table page 2-4 Output/main circuit 3 AC 400 V 24 V switched (24 V S) Output voltage 24 V DC (20.4 V to 28.8 V) Output current DC 5 A when AS-Interface fitted DC 10 A when AS-Interface not fitted Residual ripple < 5% Backup min. 20 ms 24 V DC non-switched (24 V S) Output voltage 24 V DC (20.4 V to 28.8 V) Output current 10 A DC 10 A DC 10 A DC 10 A DC Residual ripple < 5% < 5% < 5% <5% Backup min. 20 ms min. 20 ms min. 20 ms min. 20 ms 30 V DC non-switched (AS-i) Output voltage AS-i -- 30 V DC (29.5 V to 31.6 V) -- 30 V DC (29.5 V to 31.6 V) Output current -- 2.4 A DC -- 2.4 A DC Residual ripple Backup -- min. 20 ms < 300 mVpp min. 20 ms -- min. 20 ms < 300 mVpp min. 20 ms Protection and monitoring Short circuit protection Main circuit Built-in circuit breaker Auxiliary circuits Built-in SDM Signaling devices Green (ready for operation) Yellow (power connected) Red (internal fault) Safety Degree of protection IP65 Certificates and approvals (in preparation) CE, UL, CSA Safety class I ECOFAST System Manual GWA 4NEB 950 5060-02 3-13 Power & Control Module (PCM), Cabinet Installation Order number 4FB2111-2AE010AA0 4FB2121-2AE010AA0 4FB2111-2AE010AA1 4FB2112-2AC0. 0AA0 EMC Emitted interference EN 55 081-2 Noise immunity EN 61000-6-2 Temperatures Ambient temperature 0 C to +40 C, +50 C with derating in the main circuit/auxiliary circuits Transport/ storage temperature -25 C to +70 C Relative humidity 15% to 75% at 25C (no condensation) Air pressure 700 to 1060 hPa Mechanical environmental conditions Transport Vibratory load 3g Shock 15 g with 11 ms Operation Vibratory load f = 10 to 58 Hz, d = 0,075 mm/58 to 100 Hz, 10g Schock 10 g with 6 ms/6 g with 10 ms Connections/feed-throughs Cage Clamp max. 2 x 16 mm2 max. current carrying capacity Input connections Output connections Main circuit Cage Clamp, 2,5 mm2 Cage Clamp, 2,5 mm 2 Cage Clamp, 2,5 mm 2 Cage Clamp, 2,5 mm2 Output connections Auxiliary circuits/field bus Cage Clamp, 2,5 mm2 Cage Clamp, 2,5 mm 2 Cage Clamp, 2,5 mm 2 Cage Clamp, 2,5 mm2 Cage Clamp, 2.5 mm 2 Throughfeed 4 x AS-i seal Cage Clamp, 2.5 mm 2 Throughfeed 4 x AS-i seal Cage Clamp, 2.5 mm 2 Cage Clamp, 2.5 mm 2 Output connections AS-Interface Output connections EMERGENCY STOP -- Cage Clamp, 2.5 mm2 -- Cage Clamp, 2.5 mm2 Cage Clamp, 1.5 mm 2 SIMATIC connections Dimensions/weight Housing dimensions (WxHxD) 520 x 830 x 240 Fixing dimensions (WxH) 350 x 809 Fixing holes 4 x M8 Weight max. 55 kg SIMATIC Controller S7-300, CPU 313C-2 DP I/O module S7-300, CPU 313C-2 DP I/O module AS-Interface master Main memory (EEPROM) MMC IM151, 64 KByte IM151, 64 KByte IM151, 64 KByte -- MMC Included Included Included -- Unassigned SIMATIC inputs 6 6 6 6 Unassigned SIMATIC outputs 13 13 13 13 External interfaces PROFIBUS-DP PROFIBUS-DP PROFIBUS-DP PROFIBUS-DP Data transfer rate S7-300, CPU 313C-2 DP I/O module AS-Interface master ET 200B I/O module max. 12 Mbit/s ECOFAST System Manual 3-14 GWA 4NEB 950 5060-02 4 Power Tee Connectors Section Topic Page 4.1 Description 4-2 4.2 Connections 4-5 4.3 Installation and Wiring 4-6 4.4 Dimension Drawings 4-8 4.5 Technical Data 4-9 ECOFAST Systemhandbuch GWA 4NEB 950 5060-01 4-1 Power Tee Connectors 4.1 Description Tasks Power tee connectors connect ECOFAST components with the power bus. The power bus is not interrupted when the ECOFAST components are unplugged. Three different versions are available: * Power tee connectors: this version connects the "incoming" power cable to the consumer using a Han Q8 mating connector. To conduct the main power, a power cable with free ends must be connected to the screw-type terminals. Scopes of supply: - Individually, including cable gland and Han Q8 plug housing for screwtype terminals. - Prefabricated, with cable in different lengths for conducting the main power. This supply type will not be described in this chapter. * Power tee clamping connector with Han Q8 socket. This version connects standard round cables to the consumer. The round cable is contacted using the insulation displacement method. * Power tee clamping connector with Han Q8 pin. This version connects standard round cables to the power & control module, for example. The round cable is contacted using the insulation displacement method. ECOFAST Systemhandbuch 4-2 GWA 4NEB 950 5060-01 Power Tee Connectors Versions The following versions are currently available: Order number Version Function 3RK1 911-2BG00 Power tee connector Connect consumer 3RK1 911-2BF00 Power tee clamping connector Connect consumer 3RK1 911-2BE00 Power tee clamping connector Connect power supply (e.g. PCM) Table 4-1: Power tee connector versions Sealing Sets for Power Tee Clamping Connectors Suitable seal sets are required for the power tee clamping connectors to attain degree of protection IP65/67. A seal set contains two seals, which are available with different internal diameters depending on the external diameter of the round cable used. ECOFAST power cables with 7 x 2.5 mm 2 and 5 x 4 mm2 have an external diameter of approx. 15 mm. Caution Sealing sets are not supplied with the power tee clamping connector. They must be ordered separately. The following sealing sets are currently available: Order number External diameter of round cable/mm 3RK1911-5BA00 10 to 13 3RK1911-5BA10 13 to 16 3RK1911-5BA20 16 to 19 3RK1911-5BA30 19 to 22 Table 4-2: Sealing sets for power tee clamping connectors ECOFAST Systemhandbuch GWA 4NEB 950 5060-01 4-3 Power Tee Connectors Installation Power tee connector To consumer Han Q8 socket Direction of power Han Q8 plug housing with seal and PG screwed gland Screw-type terminals Power tee clamping connector Cover Sealing for round cable*) Fixing lug Han Q8 socket to power supply (e.g. PCM) Sealing for round cable*) Cover Sealing for round cable *) Fixing lug Han Q8 pin to power supply (e.g. PCM) Power tee clamping connector with round cable inserted and cover open Terminal block with clamping screws *) not supplied Fig. 4-1: Power tee connectors ECOFAST Systemhandbuch 4-4 GWA 4NEB 950 5060-01 Power Tee Connectors 4.2 Connections Power tee connector Terminal Assignment Core no.* 1 Neutral conductor N 1 1 1 2 Phase L2 3 3 3 4 Brake 5 5 5 4 2 1 PE 5 Brake (reference potential) 6 6 6 6 Phase L3 4 4 4 8 Phase L1 2 2 2 8 6 5 Terminal numbers and Han Q8 pin numbers have the same assignment Power tee clamping connector Terminal Assignment Core no.* 1 1 Phase L1 2 2 2 2 2 Phase L2 3 3 3 3 3 Phase L3 4 4 4 PE 4 5 4 Neutral conductor N 1 1 1 6 5 Brake 5 5 5 6 Brake (reference potential) 6 6 6 Terminal numbers and Han Q8 pin numbers do not have the same assignment * Core no. 1 1 2 2 1 2 3 3 3 4 5 4 4 Caution Note that core numbers and terminal numbers are not identical for prefabricated power cables. Please read the information in "Installation and Wiring" as of page 4-6. 5 5 Fig. 4-2: Terminal assignment for power tee connectors ECOFAST Systemhandbuch GWA 4NEB 950 5060-01 4-5 Power Tee Connectors 4.3 Installation and Wiring Warning Hazardous electrical voltages! These may cause electric shock and burns. Disconnect the system and device from the power supply before starting work. Caution Refer to the information in the operating instructions. Procedure for installing and wiring the power tee connector To install and connect the power tee connector, carry out the following steps: Step Procedure 1 Strip the power cable. 2 Route the power cable through the PG screwed gland on the seal provided and the plug housing. 3 If necessary, unscrew the clamping screws. 4 Insert the individual wires into the screw-type terminals and secure the clamping screw. Make sure the terminals are assigned correctly. 5 Push the plug housing onto the power tee connector until you hear it engage. 6 Push the seal onto the plug housing and secure the PG screwed gland. 7 The power tee connector is now installed and connected. Table 4-3: Installing and connecting the power tee connector Wiring Terminal Core no. Assignment 1 1 1 1 Neutral conductor N 2 3 3 3 Phase L2 4 5 5 5 Brake PE 5 6 6 6 Brake (referencepotential) 6 4 4 4 Phase L3 8 2 2 2 Phase L1 The core numbers and their assignments are valid for power cables prefabricated at one end. Note that the core numbers and terminal numbers are not identical. Fig. 4-3: Power tee connector wiring ECOFAST Systemhandbuch 4-6 GWA 4NEB 950 5060-01 Power Tee Connectors Procedure for installing and wiring the power tee clamping connector Step Procedure 1 Connect the power tee clamping connector to the Han Q8 power terminal on the matching mating component (e.g. the consumer or the power supply). Secure the connection with the locking device 2 If required, you can screw the fixing lugs on the power tee clamping connector onto a flat surface using screws with a diameter of 5 mm. 3 Loosen the four screws in the cover. Open the cover. 4 Unscrew the clamping screws. 5 Strip the insulation from the power cable over a length of approximately 130 mm. Take care not to damage the insulation of the individual wires. 6 Place the seal around the round cable in such a way that there is approx. 10 mm of unstripped cable between the seal and the stripped part of the cable. 7 Insert the individual wires in the insulation displacement terminations. Make sure the terminals are assigned correctly. 8 Insert the throughfeeds with the round cable. Align the stripped part of the cable centrally inside the housing. 9 Firmly secure the clamping screws. The individual wires are bonded via the insulation displacement terminations. 10 Close the cover. The power tee clamping connector is now installed and connected. Table 4-4: Installing and connecting the power tee clamping connector Wiring ~ 130 1 2 Terminal 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 Core no. Assignment 1 2 2 2 Phase L1 2 3 3 3 Phase L2 3 4 4 4 Phase L3 PE 4 1 1 1 Neutral conductor N 5 5 5 5 Brake 6 6 6 6 Brake (reference potential) The core numbers and their assignments are valid for power cables prefabricated at one end. Note that the core numbers and terminal numbers are not identical. Fig. 4-4: Power tee clamping connector wiring ECOFAST Systemhandbuch GWA 4NEB 950 5060-01 4-7 Power Tee Connectors 4.4 Dimension Drawings Power tee connector 24 35 104 57,1 6 PG 1 102 107 Power tee clamping connector 158 130 112,6 78,5 55 O 5,5 O 5,5 142,5 Fig. 4-5: Dimension drawings of power tee connectors ECOFAST Systemhandbuch 4-8 GWA 4NEB 950 5060-01 Power Tee Connectors 4.5 Technical Data Location On the system * Wall mounting * Mounted directly on the ECOFAST consumer 7 x 4 mm2 Power bus 7 x 2.5 mm2 Consumer 5 x 4 mm2 External dia.: approx. 14 mm Throughfeed dia.:approx. 13 to 16 mm 7 x 2.5 mm2 External dia.: approx. 14.5 mm Throughfeed dia.:approx. 13 to 16 mm Suitable cables Power tee connector Power tee clamping connector Rated current 32 A Any Installation position Degree of protection IP65/67 Watertight acc. to IEC 529 (DIN 40050) Enclosure dimensions: H x W x D 1 Power tee connector 107 x 104 x 35 Power tee clamping connector 112.6 x 158 x 55 Weight Approx. 0.3 kg Installation temperature -10C to +40C Operating temperature -25C to +40C Storage/transport temperature -40C to +80C Number of poles 7 Vibratory load 5g Rated insulation voltage 500 V 600 V according to EN 61 984 according to UL 1977 Standards, approvals DIN VDE 0627 UL 1977, CSA Establish bonding Table 4-5: Technical data for power tee connectors ECOFAST Systemhandbuch GWA 4NEB 950 5060-01 4-9 Power Tee Connectors ECOFAST Systemhandbuch 4-10 GWA 4NEB 950 5060-01 Hybrid Field Bus Connections Section Topic 5 Page 5.1 Description 5-2 5.2 Connections 5-4 5.3 Installation, Wiring and Commissioning 5-7 5.3.1 Installation 5-7 5.3.2 Wiring 5-8 5.3.3 Commissioning 5-10 5.4 Diagnostics 5-11 5.5 Dimension Drawings 5-12 5.6 Technical Specifications 5-13 5.7 Applications 5-14 5.7.1 Passive Hybrid Field Bus Connection for Supply 5-14 5.7.2 Passive Hybrid Field Bus Connection for Conducting 5-15 5.7.3 Active Hybrid Field Bus Connection for Supply 5-16 5.7.4 Active Hybrid Field Bus Connection for Conducting 5-17 5.7.5 Active Hybrid Field Bus Connection for Supply 5-18 5.7.6 Active Hybrid Field Bus Connection for Conducting 5-19 5.7.7 Active Hybrid Field Bus Connection for Supply 5-20 5.7.8 Active Hybrid Field Bus Connection for Supply 5-21 5.7.9 Conveyor Section with Hybrid Field Bus Connections for Supply and Conducting 5-22 5.7.10 Installation Method with PROFIBUS-DP - Cu 5-23 5.7.11 PROFIBUS-DP -Optical-Fiber Cables 5-24 5.7.12 PROFIBUS-DP (Cu) and passive Hybrid Field Bus Connections with 2 Separate Power Supplies 5-25 5.7.13 PROFIBUS-DP (Cu) and active Hybrid Field Bus Connections with 2 Separate Power Supplies 5-26 5.7.14 PROFIBUS-DP (LWL) and passive Hybrid Field Bus Connections with 2 Separate Power Supplies 5-27 ECOFAST System Manual GWA 4NEB 950 5060-02 5-1 Hybrid Field Bus Connections 5.1 Description Tasks In the ECOFAST system, hybrid field bus connections act as an interface between the control cabinet/terminal box (IP20) and the field bus level (IP65/67). In the ECOFAST system, hybrid field bus connections perform the following functions: * Supply: - data via RS 485, shielded copper cable (Cu) or optical-fiber cable. - 2 x 24 V DC, switched (S) and non-switched (NS). * Conduct: - data via RS 485, shielded copper cable (Cu) or optical-fiber cable. - 2 x 24 V DC, switched (S) and non-switched (NS). Installation Hybrid field bus connections always have 2 channels (2 Han-Brid on the IP65 side). Depending on the device version, the hybrid field bus connection comprises the following components: * IP65 side (field bus level) - Han-Brid pin/socket for conducting - Han-Brid socket/socket for supplying IP20 to IP65 * IP20 side (in control cabinet) - Terminal block for 2 x 24 V DC (switched and non-switched) - PROFIBUS-DP: Shielding terminals and A/B terminals or SUB-D sokket (9-pin). IP65 side (field bus level, external) IP20 side (in control cabinet) Example: Conducting optical-fiber cable 3RK1911-1AB32 Fig. 5-1: Hybrid field bus connections ECOFAST System Manual 5-2 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections Versions The following versions are currently available: Order number Function Segment 1/2 Medium PROFIBUS-DP IP20 3RK1911-1AA22 Supply (passive) Socket/socket (copper) A/B terminals 3RK1911-1AA32 Conducting (passive) Pin/socket (copper) A/B terminals 3RK1911-1AB22 Supply (active) Socket/socket (optical-fiber cable) SUB-D socket 3RK1911-1AB32 Conducting (active) Pin/socket (optical-fiber cable) SUB-D socket 3RK1911-1AE22 Supply (active) Socket/socket (copper) SUB-D socket 3RK1911-1AE32 Conducting (active) Pin/socket (copper) SUB-D socket Table 5-1: Hybrid field bus connection versions Passive and active * Passive means that the signals are not regenerated. The IP20 and IP65 sides are electrically connected. * Active means that the signals are regenerated (repeater function). The IP20 and IP65 sides are electrically isolated for versions with an optical-fiber cable. 24 V DC non-switched supply voltage (NS) This voltage is required for: * supplying the electronics * interrogating the auxiliary contacts 24 V DC switched supply voltage (S) This voltage is required for: * controlling the switching elements (e.g. contactor) ECOFAST System Manual GWA 4NEB 950 5060-02 5-3 Hybrid Field Bus Connections 5.2 Connections IP65-side connections IP65 side (field bus level, external) Supply Cu Han-Brid Supply optical-fiber cable Conducting Cu Socket Socket Han-Brid Pin Socket Conducting optical-fiber cable Fig. 5-2: Hybrid field bus connections (IP65 side) IP20-side connections IP20 side (in control cabinet) Terminal block for 2 x 24 V DC (S and NS) Shielded terminals Terminals A1 (green)/B1 (red) for PROFIBUS-DP Channel 1 Terminal block for 2 x 24 V DC (S and NS) SUB-D socket for PROFIBUS-DP Terminals A2 (green)/B2 (red) for PROFIBUS-DP Channel 2 Fig. 5-3: Hybrid field bus connections (IP20 side) ECOFAST System Manual 5-4 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections Connections for PROFIBUS-DP and 2 x 24 V DC (IP65 Side) 2 x Han-Brid socket/socket or pin/socket Pin assignment to DESINA: Copper $ % $ % Pin Socket Optical-fiber cable 5[' 7[' 5[' 7[' Pin Socket Pin Assignment Comment 1 +24 V DC Non-switched 2 0 V DC Corresponds to 1 3 0 V DC Corresponds to 4 4 +24 V DC Switched Field bus -- A1/A2 Line A (field bus) -- B1/B2 Line B (field bus) -- Shield (field bus) -- Pin Assignment Comment 1 +24 V DC Non-switched 2 0 V DC Corresponds to 1 3 0 V DC Corresponds to 4 4 +24 V DC Switched TxD Field bus sender Optical-fiber cable field bus RxD Field bus receiver Optical-fiber cable field bus Table 5-2: Pin assignment for hybrid field bus connection (IP65 side) ECOFAST System Manual GWA 4NEB 950 5060-02 5-5 Hybrid Field Bus Connections Connections for passive hybrid field bus connection (IP20 side) Connection Assignment Comment 24 V terminal block +NS +24 V DC Non-switched -NS 0 V DC Corresponds to +NS -S 0 V DC Corresponds to +S +S +24 V DC Switched Terminals A/B for PROFIBUS-DP A1/A2 Line A (field bus) B1/B2 Line B (field bus) green AB Shield (field bus) red Table 5-3: Connections for passive hybrid field bus connection (IP20 side) Connections for Active Hybrid Field Bus Connection (IP20 Side) Connection Assignment Comment 24 V terminal block +NS +24 V DC Non-switched -NS 0 V DC Corresponds to +NS -S 0 V DC Corresponds to +S +S +24 V DC Switched SUB-D socket for PROFIBUS-DP 3 RxD/TxD-P (+) 4 CNTR-P 5 DGND 6 VP 7 -- 8 RxD/TxD-N (-) Pin 1 -- 5 2 6. Shield 9. 1 Table 5-4: Connections for passive hybrid field bus connection (IP20 side) ECOFAST System Manual 5-6 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.3 Installation, Wiring, and Commissioning Note Warning Hazardous electrical voltages! These may cause electric shock and burns. Disconnect the system and device from the power supply before starting work. Caution Refer to the information in the operating instructions. 5.3.1 Installation Caution Note that it may be more convenient to wire the IP20 side before installation (see next page for description). Procedure 1 Description Cut out the required section (90 mm x 80 mm) on the control cabinet. Note that the wall strength must not exceed 5 mm. 90 Step 80 2 Place the hybrid field bus connection into the cutout section. 3 Secure the hybrid field bus connection using the quick-clamping devices by tightening the four screws. 4x Table 5-5: Installing the hybrid field bus connection ECOFAST System Manual GWA 4NEB 950 5060-02 5-7 Hybrid Field Bus Connections 5.3.2 Wiring Procedure Step Description 1 Strip the lines. For more information on stripped lengths, cross-sections, and terminal assignments, refer to the table on the next page. 2 Use the cage clamps to connect the 24 V DC cables (S and NS) to the 24 V DC terminal block. Passive hybrid field bus connection Active hybrid field bus connection 3 Use the cage clamps to connect the Connect the PROFIBUS-DP cable to PROFIBUS-DP cables to terminals A1/ the 9-pin SUB-D socket. B1 and A2/B2. 4 Connect the shield to the shield terminals. 5 If you want to connect a bus terminating connector, this must be supplied with 24 V DC. To do so, jumper terminals S1 and S2 of the non-switched (NS) 24 DC (see below). 6 This completes the wiring. -- Table 5-6: Wiring the hybrid field bus connection Diagram Passive hybrid field bus connection A1 B1 A2 B2 Active hybrid field bus connection 2 x 24 V DC 2 x 24 V DC 9-pin SUB-D socket Shielded terminals 24 V DC wiring: S1 Jumpers for supplying S1 with 2 x 24 V DC S2 24 V DC NS 24 V DC S +NS -NS -S +S Fig. 5-4: Wiring the hybrid field bus connection ECOFAST System Manual 5-8 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections x x x x PROFIBUS-DP 9-pol. SUB-D Stripped lengths, cross sections, terminal assignments S1 S2 A1 B1 x x rot grun 9 9 PROFIBUS-DP A1 B1 A2 B2 A2 B2 2 9 Cage Clamp 1 AWG 15 x x x x S2 9 x S1 x 2 x 24 V DC +NS -NS - S + S 1,5 mm AB +NS-NS -S +S 3RK1911-1AE32 3RK1911-1AE22 3RK1911-1AB32 3RK1911-1AB22 3RK1911-1AA32 3RK1911-1AA22 Cage Clamp 2 1 3 Table 5-7: Stripped lengths, cross-sections, terminal assignments ECOFAST System Manual GWA 4NEB 950 5060-02 5-9 Hybrid Field Bus Connections 5.3.3 Commissioning Procedure After installing and wiring the hybrid field bus connection, you must commission it. Carry out the following steps: Step Description 1 Connect up to 2 hybrid field bus cables. 2 Close the control cabinet. 3 Attach bus terminating connectors or screw caps to any unused connections. 4 Switch on the main power. Table 5-8: Procedure for commissioning the hybrid field bus connection ECOFAST System Manual 5-10 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.4 Diagnostics LEDs for diagnosis Certain faults are highlighted by 2 LEDs for the active hybrid field bus connections. The LEDs are located on the IP20 side (in the control cabinet) in front of the SUB-D socket. Yellow LED Green LED Fig. 5-5: Diagnosis LEDs for active hybrid field bus connections Table Fault No supply voltage from 24 V DC (NS) Display/LED Green LED: OFF No supply voltage from 24 V DC (NS) No signal from master Remedy Connect 24 V DC (NS) supply voltage Connect 24 V DC (NS) supply voltage Yellow LED: OFF Check signal cable from master for interruption Baud rate not recognized Plug in bus terminating connector Baud rate not recognized Plug in bus terminating connector Yellow LED flickers Check bus station in direction of master for fault Table 5-9: Diagnosis for active hybrid field bus connections ECOFAST System Manual GWA 4NEB 950 5060-02 5-11 Hybrid Field Bus Connections 5.5 Dimension Drawings Cut-out section on control cabinet: IP65 90 IP20 80 5 max. 103 65 93 Fig. 5-6: Dimension drawing of the hybrid field bus connection ECOFAST System Manual 5-12 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.6 Technical Data General Technical Data On the system Location Mounted directly on the control cabinet Any Installation position Degree of protection Control cabinet Field bus Enclosure dimensions: HxWxD 103 x 93 x 65 Weight Approx. 250 g Operating temperature -25C to +50C IP20 IP65/67 Storage/transport temperature -40C to +80C Vibratory load 5g Rated insulation voltage 500 V AC Standards, approvals DIN VDE 0627, DIN EN 61984, UL 1977, CSA (in preparation) DIN EN 60529, DIN VDE 0160, DIN EN 50178, DIN EN 50170 Electrical data Rated voltage 24 V DC non-switched (NS) 24 V DC -25%/+50% 18 V to 36 V 24 V DC switched (S) 24 V DC -25%/+50% 18 V to 36 V Rated current Max. 10 A For each rated voltage Voltage supply From 24 V DC (non-switched) (NS) Current consumption Max. 130 mA Voltage failure bypass > 20 ms Table 5-10: Technical data for hybrid field bus connections ECOFAST System Manual GWA 4NEB 950 5060-02 5-13 Hybrid Field Bus Connections 5.7 Applications 5.7.1 Passive Hybrid Field Bus Connection for Supply SIMATIC e. g. CPU 315-2 DP Power supply PROFIBUS standard cable e. g. 6ES7 9720BA50-0AA0 Non-switched (NS) Switched (S) Cage Clamp Cage Clamp IP20 (inside) IP65 (in the field) Note: Bus terminating connectors are plugged directly onto the data tee connector Hybrid fIeld bus connection HanBrid Left segment Bus terminating connector Supply: 3RK1911-1AA22 (Bu/Bu) Hybrid field bus cable RS 485 e. g. 6XV1830-7BH30 Right segment Slave 4 Slave 3 Slave 3 Fig. 5-7: Passive hybrid field bus connection 3RK1911-1AA22 (socket/socket) Typical set-up: IP20 (inside): * PLC/DP master/PROFIBUS-DP via RS 485 * Power supply for switched/non-switched voltage * Passive hybrid field bus connection for combining PROFIBUS-DP (Cage Clamp) + power supplies (Cage Clamp) * Segment divided between left and right IP65 (in the field): * Supply to PROFIBUS-DP in RS 485 in the left and right segments via Han Brid (sockets) * Left and right bus terminating connectors on the last data tee connectors of the left and right segments * Supply to the power supplies (NS + S) via Han Brid (sockets) ECOFAST System Manual 5-14 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.7.2 Passive Hybrid Field Bus Connection for Conducting Bus plug e. g. 6ES7972-0BA50-0XA0 e. g. OP 27 Slave 4 PROFIBUS standard cable Non-switched (NS) PROFIBUS DP RS 485 IP20 (inside) Cage clamp Cage clamp IP65 (in the field) e. g. Power & Control Module (P&CM) Hybrid field bus connection Conducting: 3RK1911-1AA32 (pin/socket) 2 x 24 V DC 3~ Han Brid Station 1 Note: Bus terminating connectors are plugged directly onto the data tee connector Hybrid field bus cable RS 485 e. g. 6XV1830-7BH30 Slave 3 Slave 5 Fig. 5-8: Passive hybrid field bus connection 3RK1911-1AA32 (pin/socket) Typical set-up: Integration of an operator panel (OP) IP20 (inside): * PROFIBUS-DP and power supply to the components separated by the hybrid field bus connection * Standard PROFIBUS-DP line connected to the hybrid field bus connection with Cage Clamp * PROFIBUS-DP line connected to the component with a 9-pole SUB-D RS 485 bus plug * Power supply to the component (e.g. operator panel) connected to the hybrid field bus connection with Cage Clamp (NS + S) * Standard IP20 component (e.g. operator panel) IP65 (in the field): * Supply to PROFIBUS-DP in RS 485 and power supply via the hybrid field bus line to the pins of the hybrid field bus connection. PROFIBUS-DP and power supplies conducted into the hybrid field bus line via the sockets of the hybrid field bus connection * Left and right bus terminating connectors on the last data tee connectors ECOFAST System Manual GWA 4NEB 950 5060-02 5-15 Hybrid Field Bus Connections 5.7.3 Active Hybrid Field Bus Connection for Supply SIMATIC e. g. CPU 315-2 DP Power supply PROFIBUS standard cable Non-switched (NS) PROFIBUS-DP RS 485 Sub-D IP20 (inside) IP65 (in the field) Switched (S) Cage Clamp Hybrid field bus connection HanBrid Supply: 3RK1911-1AB22 (socket/socket) Hybrid field bus fiber-optic cable e. g. 6XV1830-6DH30 Cap Slave 3 Cap Slave 4 Fig. 5-9: Active hybrid field bus connection 3RK1911-1AB22 (socket/socket) Typical set-up: IP20 (inside): - PLC/DP master/PROFIBUS-DP via RS 485 - Power supply for switched/non-switched voltage - Active hybrid field bus connection for combining PROFIBUS-DP 9-pin SUB-D (socket) + power supplies (terminals) - Segement divided left and right IP65 (in the field): - PROFIBUS-DP supply with fiber-optic cables in the segment (left/right) via versatile link module - Bus terminating connector (left/right) on the last data tee connector - Power supply (NS + S) via Han-Brid (sockets) ECOFAST System Manual 5-16 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.7.4 Active Hybrid Field Bus Connection for Conducting Bus plug e. g. 6ES7 972-0BB11-0XA0 e. g. OP 27 Slave 4 PROFIBUS standard cable Non-switched (NS) Switched (S) PROFIBUS-DP RS 485 Sub-D Cage Clamp IP20 (inside) IP65 (in the field) e. g. Power & Control Module (PCM) 2 x 24 V DC Han-Brid Hybrid field bus connection Conducting: 3RK1911-1AB32 (pin/socket) 3~ Station 1 Cap Cap Hybrid field bus fiber-optic cable e. g. 6XV1830-6DH30 Slave 3 Slave 5 Fig. 5-10: Active hybrid field bus connection 3RK1911-1AB32 (pin/socket) Typical set-up: integrating an operator panel (OP) IP20 (inside) - Active hybrid field bus connection for separating PROFIBUS-DP and converting optical-fiber cable to RS 485 + power supplies (NS + S) for the components. - Standard PROFIBUS-DP cable connected to hybrid field bus connection with 9-pin SUB-D socket. - PROFIBUS-DP cable connected to the component with 9-pin SUB-D bus plug. - Component power supply (e.g. for operator panel) connected to hybrid field bus connection with cage clamp (NS + S). - Standard IP20 component (e.g. operator panel) IP65 (in the field): - Supply to PROFIBUS-DP with optical-fiber cables and power supplies via hybrid field bus line to pins of hybrid field bus connection - PROFIBUS-DP and power supplies conducted to hybrid field bus line via sockets of hybrid field bus connection. - Screw caps (left and right) on the last data tee connector. ECOFAST System Manual GWA 4NEB 950 5060-02 5-17 Hybrid Field Bus Connections 5.7.5 Active Hybrid Field Bus Connection for Supply SIMATIC e. g. CPU 315-2 DP Power supply PROFIBUS standard cable Non-switched (NS) PROFIBUS-DP RS 485 Sub-D + fiber-optic cable IP20 (inside) Switched (S) Cage Clamp IP65 (in the field) Han-Brid Hybrid field bus connection Supply: 3RK1911-1AD22 (socket/socket)) Hybrid field bus fiber-optic cable e. g. 6XV1830-6DH30 Cap Cap Slave 3 Slave 4 Fig. 5-11: Active hybrid field bus connection 3RK1911-1AD22 (socket/socket) Typical set-up: IP20 (inside): - PLC/DP master/PROFIBUS-DP via RS 485 or optical-fiber cable - Power supply for switched/non-switched voltage - Active hybrid field bus connection for combining PROFIBUS-DP 9-pin SUB-D socket or optical-fiber cable + power supplies (terminals) - Segment divided left and right IP65 (in the field): - Supply to PROFIBUS-DP with optical-fiber cables in segment (left/right) via Han-Brid (sockets) - Screw caps (left and right) on the last data tee connector - Power supply (NS + S) via Han-Brid (sockets) ECOFAST System Manual 5-18 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.7.6 Active Hybrid Field Bus Connection for Conducting e. g. OP 27 Slave 4 Non-switched (NS) PROFIBUS standard cable RS 485 or/and fiber-optic cable PROFIBUS-DP RS 485 Sub-D + fiber-optic cable Cage Clamp IP20 (inside) IP65 (in the field) e. g. Power & Control Module (PCM) Hybrid field bus connection Conducting: 3RK1911-1AD32 (pin/socket)) 2 x 24 V DC 3~ Han-Brid Station 1 Cap Cap Hybrid field bus fiber-optic cable e. g. 6XV1830-6DH30 Slave 3 Slave 5 Fig. 5-12: Active hybrid field bus connection 3RK1911-1AD32 (pin/socket) Typical set-up: integrating an operator panel (OP) IP20 (inside): - Active hybrid field bus connection for separating PROFIBUS-DP and converting optical-fiber cable to RS 485 + power supplies (NS + S) for the components. - Standard PROFIBUS-DP cable connected to hybrid field bus connection with 9-pin SUB-D (socket) or optical-fiber cable. - PROFIBUS-DP cable connected to the component with 9-pin SUB-D bus plug or FO. - Component power supply (e.g. for operator panel) connected to hybrid field bus connection with cage clamp (NS + S). - Standard IP20 component (e.g. operator panel) IP65 (in the field): - Supply to PROFIBUS-DP with optical-fiber cables and power supplies via hybrid field bus line to pins of hybrid field bus connection. - PROFIBUS-DP and power supplies conducted to hybrid field bus line via sockets of hybrid field bus connection. - Screw caps (left and right) on the last data tee connector. ECOFAST System Manual GWA 4NEB 950 5060-02 5-19 Hybrid Field Bus Connections 5.7.7 Active Hybrid Field Bus Connection for Supply e. g. CPU 315-2 DP Stromversorgung SIMATIC PROFIBUS standard cable RS 485 PROFIBUS-DP RS 485 SUB-D IP20 (inside) Non-switched (NS) Switched (S) Cage Clamp IP65 (in the field) Note: Bus terminating connectors are plugged directly onto the data tee connector Hybrid field bus connection Supply: 3RK1911-1AE22 (socket/socket) Bus terminating connector Hybrid cable RS 485 Slave 3 Slave 4 Fig. 5-13: Active hybrid field bus connection 3RK1911-1AE22 (socket/socket)) Typical set-up: IP20 (inside): - PLC/DP master/PROFIBUS-DP via RS 485 - Power supply for switched/non-switched voltage - Active hybrid field bus connection for combining PROFIBUS-DP 9-pin SUB-D (socket) + power supplies (cage clamp) - Segment divided left and right IP65 (in the field): - PROFIBUS-DP supply with RS 485 in the segment (left and right) via HanBrid (sockets) - Bus terminating connector (left/right) on the last data tee connector - Power supply (NS + S) via Han-Brid (sockets) ECOFAST System Manual 5-20 GWA 4NEB 950 5060-02 Hybrid Field Bus Connections 5.7.8 Active Hybrid Field Bus Connection for Supply SIMATIC S7 Power supply Nonswitched (NS) segment 1-3 Switched (S) segment 1/2/3 PROFIBUS-DP RS 485 9-pol. SUB-D e. g. 6ES7972-0BA50-0AA0 3RK1911-1AE22 (socket/socket) Hybrid field bus cable 6XV1830-7AHxx PROFIBUS-DP RS 485 Segment 1 left Segment 1Segment 2 right left Segment 2 right Segment 3 left Segment 3 right Fig. 5-14: Active hybrid field bus connection 3RK1911-1AE22 (socket/socket) Typical set-up: IP20 (inside): - PLC/DP master with PROFIBUS-DP via RS 485 - Power supply for several non-switched and independently-switched voltages (creation of several emergency stop circuits, disconnection of individual segments) via cage clamp - Linear design of PROFIBUS DP on the inside (IP20) of the hybrid field bus connections with terminating resistors for the last 9-pin SUB-D connector of the hybrid field bus connection and on the CP of SIMATIC S7 IP65 (in the field): - PROFIBUS-DP supply with RS 485 in three segments (left/right) via HanBrid (sockets) - Bus terminating connector (left/right) on the last data tee connector - Power supply (NS + S) via Han-Brid (sockets) ECOFAST System Manual GWA 4NEB 950 5060-02 5-21 5-22 Slave 3 Bus terminating connector Slave 4 RS 485 Hybrid field bus connection Supply: 3RK1911-1AA22 Socket/socket PROFIBUS standard cable RS 485 Non-switched Switched OP 27 Slave 6 FC ET 200X-RS 485 Slave 7 Bus terminating connector ET 200S in local box Hybrid field bus connection Conducting: 3RK1911-1AA32 Pin/socket Slave 5 OP in local box Hybrid field bus cable RS 485 PROFIBUS-DP PS 2 x 24 V DC 5.7.9 Internal bus station e.g. ET 200S/M SIMATIC S7 Hybrid Field Bus Connections Conveyor Section With Hybrid Field Bus Connections for Supply and Conducting Fig. 5-15: Conveyor section with hybrid field bus connections for supply and conducting ECOFAST System Manual GWA 4NEB 950 5060-02 Left segment Right segment 400 V AC 3/PE-50/60 Hz Power cable Bus terminating connector or left segment Slave 10 Slave 3 Order numbers: Slave 11 Slave 4 Slave 12 Slave 5 Left segment Right segment Data tee connector PCM: Data tee connector: Bus terminating connector: Hybrid field bus cable RS 485: Hybrid field bus cable RS 485 Terminating resistor PROFIBUS CONNECTOR connected internally or left segment Power & control module (PCM) with - PLC 2 x 24 V cc - 2 x 24 V DC supply - 400 V AC main power supply Slave 32 Slave 9 Screw cap 5.7.10 PROFIBUS connector e.g CPU 315-2DP Typical application: Installation system with PROFIBUS DP in Cu Hybrid Field Bus Connections Installation Method with PROFIBUS-DP - Cu Fig. 5-16: Installation system with PROFIBUS-DP in Cu ECOFAST System Manual GWA 4NEB 950 5060-02 5-23 5-24 Left segment Right segment Power cable 3/PE-50/60 Hz 400 V AC PROFIBUS connector Screw cap or left segment Slave 10 Slave 3 2 x 24 V cc Slave 11 Slave 4 Terminating resistor PROFIBUS connector connected internally or left segment Slave 12 Slave 5 Left segment Right segment Data tee connector Order numbers: 4FB ... PCM: 3RK1911-2AH00 Data tee connector: ??? Screw cap: Hybrid field bus fiber-optic cable: 6XV1830-6DH15 (1.5 m) 6XV1830-6DH30 (3 m) 6XV1830-6DH50 (5 m) 6XV1830-6DN10 (10 m) 6XV1830-6DN15 (15 m) Hybrid field bus fiber-optic cable Power & Control Module (PCM) with - PLC - 2 x 24 V DC supply - 400 V AC main power supply Typical application: Installation system with PROFIBUS DP fiber-optic cable Slave 32 Slave 9 Screw cap 5.7.11 3~ e. g. CPU 315-2DP Hybrid Field Bus Connections PROFIBUS-DP - Optical-Fiber Cable Fig. 5-17: Installation system with PROFIBUS DP fiber-optic cable ECOFAST System Manual GWA 4NEB 950 5060-02 M Slave 3 IP65 IP20 BA K2 M Slave 4 B A K1 M Slave 5 +S -S -NS +NS +S -S -NS +NS Non-switched Switched Power supply 2 x 24 V DC M Slave 6 Hybrid field bus cable RS 485 => Channel 1 supplies the OP (Slave 7) with power => Channel 2 of the hybrid field bus connection on slave 7 is supplied by the second power supply The power supply is not jumpered on the hybrid field bus connection B A K1 B A K2 e. g. OP 27 Slave 7 M Slave 8 +S -S -NS +NS +S -S -NS +NS Non switched Switched M Slave 9 Bus terminating connector IP65 IP20 Power supply 2 x 24 V DC 5.7.12 e. g. CPU 315-2 DP Typical application: installation system with PROFIBUS DP (Cu) and passive hybrid field bus connections with 2 separate power supplies Hybrid Field Bus Connections PROFIBUS-DP (Cu) and Passive Hybrid Field Bus Connections with 2 Separate Power Supplies K2 K1 K2 K1 Fig. 5-18: PROFIBUS-DP (Cu) and passive hybrid field bus connectionswith 2 separate power supplies ECOFAST System Manual GWA 4NEB 950 5060-02 5-25 5-26 M M Slave 4 Slave 5 M Slave 6 Hybrid field bus cable M Slave 7 The power supply is not jumpered on the hybrid field bus connection on on slave 8 => Channel 1 supplies the OP (slave 8) with power => Channel 2 of the hybrid field bus connection on slave 8 is supplied by the second power supply M Slave 9 Cap Non-switched +S -S -NS +NS +S -S -NS +NS 2 x 24 V cc IP65 IP20 Power supply Switched e. g. OP 27 Slave 8 Non switched +S -S -NS +NS +S -S -NS +NS M 2 x 24 V DC Power supply Switched K2 K1 Slave 3 HP Versatile Link 9-pin SUB-D e. g. CPU 315-2 DP 5.7.13 IP65 IP20 K2 Typical application: Installation system with PROFIBUS DP (Cu) and active hybrid field bus connections with 2 separate power supplies Hybrid Field Bus Connections PROFIBUS-DP (Cu) and Active Hybrid Field Bus Connections with 2 Separate Power Supplies K2 K1 Fig. 5-19: PROFIBUS-DP (Cu) and active hybrid field bus connections with 2 separate power supplies ECOFAST System Manual GWA 4NEB 950 5060-02 9-pin SUB-D Slave 4 M M K2 K1 Data segment 1 M Slave 5 M Slave 6 Hybrid field bus fiber-optic cable IP65 IP20 In the active hybrid field bus connection, data is jumpered as standard. => A 2nd hybrid field bus connection is required in station 2 to supply a new data segment (data segment 2). +S -S -NS +NS +S -S -NS +NS M Data segment 2 Slave 3 +S -S -NS+NS +S -S -NS+NS M Slave K2 K1 Slave 3 +S -S -NS +NS +S -S -NS +NS e. g. CPU 315-2 DP K2 K1 Screw cap HP Versatile Link IP65 IP20 Switched Non-switched Power supply 5.7.14 e. g CPU 315-2 DP 2 x 24 V DC Typical application: Installation system with PROFIBUS DP (optical-fiber cable) with 2 separate data supply lines Hybrid Field Bus Connections PROFIBUS-DP (Optical-Fiber Cable) and Passive Hybrid Field Bus Connections with 2 Separate Power Supplies Fig. 5-20: PROFIBUS-DP (optical-fiber cable) and passive hybrid field bus connections with 2 separate power supplies ECOFAST System Manual GWA 4NEB 950 5060-02 5-27 Hybrid Field Bus Connections ECOFAST System Manual 5-28 GWA 4NEB 950 5060-02 Data Tee Plug Connector Section Topic 6 Page 6.1 Description 6-2 6.1.1 Pin assignment 6-3 6.2 Dimension Drawing 6-4 6.2.1 Technical Data 6-5 ECOFAST System Manual GWA 4NEB 950 5060-02 6-1 Data Tee Plug Connector 6.1 Description Definition Data tee plug connectors connect the components of an automation system with * PROFIBUS DP Two data tee plug connectors are available in the ECOFAST system: - With copper cable (PROFIBUS-DP Cu) - With optical-fiber cable (PROFIBUS-DP optical-fiber cable) * Non-switched supply voltage 24 V DC (DC24V-NS) * Switched supply voltage 24 V DC (DC24V-S) Non-switched supply voltage 24 V DC This voltage is required for * supplying the electronics in the motor starter * interrogating the auxiliary contacts Switched supply voltage 24 V DC This voltage is required for * controlling the switching elements (e.g. contactor) ECOFAST System Manual 6-2 GWA 4NEB 950 5060-02 Data Tee Plug Connector 6.1.1 Pin assignment On the motor starter: SUB-D female connector, 25-pole Data tee connector PROFIBUS-DP Cu $ % $ Pin % Socket Output Pin Input Assignment Colour*) 1 + 24 V DC non-switched black 1 2 0 V DC non-switched black 2 3 0 V DC switched black 3 4 +24 V DC switched black 4 A Line A field bus green B Line B field bus red Shield field bus Data tee plug connector PROFIBUS-DP optical-fiber cable 5' 7' 5' Pin 7' Pin Input Socket Output Assignment optical fiber field bus 5' 7' 5' 7' 5' 7' Assignment Colour*) 1 + 24 V DC non-switched black 1 2 0 V DC non-switched black 2 3 0 V DC switched black 3 4 +24 V DC switched black 4 TD optical-fiber cable field bus transmitter see Fig. below RD optical-fiber cable field bus receiver see Fig. below 5' 7' *) Core colours of the DESINA Hybrid field bus cable Data plug connector (Socket) Data plug connector (Pin) OF field bus Fig. 6-1: Pin assignment for the data tee plug connector/core assignment Hybrid field bus cable ECOFAST System Manual GWA 4NEB 950 5060-02 6-3 Data Tee Plug Connector 6.2 Dimension Drawing Bild 6-2: Dimension drawing of the data tee connector ECOFAST System Manual 6-4 GWA 4NEB 950 5060-02 Data Tee Plug Connector 6.2.1 Technical Data Location On the system Connected to motor starter Any Installation position Degree of protection IP65/67 Watertight according to IEC 529 (DIN 40050) Cooling Convection No additional cooling required Weight 105 g 100 g Copper variant Optical-fiber cable variant Operating temperature -20 C to +40 C Do not allow condensation to form! Max. 55 C with reduction of IDC24V-NS and IDC24V-S each with 0.3 A per K Storage/transport temperature -40 C to +80 C Relative humidity 5% to 95% Do not allow condensation to form! Site altitude 2,000 m No restrictions Vibratory load f = 5 to 26 Hz; d = 0.75 mm f = 26 to 150 Hz; a = 2 g 10 cycles Shock a = 150 m/s2 (15 g) with 11 ms each with 3 shocks in all axes (=18) ESD 8 kV air discharge 6 kV contact discharge IEC 1000-4-2 Severity 3 Electromagnetic fields 10 V/m IEC 1000-4-3 Severity 3 BURST 2 kV/5 kHz supply voltage 1 kV/5 kHz data cables 2 kV/5 kHz process cables IEC 1000-4-4 Severity 3 Emitted interference Limit value class A EN 55011 ECOFAST System Manual GWA 4NEB 950 5060-02 6-5 Data Tee Plug Connector Electrical data for auxiliary power Non-switched voltage 24 V DC-NS Voltage range Switched voltage 24 V DC-S 20.4 V DC to 28.8 V DC Standard power supply to DIN 19240 Maximum current-carrying 10 A capacity from Han Brid to Han Brid 10 A Polarity protection No No Short-circuit protection/overload protection No No Insulation voltage 500 V DC between auxiliary voltages and PE Electrical data for communication Copper variant Baud rates supported 12,000 kBd 6,000 kBd 3,000 kBd 1,500 kBd 500 kBd 187.5 kBd 93.75 kBd 45.45 kBd 19.2 kBd 9.6 kBd Optical-fiber cable variant 12,000 kBd (6,000 kBd) not permitted (3,000 kBd) not permitted 1,500 kBd 500 kBd 187.5 kBd 93.75 kBd 45.45 kBd 19.2 kBd 9.6 kBd Cascade depth*) -- 9 at 12,000 kBd 32 at other baud rates Maximum permissible fiber-optic cable length (POF) between 2 stations -- 50 m Table 6-1: Technical data for the data tee connectors *) Maximum number of data tee connectors in the fiber-optic cable segment. If the DP master for a fiber-optic cable system is located centrally with regard to topology, the maximum cascade depth is permissible at each fiber-optic cable segment connected to the DP master. ECOFAST System Manual 6-6 GWA 4NEB 950 5060-02 7 Discriminating Module Section Topic Page 7.1 Description 7-2 7.2 Connections 7-3 7.3 Installation and Wiring 7-4 7.3.1 Setting the Address 7-4 7.3.2 Required Components 7-5 7.3.3 Installation 7-6 7.4 Commissioning 7-7 7.5 Messages 7-7 7.6 Dimension Drawing 7-8 7.7 Technical Specifications 7-9 ECOFAST System Manual GWA 4NEB 950 5060-02 7-1 Discriminating Module 7.1 Description Tasks of the discriminating module The discriminating module performs the following tasks in the ECOFAST system: * protecting the line when the cross-section is reduced * expanding the system with the same or a smaller line cross-section * switching off part of the system selectively in the event of an overload or short circuit * disconnecting part of the system and securing this operating status with padlocks Set-up The discriminating module comprises a circuit-breaker, mains switch, and alarm switch. The discriminating module has the following connections: * Han Q8 pin for supplying the power * Han Q8 socket for conducting the power * AS-Interface to enable the yellow AS-Interface profile line to communicate Han Q8 pin AS-i nterface AS-Interface Profile line Han Q8 socket Fig. 7-1: Set-up of the discriminating module Device versions Discriminating modules are available in three different device versions: Device version Current Order number 1 25 A 3RK1 911-4AA25 2 16 A 3RK1 911-4AA16 3 8A 3RK1 911-4AA08 Table 7-1: Discriminating module versions ECOFAST System Manual 7-2 GWA 4NEB 950 5060-02 Discriminating Module 7.2 Connections Power Input: Output: Han Q8/0 pin Han Q8/0 socket Pin assignment acc. to DESINA: Pin Assignment Comment 1 Neutral conductor N Looped through 2 Phase L2 Switched 3 -- -- 4 Brake 24 V DC Looped through 5 Brake 0 V DC Looped through 6 Phase L3 Switched 7 -- -- 8 Phase L1 Switched 9 PE, ground Looped through Table 7-2: Pin assignment of the Han Q8 pin/socket Communication AS-Interface for the yellow AS-Interface profile line. ECOFAST System Manual GWA 4NEB 950 5060-02 7-3 Discriminating Module 7.3 Installation and Wiring 7.3.1 Setting the Address AS-i slave profile Discriminating module Order no. 3RK1 911-4AA.. I/O ID code (hex) configuration (hex) 0 F ID1 code (hex) F ID2 code (hex) F Table 7-3: AS-i slave profile Prerequisites To set the address, you need - among other things - the addressing and diagnostic unit (order no.: 3RK1904-2AB00). Addresses 1 to 31 are valid addresses. Each address can only be assigned once. Note The address of the discriminating module can only be changed 15 times. If you attempt to set the address a sixteenth time, the last valid address will remain set. ECOFAST System Manual 7-4 GWA 4NEB 950 5060-02 Discriminating Module 7.3.2 Required Components The table below lists the required components: Item Ordering data Order number 1 Discriminating module 3RK1 911-4AA.. depending on the version 2 2 fixing screws (dia. 4 mm), if necessary nuts, spring washers, plain washers 3 Power line with Han Q8 socket (discriminating module at input) prefabricated or prepared by customer 3RK1 911-0.. depending on the length and crosssection 4 Power line with Han Q8 pin (discriminating module at output) prefabricated or prepared by customer 3RK1 911-0.. depending on the length and crosssection 5 Optional: Yellow AS-Interface profile line for communication 3RX9 0.... depending on the length and material 6 Optional: Line end covers for sealing open ends of lines (1 set = 10 pieces) 3RK1 901-1MN00 Table 7-4: Required components ECOFAST System Manual GWA 4NEB 950 5060-02 7-5 Discriminating Module 7.3.3 Installation Warning Hazardous electrical voltages! These may cause electric shock and burns. Disconnect the system and device from the power supply before starting work. Notice Refer to the information in the operating instructions. To install the discriminating module, carry out the following steps: 2 Choose a flat surface for installation. You can choose any mounting position. Drill 2 holes for the screws. 105 4 145 1 Description 250 Step 2x 3 4 Screw the discriminating module onto the flat surface. Optional: Connect the AS-Interface profile line to the discriminating module. Caution If the discriminating module is the last station in the AS-Interface line, you must seal the ends of the AS-i lines with line end covers (Order No. 3RK1 9011MN00) in order to achieve the IP67 degree of protection. Leave the ends of the lines protruding approximately 10 cm beyond the AS-Interface for this purpose. 3RK1 901-1MN00 AS-i 5 Connect the discriminating module to the power line with the Han Q8 pin (discriminating module at the output). Secure the connections with the locking devices. 6 Connect the discriminating module to the power line with the Han Q8 socket (discriminating module at the input). Secure the connections with the locking devices. Table 7-5: Installing the discriminating module ECOFAST System Manual 7-6 GWA 4NEB 950 5060-02 Discriminating Module 7.4 Commissioning To commission the discriminating module, and thus also the downstream power bus (sub-)segment, carry out the following steps: Step Activity 1 If you are using motor starters without a thermal motor model and with a motor supply lead (installation near motor), also observe the line protection guidelines in 8.5.6 on page 8-16. 2 Switch on the 400 V AC main power supply 3 Switch on the discriminating module Table 7-6: Sequence of steps for commissioning the discriminating module 7.5 Messages The following messages are transmitted via the AS-i field bus: Data bit Message Signal: [1]: HIGH [0]: LOW D0 Main circuit on [1]: Yes [0]: No D1 Tripped [1]: Yes [0]: No D2 -- D3 -- Table 7-7: Messages of the discriminating module ECOFAST System Manual GWA 4NEB 950 5060-02 7-7 Discriminating Module 7.6 Dimension Drawing 155 135 230 250 105 Fig. 7-2: Dimension drawing of the discriminating module ECOFAST System Manual 7-8 GWA 4NEB 950 5060-02 Discriminating Module 7.7 Technical Specifications Location On the system * Wall mounting * Mounted directly on the ECOFAST consumer *) Any Installation position Degree of protection IP65/67 Watertight acc. to IEC 529 (DIN 40050) Enclosure dimensions: HxWxD 205 x 105 x 140 Weight 1.5 kg Operating temperature -20 C to +40 C Storage/transport temperature -40 C to +80 C Vibration strain 5g Rated insulation voltage 500 V AC Locking device 3 padlocks Acc. to IEC 60 204-1 Standards, approvals IEC 69 947, IEC 60 204-1, DIN VDE 0627 UL 1977, CSA Table 7-8: Technical specifications of the discriminating module *) Not possible if ECOFAST motor starters are operated with PROFIBUS-DP ECOFAST System Manual GWA 4NEB 950 5060-02 7-9 Discriminating Module ECOFAST System Manual 7-10 GWA 4NEB 950 5060-02 8 Installation Guidelines Section Topic Page 8.1 Installation Guidelines for PROFIBUS-DPwith ECOFAST Hybrid Field Bus Cable 8-2 8.2 Installation Guidelines for PROFIBUS-DPwith DESINA Hybrid Field Bus Cable 8-3 8.3 Installation Guidelines for Standard PROFIBUS-DP Cables 8-6 8.3.1 Potential equalization 8-6 8.3.2 Cable Shielding 8-7 8.4 PNO Installation Guideline 8-9 8.5 Power Bus Installation Variants 8-10 8.5.1 Installation with Power Tee Connector and Power Cable (Prefabricated) 8-10 8.5.2 Installation with Power Tee Clamping Connector and Power Cable (Not Prefabricated) 8-11 8.5.3 Sub-Segments 8-12 8.5.4 ET 200X Sub-Segments with EM300 Motor Starter 8-13 ECOFAST System Manual GWA 4NEB 950 5060-02 8-1 Installation Guidelines 8.1 Installation Guidelines for PROFIBUS-DP with ECOFAST Hybrid Field Bus Cable ECOFAST hybrid field bus cable ECOFAST hybrid field bus cables are suitable for trailing. They are shielded with two copper cores for PROFIBUS-DP and four 1.5 mm2 copper cores for 24 V DC switched (DC24V-S) and 24 V DC non-switched (DC24V-NS). What is a bus segment? The PROFIBUS-DP consists of at least one bus segment. Each bus segment has at least two stations, of which at least one is a DP master. Maximum configuration of a bus segment A bus can consist of up to 32 stations, all physically connected by means of an ECOFAST hybrid field bus cable. You must connect the bus terminating connector at the start and end of the bus. Power & Control Module (P&CM) with - PLC 2 x 24 V DC - 2 x 24 V DC Supply - 400 V AC Main Power Supply 3~ Station 1 Terminating resistor connected internally or segment 2! Screw cap or segment 2 ECOFAST hybrid field bus cable 2 x 24 V DC and data Order numbers: 4FB2.. P&CM: 3RK1911-2AG00 Data tee plug connector: Bus terminating connector: 6GK1905-6DA00 Screw cap (cover plate): 6ES7194-1JB10-0XA0 ECOFAST hybrid field bus cable: 6XV1830-7BH15 (1,5 m) 6XV1830-7BH30 (3 m) 6XV1830-7BH50 (5 m) 6XV1830-7BN10 (10 m) 6XV1830-7BN15 (15 m) Bus terminating connector Power cable 3/PE-50/60 Hz; 400 V AC Data tee plug connector Segment 1 Station 2 Station 3 Station 4 Station 32 Segment 2 Station 33 Station 34 Station 35 Station 64 Fig. 8-1: Set-up of a bus segment with RS 485 ECOFAST System Manual 8-2 GWA 4NEB 950 5060-02 Installation Guidelines Key data of a bus segment The maximum line length of a bus segment depends on the baud rate that is used. Baud rate Max. line length of a segment [m] 9.6 to 187.5 kbaud 1000 500 kbaud 400 1.5 Mbaud 200 3 to 12 Mbaud 100 Table 8-1: Permissible line length of a bus segment as a function of the baud rate 8.2 Installation Guidelines for PROFIBUS-DP with DESINA Hybrid Field Bus Cable DESINA hybrid field bus cable DESINA hybrid field bus cables are suitable for trailing. They have two plastic optical-fiber conductors for PROFIBUS-DP and four 1.5 mm 2 copper cores for 24 V DC switched (DC24V-S) and 24 V DC non-switched (DC24VNS). Connection to PROFIBUS-DP If you want to bridge long distances with the field bus regardless of the baud rate, or if disturbance fields must not be allowed to interfere with data traffic on the bus, you should use optical-fiber cables instead of copper cables. The PROFIBUS-DP stations are connected to the PROFIBUS-DP by means of * separate data tee plug connectors with optical-fiber cables (PROFIBUS-DP LWL) * integrated plug connectors, e.g. ET 200X base module BM143 Advantages and applications Optical-fiber cables have the following advantages compared to electrical conductors: * electrical isolation of the PROFIBUS-DP components * insensitivity to electromagnetic interference (EMC) * no electromagnetic radiation into the environment * additional grounding and shielding measures can consequently be dispensed with * no need to comply with minimum distances from other lines on account of EMC * no need for equipotential bonding jumpers * no need for lightning protection elements * maximum permissible line lengths are no longer dependent on the baud rate ECOFAST System Manual GWA 4NEB 950 5060-02 8-3 Installation Guidelines Optical PROFIBUS-DP network with line topology The optical PROFIBUS-DP network is designed with a line topology. The PROFIBUS-DP stations are connected together in pairs by means of DESINA hybrid field bus cables. If one PROFIBUS-DP station fails, the line topology means that all downstream DP slaves are no longer accessible to the DP master. Faults can thus be localized easily. Power & Control Module (P&CM) with - PLC 2 x 24 V DC - 2 x 24 V DC supply - 400 V AC main power supply 3~ Station 1 Screw cap or segment 2 Order numbers: 4AV9.. P&CM: 3RK1911-2AH00 Data tee plug connector: Screw cap (cover plate): 6ES7194-1JB10-0XA0 ECOFAST hybrid field bus cable: 6XV1830-6DH15 (1,5 m) 6XV1830-6DH30 (3 m) 6XV1830-6DH50 (5 m) 6XV1830-6DN10 (10 m) 6XV1830-6DN15 (15 m) DESINA hybrid field bus cable 2 x 24 V DC and data Power cable 3/PE-50/60 Hz; 400 V AC Screw cap Data tee plug connector Segment 1 Station 2 Station 3 Station 4 Station 32 Segment 2 Station 33 Station 34 Station 35 Station 64 Fig. 8-2: Optical PROFIBUS-DP network with line topology ECOFAST System Manual 8-4 GWA 4NEB 950 5060-02 Installation Guidelines Baud rate The optical PROFIBUS-DP network with a line topology can be operated with the following baud rates: 9.6 kbaud, 19.2 kbaud, 45.45 kbaud, 93.75 kbaud, 187.5 kbaud, 500 kbaud, 1.5 Mbaud and 12 Mbaud. Line lengths If optical-fiber cables are used, the length of the transmission link is independent of the baud rate. Every PROFIBUS-DP station connected to the optical PROFIBUS-DP network has a repeater functionality. The distances specified below therefore refer to the distance between two neighboring PROFIBUS-DP stations in the line topology. The maximum line length between two PROFIBUS-DP stations is dependent on the type of optical-fiber cable that is used. Optical-fiber cable DESINA hybrid field bus cable Max. line length between 2 stations [m] Projection to 1 network (= 32 stations) [m] 50 1550 Table 8-2: Permissible line lengths in the optical PROFIBUS-DP network ECOFAST System Manual GWA 4NEB 950 5060-02 8-5 Installation Guidelines 8.3 Guidelines for PROFIBUS-DP standard cables 8.3.1 Potential equalization When do differences in potential occur? Differences in potential can occur, for example, when different mains supplies are used. Damage may be caused to the system as a result of potential differences between various system parts if: * programmable controllers and inputs/outputs are connected by potentialbonded couplings, or * cable shields are connected at both ends and grounded to different parts of a system. Avoiding potential differences It is important to install potential equalization lines in order to minimize potential differences and ensure the functionality of the electronic components. When and why do you need potential equalization? Potential equalization has the following advantages: * Devices with a grounded interface may be destroyed as a result of potential differences. * The shielding of the PROFIBUS cable must not be used for potential equalization. This is the case, however, with any parts of the system that are linked together via the cable shield, but connected to different grounding points. * Potential equalization is a precondition of lightning protection. Rules for potential equalization Note the following points: * The smaller the impedance of the potential equalization line, the higher the efficiency of potential equalization. * If shielded signal cables are installed between certain parts of the system and connected at both ends to ground/protective conductors, it is important to ensure that the impedance of the additional potential equalization line is not in excess of 10% of the shield impedance. * Use connectors with large contact areas to connect the potential equalization conductors to the ground/protective conductor. * Protect the potential equalization conductors against corrosion. * Use potential equalization conductors made of copper or galvanized steel. * Route the potential equalization conductors in such a way that the areas bounded by the potential conductor and the signal lines are as small as possible. * Use equipotential bonding conductors made of copper or galvanized steel. ECOFAST System Manual 8-6 GWA 4NEB 950 5060-02 Installation Guidelines Note Equipotental bonding conductors are not necessary if the parts of the system are connected to each other exclusively by means of fiber-optic cables. 8.3.2 Cable Shielding Definition Shielding is a means of weakening (attenuating) magnetic, electric and electromagnetic interference fields. Interference currents on cable shields are diverted to ground via the shield busbar, which forms a conductive connection with the housing. It is particularly important to ensure a low-ohmic connection to the protective conductor, as otherwise the interference currents themselves may become a source of interference. Measures for cable shielding Note the following points: * If possible, use only cables with braided shields. The shield density should be more than 80%. Avoid using cables with foil shielding, because tensile and compressive loads at the attachments can easily damage the foil. The result is a reduction in shield efficiency. * Always connect the cable shields at both ends. It is only when the shielding is connected at both ends that interference suppression is effective at the high end of the frequency range. Exceptions: It may be better to connect the shield at one end only, if - for some reason it is not possible to install potential equalization lines, - analog signals (in the low mV or u A range) are transmitted, or - foil shielding (static shields) is used. Note, however, that if the shield is connected at one end only it can suppress only low-frequency interference. * Connect the shield of the data line to the plug body. * If the system is installed for stationary operation, it is advisable to remove the insulation from the shielded cable without interruption and connect the cable to the shielding/protective conductor busbar. Note If a potential difference occurs between the grounding points, an equalization current can flow through a shield connected at both ends. In this case, install an additional potential equalization line. ECOFAST System Manual GWA 4NEB 950 5060-02 8-7 Installation Guidelines 8.5.3 Sub-Segments Installation With sub-segments, the consumers (not ET200X with EM 300 motor starter) are connected to the power bus using a sub-segment cable and a power tee clamping connector or power tee connector. The sub-segment cable can be ordered prefabricated. Diagram Power tee clamping connector with Han Q8/0 socket Sub-segment cable (prefabricated) Power tee connector Sub-segment cable (prefabricated) EM 148-FC ET 200X Bild 8-6: Sub-segment configuration Caution ET 200X sub-segments fitted with EM148-FC frequency converters only must be used here (see diagram). ECOFAST System Manual 8-12 GWA 4NEB 950 5060-02 Installation Guidelines 8.4 PNO Installation Guideline PNO installation guideline Please comply with the PROFIBUS-DP/FMS Installation Guideline of the PROFIBUS-Nutzerorganistation (user organization) when using electrical networks. It describes important measures to be taken as regards the wiring, cabling and commissioning of PROFIBUS networks. Publisher PROFIBUS-Nutzerorganisation e. V. Haid-und-Neu-Strae 7 D-76131 Karlsruhe Tel: ++49 721 / 9658 590 Fax: ++49 721 / 9658 589 Internet: http//www.profibus.com Guideline order number: 2.111 ECOFAST System Manual GWA 4NEB 950 5060-02 8-9 Installation Guidelines 8.5 Power Bus Installation Variants 8.5.1 Installation with Power Tee Connector and Power Cable (Prefabricated) Installation With this variant, the consumers are connected to the power bus using power tee connectors. The power cables can be: * Ordered prefabricated with different configurations and lengths * Prepared by the customer himself. The power cables can be either plugged in to the power tee connector or connected directly to the last consumer on the power bus. Benefits * Quicker connection (plug and play), no wiring * No risk of wiring errors with prefabricated power cables Diagram PCM Supply Main power Power tee connector with Han Q8 socket for consumer Power cable (prefabricated or prepared by customer) Possible components: Prefabricated with Han Q8/0 pin and power tee connector Prefabricated with Han Q8/0 pin and Han Q8/0 socket Bild 8-4: Installation with power tee connector and power cable (prefabricated) ECOFAST System Manual 8-10 GWA 4NEB 950 5060-02 Installation Guidelines 8.5.2 Installation with Power Tee Clamping Connector and Power Cable (Not Prefabricated) Installation With this variant, the consumers are connected to the power bus using power tee clamping connectors. The power cable is routed through the system in one piece. In the configuration shown in the diagram below, you merely have to prepare a Han Q8 connector set at the beginning and end of the power cable. Benefits * In principle, any cable with a diameter of between 10 mm and 22 mm can be used in accordance with requirements. * The power tee clamping connector can be connected at any point. Diagram PCM Supply Main power Power tee clamping connector with Han Q8/0 socket for consumer Power cable (sold by the meter) Possible components: Connector set with pins for connecting the PCM Power cable (sold by the meter) Power tee clamping connector Suitable seals Connector set with sockets for connecting the last consumer Bild 8-5: Configuration with power tee clamping connector ECOFAST System Manual GWA 4NEB 950 5060-02 8-11 Installation Guidelines 8.5.3 Sub-Segments Installation With sub-segments, the consumers (not ET200X with EM 300 motor starter) are connected to the power bus using a sub-segment cable and a power tee clamping connector or power tee connector. The sub-segment cable can be ordered prefabricated. Diagram Power tee clamping connector with Han Q8/0 socket Sub-segment cable (prefabricated) Power tee connector Sub-segment cable (prefabricated) EM 148-FC ET 200X Bild 8-6: Sub-segment configuration CautionET 200X sub-segments fitted with EM 148-FC frequency converters only must be used here (see diagram). ECOFAST System Manual 8-12 GWA 4NEB 950 5060-02 Installation Guidelines 8.5.4 ET 200X Sub-Segments with EM300 Motor Starter Installation With ET 200X sub-segments with the EM300 motor starter, an ET 200X is connected to the power bus using an ET 200X sub-segment cable and a power tee clamping connector or power tee connector. The ET 200X sub-segment cable can be ordered prefabricated. Diagram Power tee clamping connector with Han Q8/0 socket Power tee connector Power bus EM300 ET 200X sub-segment cable (prefabricated) EM300 EM148-FC Bild 8-7: Sub-segment configuration Caution The ET 200X sub-segment cable must only be used for ET 200X sub-segments that are equipped with at least one EM300 motor starter. The ET 200X sub-segment cable features a phase displacement for connecting the EM300 motor starters to the power bus. The motor starters are always connected to the power bus. ECOFAST System Manual GWA 4NEB 950 5060-02 8-13 Installation Guidelines Guidelines for the ET 200X Sub-Segment Distributed ET 200X peripheral devices can be integrated in the ECOFAST system. The following rules, however, must be followed: * An ET 200X sub-segment comprises the ET 200X sub-segment cable and a distributed ET 200X peripheral device with at least one feeder. * A maximum of 6 motor starters or frequency converters can be used in one ET 200X sub-segment. * Motor starters must be installed on the base module upstream of frequency convertors (see diagram). * The EM300 motor starters are connected to the motor with a prefabricated line (line type: ET 200X motor). * The EM148-FC frequency converters are connected to the motor with a prefabricated line (line type: ET 200X FU motor). * The prefabricated ET 200X power cables must be used for connecting the ET 200X sub-segment to the power bus and for transferring the power. Caution The ET 200X sub-segment cable and the power cable for transferring the power are different. They must only be used for their intended purpose. ECOFAST System Manual 8-14 GWA 4NEB 950 5060-02 Installation Guidelines 8.5.5 Possible power distribution with discriminating modules Diagram The diagram below shows the possible power distribution arrangements with discriminating modules: Power cable 3/PE-50/60 Hz 400 V AC ECOFAST Consumer ECOFAST Consumer Discriminating module Input: Han Q8/0 pin 1 2 3 ECOFAST Consumer Output: Han Q8/0 socket 4 ECOFAST Consumer Bild 8-8: Possible power distribution with discriminating modules 1 ECOFAST consumer without a discriminating module directly in the power bus segment backbone. 2 The ECOFAST consumer and the discriminating module form a power bus sub-segment. They are connected to the power cable using the Han Q8/0 pin/socket. The discriminating module connects the power bus subsegment to the power bus segment backbone. 3 The ECOFAST consumer and the discriminating module form a power bus sub-segment. They are connected directly without a cable. The power cable with the Han Q8/0 pin/socket connects the power bus subsegment to the power bus segment backbone. Caution The discriminating module cannot be connected without a cable if ECOFAST motor starters are operated with the PROFIBUS-DP field bus. ECOFAST System Manual GWA 4NEB 950 5060-02 8-15 Installation Guidelines 8.5.6 Line Protection in Power Bus Segment for Motor Starters Without Thermal Motor Model (Installation Near Motor) Diagram The power bus segment to be protected contains motor feeders with: * Motor starters that only have motor protection with a temperature sensor, and * Motors with motor supply leads (installation near motor). The motor supply lead is not protected by the motor starter. In this case, the maximum permissible current-carrying capacity of the motor supply lead must be set on the next upstream protection module: * Variant A: discriminating module, circuit-breaker * Variant B: PCM, circuit-breaker F1. The following diagram shows the set-up: Variant A Power cable 3/PE-50/60 Hz 400 V AC Motor Motor supply lead Motor starter Motor protection: Temperature sensor Discriminating module No thermal motor model No full motor protection Variant B PCM Motor Supply Main power Motor supply lead Motor starter Motor protection: Temperature sensor No thermal motor model No full motor protection Bild 8-9: Line protection for motor starters without thermal motor model ECOFAST System Manual 8-16 GWA 4NEB 950 5060-02 Installation Guidelines Example Motor starter used: Motor supply lead: Laying type: Setting value: Variant A: opened ECOFAST motor starter Order no.: 3RK1323-2AS51-1AA3 1.5 mm2 (Max. current-carrying capacity: 18.5 A) E (Reduction factor: 0.650 at 30C ) 12 A. 16 A and 25 A discriminating modules must be so that they can be set. The 8 A discriminating module limits the current to 8 A (nothing is set). Variant B: The PCM must be opened so that it can be set. ECOFAST System Manual GWA 4NEB 950 5060-02 8-17 Installation Guidelines ECOFAST System Manual 8-18 GWA 4NEB 950 5060-02 9 Wiring and Interfaces Section Topic Page 9.1 Securing Plug in Connections that are not Safe Against Finger Touch When Using Frequency Converters 9-3 9.2 Wiring Rules 9-4 9.2.1 Selecting the power leads 9-4 9.2.2 Unused Connections 9-5 9.3 Power Cables Prefabricated at One End 9-6 9.3.1 Power Cables Prefabricated at One End with Han Q8 Pin 9-6 9.3.2 Motor Supply Leads Prefabricated at One End with Han 10E Pin 9-7 9.3.3 Prefabricating Power Cables 9-8 9.4 AS Interface 9-10 9.4.1 Connection Techniques 9-10 ECOFAST System Manual GWA 4NEB 950 5060-02 9-1 Wiring and Interfaces Warning Hazardous voltages! These may cause electric shock and burns. Disconnect the system and device from the supply before starting work. Danger Ensure that the wiring is carried out carefully and correctly. Otherwise motor starters may be destroyed. There is potentially lethal danger! ECOFAST System Manual 9-2 GWA 4NEB 950 5060-02 Wiring and Interfaces 9.1 Securing Plug in Connections that are not Safe Against Finger Touch When Using Frequency Converters Danger Hazardous voltage caused by frequency converters! Discharge time: 5 minutes Protect plug connection after locking with enclosed cable fastener against unauthorized access! The Capacitors of the frequency converter DC Link and EMC Filter remain charged for a period of 5 minutes after switching off of the power supply. During this period, DO NOT disconnect the frequency converter power connector, as there is a danger of electric shock from contact with the connector pins. The power connectors must therefore be interlocked to prevent inadvertent disconnection and contact with the connector pins. If the frequency converter is used in systems incorporating multiple connectors, it must also be ensured that ALL connector positions are protected against inadvertent disconnection and contact and hold a label warning of transmission of dangerous voltages across the power cable network. Securing the plug-in connections Secure the plug-in connections as shown in the diagram below: Cable ties Locking devices Fig. 9-1: Securing the plug-in connections against unauthorized access Cable ties are enclosed with all prefabricated power cables and a warning label is affixed to the connectors. Note on power cables prepared by the customer Note Please note that you must also secure the plug-in connections of customerprepared power cables in an appropriate way! Cable ties and warning labels are not included in the delivery package of individual power connectors! ECOFAST System Manual GWA 4NEB 950 5060-02 9-3 Wiring and Interfaces 9.2 Wiring Rules Warning Hazardous voltages! These may cause electric shock and burns. Disconnect the system and device from the supply before starting work. 9.2.1 Selecting the power leads The core cross-section of the power leads must be matched to the respective ambient conditions. The decisive factors for choosing the core crosssection are as follows: * set current on the device * method of installation * ambient temperature * type of material (PVC, rubber) For PVC power leads installed in a cable duct, for example, the maximum current carrying capacity as a function of ambient temperature is as follows: O TU 30 C 40 C 45 C 50 C 55 C 1,5 mm2 14 A 12.2 A 11.1 A 9.9 A 8.5 A 2,5 mm2 19 A 16.5 A 15.0 A 13.5 A 11.6 A 4,0 mm2 26 A 22.6 A 20.5 A 18.5 A 15.9 A Observe the following rules when carrying out wiring: Rules for flexible cables Data Current carrying capacity of the plug connection as a function of the connectable core cross-sections and ambient temperature Tu = 55 C 40 C 1,5 mm 2,5 mm2 4,0 mm2 12 A 20 A 30 A 15 A 25 A 35 A green red white 7.0 ... 10.5 mm 9.0 ... 13.0 mm 11.5 ... 15.5 mm 2 Permissible outer diameter of the cable sealing insert Length of insulation to strip from cores 8 mm Length of insulation to strip from cable sheath 20 mm Table 9-1: Rules for wiring ECOFAST System Manual 9-4 GWA 4NEB 950 5060-02 Wiring and Interfaces 9.2.2 Unused Connections Close off unused connections with screw caps; this is the only way of ensuring degree of protection IP65. Order number 3 RK1 902-0CJ00 (10 screw caps) or 3 RK1 902-0CK00 (1 screw cap). ECOFAST System Manual GWA 4NEB 950 5060-02 9-5 Wiring and Interfaces 9.3 Power Cables Prefabricated at One End Description Power cables prefabricated at one end are available in different lengths (see appendix for order numbers). One end of the cable is fitted with a power plug connector with pins. The other end is free. Here, you can strip the cores and, for example, attach a plug connector or terminal block. Numbers are printed on the cores for identification purposes. The core number/pin assignments are specified in the following two sections. Fig. 9-2: Numbers printed on the power cable cores 9.3.1 Power Cables Prefabricated at One End with Han Q8 Pin Pin Core no. Assignment 1 1 Neutral N 2 3 Phase L2 3 -- -- 4 5 Brake 5 6 Brake (reference potential) 6 4 Phase L3 7 -- -- 8 2 Phase L1 PE (yellow/green) Fig. 9-3: Power cables prefabricated at one end with Han Q8 pin ECOFAST System Manual 9-6 GWA 4NEB 950 5060-02 Wiring and Interfaces 9.3.2 Power Cables Prefabricated at One End with Han 10E Pin Pin Core no. Core no. (7-core) (11-core) Assignment 1 1 1 Phase L1 2 2 2 Phase L2 3 3 3 Phase L3 4 -- 4 Brake (reference potential) 5 -- 5 Brake 6 4 6 Winding terminal W2 7 5 7 Winding terminal U2 8 6 8 Winding terminal V2 9 -- 9 Temperature sensor (terminal a) 10 -- 10 Temperature sensor (terminal b) PE (yellow/green) Fig. 9-4: Motor supply leads prefabricated at one end with Han 10E pin Caution Shielded motor supply leads must be used for frequency converters. ECOFAST System Manual GWA 4NEB 950 5060-02 9-7 Wiring and Interfaces 9.3.3 Prefabricating Power Cables Accessories When you are preparing power cables, you need a crimping tool (soldering is possible as an alternative) and the accessories listed in the table. Power cables with Han Q8/0 You need ... for connecting the main power on the motor starter/ power tee connector: for looping through the main power from the power tee connector: A flexible Cu cable 4 x 2.5 mm 2/4 mm 2 (3 conductors + PE) 6 x 2.5 mm 2/4 mm 2 (3 conductors + PE + brake) Power connector Han Q8 socket Power connector Han Q8 pin * 2.5 mm2: 3RK1 902-0CA00 * 4.0 mm2: 3RK1 902-0CB00 * 2.5 mm2: 3RK1 902-0CC00 * 4.0 mm2: 3RK1 902-0CD00 Table 9-2: Preparing connecting leads with Han Q8 ECOFAST System Manual 9-8 GWA 4NEB 950 5060-02 Wiring and Interfaces Han Q8/0 power connectors The power connectors belonging to a power tee connector and to the motor starter consist of the following components: Han Q8/0 socket for connecting the main power Han Q8/0 pin for looping through the main power Connector housing Connector housing Jacks Contact pins Socket insert Pin insert Fig. 9-5: Han Q8 power connector Assembling and wiring power connectors Assemble and wire the power connectors according to the following instructions: Step Procedure 1 Guide the cable through the heavy-gauge threaded joint, the matching enclosed sealing ring in each case and the connector housing. 2 Attach the jacks/contact pins to the strands 3 Push the jacks/contact pins into the socket insert/pin insert until they snap into place. 4 Pull the cable back and screw the insert in place in the connector housing with the enclosed screws. 5 Screw the heavy-gauge threaded joint tight. Table 9-3: Assembling and wiring power connectors ECOFAST System Manual GWA 4NEB 950 5060-02 9-9 Wiring and Interfaces 9.4 AS Interface 9.4.1 Connection Techniques The following AS-i cables are used: * Yellow AS-i cable for AS-i communication and non-switched 24 V DC auxiliary power for supplying sensors and electronics * Black AUX PWR AS-i cable for switched 24 V DC auxiliary power for supplying actuators Schematic arrangement The diagram below shows the position and coding of the AS-i cables on the motor starter: Motor starter AS-i cable AS-i cover AS-i Communication and non-switched auxiliary power Switched auxiliary power AS-i (+) R AUX PW AS-i (-) AUX PWR (+) AUX PWR (-) Han Q8 main power feed Fig. 9-6: AS interface Contacting The AS-i cables are contacted automatically using the insulation piercing method when the AS-i cover is screwed on. AS-i cover AUX PWR AS-i Fig. 9-7: Contacting the AS-i cables ECOFAST System Manual 9-10 GWA 4NEB 950 5060-02 Wiring and Interfaces 24 V DC voltage supply (AS-i) non-switched (yellow AS-i cable) This voltage is constantly available. It is required for: * supplying the electronics in the motor starter * interrogating the auxiliary contacts The voltage is not disconnected in the event of an emergency stop or safety shutdown, thereby ensuring that the system can always communicate with the ECOFAST component. 24 V DC voltage supply (AUX PWR) switched (black AS-i cable) This voltage is not constantly available. It is only required for: * driving the switching elements, e.g. a contactor The voltage can be disconnected in the event of an emergency stop or safety shutdown (category 1 according to EN 954-1), so that all switching elements are safely disconnected with the connected motors. Response to undervoltage (24 V DC < 18.5 V) and power failure: * In the event of prolonged undervoltage or power failure > 20 ms, the switching elements and the brake output are disconnected. * When the supply is restored, the disconnection command and the associated signal bits and error bits are acknowledged automatically. ECOFAST System Manual GWA 4NEB 950 5060-02 9-11 Wiring and Interfaces ECOFAST System Manual 9-12 GWA 4NEB 950 5060-02 A Questions and Answers Section A.1 Topic Frequently asked Questions Page A-2 ECOFAST System Manual GWA 4NEB 950 5060-02 A-1 Questions and Answers A.1 No. Frequently Asked Questions Question Answer 1 Is ECOFAST the DESINA system from Siemens? No ECOFAST is based on interfaces standardized by DESINA. ECOFAST goes beyond the DESINA specification, however, e.g. ECOFAST also includes Cu transmission technology for PROFIBUS-DP and takes account of AS-Interface. In addition, ECOFAST can optionally be supplied with special configuring software. 2 Can components from other manufacturers also be integrated in ECOFAST? Yes ECOFAST is designed as an open system. ECOFAST is based on open bus systems (PROFIBUS-DP, AS-Interface), and its interfaces (connections) are both standardized and open (in accordance with DESINA). Any manufacturer offering devices that comply with these specifications can thus easily be integrated in an ECOFAST system. 3 Can connectors from other manufacturers be used as well? Yes ECOFAST is an open system with standardized interfaces. Siemens currently cooperates with Harting as a connector manufacturer and supplier on connection techniques. Other connectors and cables from other manufacturers can however also be used at any time, providing their design and their pin assignment can be adapted to the specification (DESINA). Non-Siemens products can also be integrated in ECOFAST ES. 4 Can SIMOCODE be integrated? Yes SIMOCODE must be installed in a local switchbox. It is integrated in ECOFAST by means of the switch cabinet throughfeeds (hybrid field bus connections) If the maximum permissible current of the power bus (40 A) is exceeded, this feeder must be started separately on the power side. 5 Is ECOFAST suitable for sub-zero temperatures (outdoor applications, cold stores)? No ECOFAST is designed for ambient temperatures between 0 and 60 degrees Celsius. 6 Can ECOFAST be used in potentially explosive areas? No ECOFAST is not designed for use in potentially explosive areas. ECOFAST System Manual A-2 GWA 4NEB 950 5060-02 Questions and Answers 7 How is the PLC integrated in ECOFAST? The power & control module can optionally be supplied with an integrated PLC for ECOFAST. The S7 315-2 DP is planned in the first stage. The PLC can of course also be accommodated in a conventional switch cabinet. In this case it is integrated into the system by means of switch cabinet throughfeeds (hybrid field bus connections). 8 Are frequency converters available for ECOFAST? Yes A frequency converter up to 750 W is available in conjunction with the ET 200X and a standalone ECOFAST converter is planned for mid-2003. Like the ECOFAST starter, it will be integrated in the motor and it will also be possible to install it near the motor (e.g. Combimaster with ECOFAST connection method). 9 If ECOFAST is based on DESINA, how can it be connected to a SINUMERIK? It is connected by means of the switch cabinet throughfeeds (hybrid field bus connections), i.e. the switch cabinet can be factory-wired (interface to SINUMERIK) and the peripheral devices (I/Os and starter) are then connected externally. 10 If ECOFAST is based on DESINA, does this mean that it is only designed for machine tools? No Machine tools are only one target industry. Since DESINA pursues the same objective of cutting overall costs and has already standardized interfaces, we decided to use it as a basis for ECOFAST. ECOFAST is more versatile than DESINA, however, being designed for use across industry boundaries. Conveyor systems and production machines are among our other target markets. 11 What about the safety technology interface via bus systems (Profisafe, Safety at work)? Emergency stop circuits can be connected to the power & control module. The AS-I motor for Safety at work can also be installed in this module. Safety-oriented (two-channel) modules are required to transmit safety-oriented signals via Profibus-DP. They will be integrated depending on availability (e.g. in the ET 200X). We are unable to provide a definite date at the present time. Compatible with Safety/Profisafe. 12 Can components with the IP20 degree of protection (e.g. SIMOCODE or ET 200S) also be integrated into ECOFAST? Yes These components can also be connected to ECOFAST. The switchbox can be factory-wired with plug-in switch cabinet throughfeeds (hybrid field bus connections). The switchbox can be factory-wired on the inside; the plug-in connections are located on the outside. Integration into the complete system is thus very straightforward. 13 How can the bus and the power supplies (24 V auxiliary voltages) be combined in the hybrid cable? The bus (PROFIBUS-DP) and the 24 V power supplies are combined by means of the hybrid field bus connections (switch cabinet throughfeeds). These are available in several different versions (for copper, optical fiber, active and passive), in other words no additional terminal blocks are required in the cabinet or the switchbox. ECOFAST System Manual GWA 4NEB 950 5060-02 A-3 Questions and Answers 14 How can an OP be integrated for visualization purposes? OPs are normally designed with the IP20 degree of protection and are therefore installed either in a cabinet or in a local box. They can be integrated in an ECOFAST system by means of the switch cabinet throughfeeds (hybrid field bus connections) 15 How many feeders fit into one segment? This depends on the power of the connected feeders/ motors. ECOFAST installations are not star-shaped but linear ("power bus"). Up to 40 A (approx. 14 kW) is possible per segment or connection, depending on the type of laying and the ambient temperature. When this value is reached, a new segment must be opened. The ECOFAST ES configuration tool calculates and checks the power-engineering design. 16 How can switching devices with a higher power than ECOFAST starters (4 kW) be integrated? Switching devices of this kind can be integrated in local boxes as IP20 components by means of the switch cabinet throughfeeds (hybrid field bus connections). If the maximum permissible current of the "power bus" (40 A) is exceeded, this feeder must be started separately on the power side. 17 Is a repair switch provided? Do the starters have a repair switch? There is a lockable repair switch on the power & control module, in other words the connected segment is disconnected. The starters themselves are not fitted with a repair switch. A lockable variant is planned for the connector on the motors (discriminating module in preparation). The discriminating module can be used as a repair switch. 18 How can a system built with ECOFAST be extended? Very easily. The communication and power components are simply hooked onto the PROFIBUS or the power bus. The communication components must of course be configured with STEP7 or COM PROFIBUS (software integration). The power components can be integrated and tested with ECOFAST ES. The wiring can be reoptimized, or the existing wiring tested and documented, taking account of the newly connected consumer. 19 What is the maximum power allowed for the electronic starter (soft starter)? Soft starters in output classes of up to 1.1 kW and of up to 5.5 kW can be supplied. ECOFAST System Manual A-4 GWA 4NEB 950 5060-02 Questions and Answers 20 Is ECOFAST UL-listed? The individual components (devices) of ECOFAST are ULlisted. As far as ECOFAST's UL listing as a complete system is concerned, we are still negotiating with the responsible bodies, because the handling of acceptances and certifications for complete systems varies considerably from one system to another. Importance is attached, for instance, to the definition of a self-contained unit (complete machine or system?). The same applies to the cable laying types (the cables do not necessarily have to be "piped" in self-contained units), for example in concatenated units. 21 Is a metal version of the connectors also available? Only molded-plastic versions of the bus and power connectors are available at present. Metal versions of motor feeder connectors are also available (for FUs, due to shielded motor line). Metal versions of the plug cases can be requested from Harting. 22 What is the situation regarding Ethernet communication? The ECOFAST communication philosophy is based on Profibus-DP and AS-Interface. With regard to Ethernet, a considerable amount of work still needs to be invested in industry-standard connection methods. The ECOFAST devices, such as ECOFAST starters, have a modular internal set-up, so that additional bus interfaces can be implemented easily as and when necessary (which is not the case with Ethernet). 23 Is it true that ECOFAST starters compete with the starters of the ET 200X? No Different ECOFAST solutions are offered intentionally, to facilitate maximum adaptability to each particular application. The following solutions are possible: * Standalone starters (1 starter = 1 bus station) for branch drives * Isolated solutions (ET 200X) for drives that are physically close together * Installation near the motor * Integration in the motor (starter on motor) 24 Is ECOFAST very expensive? Although the connector technique is slightly more expensive than simple terminals, it is important to consider the overall costs of ECOFAST, namely both material and installation costs. The potential savings concern the costs of installation and - from the point of view of the end customer - servicing. If only the hardware costs of the components are considered, the calculation is misleading. ECOFAST System Manual GWA 4NEB 950 5060-02 A-5 Questions and Answers ECOFAST System Manual A-6 GWA 4NEB 950 5060-02 B ECOFAST Pilot Projects Section Topic Page 7.1 Production line for SIRIUS 2 - Siemens Cham 7-2 7.2 Configuration in the Automotive Industry - Production Planning 7-7 7.2.1 Configuration with ECOFAST ES 7-8 ECOFAST System Manual GWA 4NEB 950 5060-02 B-1 ECOFAST Pilot Projects B.1 Production line for SIRIUS 2 - Siemens Cham SIRIUS 2: Production planning Location: Siemens Cham Application: Production line for SIRIUS 3RT contactors Task: Conveyor system with 5 autonomous cells for screwing, testing, inscribing and repairing Power & control module with S7-300 PLC, PROFIBUS-DP and AS-i Total of 21 motor starters for 0.18 and 0.3 kW motors To replace central drive systems with distributed peripheral devices in an installation system with diagnostics-capable motor starters and prefabricated connections. Set-up: Objective: Power Modul Power & & Control Control Module HybridKabel cable PROFIBUS-DP ECOFAST Hybrid Energieleitung Conveyor section 1 Bandstrecke 2 Conveyor section 2 Bandstrecke 3 Conveyor section 3 Bandstrecke 4 Fig. B-1: SIRIUS 2 pilot system - production ECOFAST System Manual B-2 GWA 4NEB 950 5060-02 ECOFAST Pilot Projects SIRIUS 2 pilot system: Configuration with ECOFAST ES Fig. B-2: SIRIUS 2 pilot system - configuration with ECOFAST ES ECOFAST System Manual GWA 4NEB 950 5060-02 B-3 ECOFAST Pilot Projects Production Fig. B-3: SIRIUS 2 pilot system - production ECOFAST System Manual B-4 GWA 4NEB 950 5060-02 ECOFAST Pilot Projects B.2 Configuration in the Automotive Industry - Production Planning Production planning Application: Production of wheel hubs Task: Conveyor system with 4 cells Set-up: Power & control module with S7-300 PLC, PROFIBUS-DP, AS-interface and AS-interface monitor (Safety at work) Total of 6 motor starters for motors with 0.55 KW To replace centrally controlled drive technology with a distributed installation system. To integrate pneumatics and EMERGENCY STOP functionality in a single system technology. Objective: ECOFAST System Manual GWA 4NEB 950 5060-02 B-5 ECOFAST Pilot Projects 2.2.1 Configuration with ECOFAST ES Fig. B-4: Configuration with ECOFAST ES ECOFAST System Manual B-6 GWA 4NEB 950 5060-02 C Order numbers Section Topic Page C.1 Motor Starters (Reversing starters) C-2 C.2 Motor Connection Cables and Power Cables C-3 C.3 Power & Control Modules (Infeed Modules) C-5 C.4 Discrimination Modules C-6 C.5 Hybrid Fieldbus Cables C-6 C.6 AS-Interface Shaped Cable C-7 C.7 Hybrid Fieldbus Interfaces C-7 C.8 Connectors C-8 C.9 Project engineering software and Documentation C-11 C.10 Tools, Connector Sets, Configuration C-12 ECOFAST System Manual GWA 4NEB 950 5060-02 C-1 Order numbers C.1 Motor Starters (Reversing starters) Setting Range* Motor Protection/ Switching Technology Brake Fieldbus Order No. ECOFAST Motor Starters 0.3 A - 9 A (4 kW) Temperature Sensor/ Mechanical 400 V AC AS-Interface 3RK1 323-2AS51- 1AA0 AS-Interface 3RK1 323-2AS51- 1AA3 PROFIBUS-DP 3RK1 303-2AS51- 1AA0 PROFIBUS-DP 3RK1 303-2AS51- 1AA3 PROFIBUS-DP 3RK1 303-5BS41- 1AA0 PROFIBUS-DP 3RK1 303-5CS41- 1AA0 ECOFAST Motor Starters High Feature 0.3 A - 9 A (4 kW) 0.3 A - 3 A (1.1 kW) 2.4 A - 9 A (4 kW) TemperaturSensor/ Mechanical 400 V AC Thermal Motor Model/ Mechanical 0.3 A - 3 A (1.1 kW) 400 V AC PROFIBUS-DP 3RK1 303-5BS41- 1AA3 2.4 A - 9 A (4 kW) 400 V AC PROFIBUS-DP 3RK1 303-5CS41- 1AA3 AS-Interface 3RK1 323-5BS41- 1AA0 AS-Interface 3RK1 323-5CS41- 1AA0 0.3 A - 3 A (1.1 kW) 2.4 A - 9 A (4 kW) Thermal Motor Model/ Mechanical 0.3 A - 3 A (1.1 kW) 400 V AC AS-Interface 3RK1 323-5BS41- 1AA3 2.4 A - 9 A (4 kW) 400 V AC AS-Interface 3RK1 323-5CS41- 1AA3 PROFIBUS-DP 3RK1 303-6BS71- 1AA0 PROFIBUS-DP 3RK1 303-6DS71- 1AA0 0.3 A - 3 A (1.1 kW) 2.4 A - 12 A (5.5 kW) Full Motor Protection/ Electronic Soft 0.3 A - 3 A (1.1 kW) 400 V AC PROFIBUS-DP 3RK1 303-6BS71- 1AA3 2.4 A - 12 A (5.5 kW) 400 V AC PROFIBUS-DP 3RK1 303-6DS71- 1AA3 AS-Interface 3RK1 323-6BS71- 1AA0 AS-Interface 3RK1 323-6DS71- 1AA0 0,3 A - 3 A (1,1 kW) 2,4 A - 12 A (5,5 kW) Full Motor Protection/ Electronic Soft 0.3 A - 3 A (1.1 kW) 400 V AC AS-Interface 3RK1 323-6BS71- 1AA3 2.4 A - 12 A (5.5 kW) 400 V AC AS-Interface 3RK1 323-6DS71- 1AA3 400 V AC AS-Interface 3RK1 323-6ES81- 3AA3 400 V AC AS-Interface 3RK1 323-6FS82- 3AA3 400 V AC PROFIBUS-DP 3RK1 303-6ES81- 3AA3 400 V AC PROFIBUS-DP 3RK1 303-6FS82- 3AA3 0.6 A - 4 A (1.5 kW) 2.4 A - 8 A (3 kW) 0.6 A - 4 A (1.5 kW) 2.4 A - 8 A (3 kW) Full Motor Protection/ Electronic Soft (Duo-Reversing Soft) Table C-1: Order numbers for Motor Starters *) Power descriptions are valid for 400 V AC ECOFAST System Manual C-2 GWA 4NEB 950 5060-02 Order numbers C.2 Motor Connection Cables and Power Cables Description Order No. Motor Connection Cables (not shielded) Han 10 E Pin on one side to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 7 x 1.5 mm2 1.5 m - 7 x 1.5 mm2 < 3 m, any length - 7 x 1.5 mm2 3.0 m - 7 x 1.5 mm2 > 3 m to < 5 m, any length - 7 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BG10 911-0CG20 911-0BG20 911-0CG30 911-0BG30 Han 10 E Pin on one side to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 11 x 1.5 mm2 1.5 m - 11 x 1.5 mm2 < 3 m, any length - 11 x 1.5 mm2 3.0 m - 11 x 1.5 mm2 > 3 m to < 5 m, any length - 11 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BJ10 911-0CJ20 911-0BJ20 911-0CJ30 911-0BJ30 Han 10 E on both sides to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 7 x 1.5 mm2 1.5 m - 7 x 1.5 mm2 < 3 m, any length - 7 x 1.5 mm2 3.0 m - 7 x 1.5 mm2 > 3 m to < 5 m, any length - 7 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BH10 911-0CH20 911-0BH20 911-0CH30 911-0BH30 Han 10 E on both sides to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 11 x 1.5 mm2 1.5 m - 11 x 1.5 mm2 < 3 m, any length - 11 x 1.5 mm2 3.0 m - 11 x 1.5 mm2 > 3 m to < 5 m, any length - 11 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BK10 911-0CK20 911-0BK20 911-0CK30 911-0BK30 Han 10 E Pin on one side to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 8 x 1.5 mm2 < 1.5 m - 8 x 1.5 mm2 1.5 m - 8 x 1.5 mm2 < 3 m, any length - 8 x 1.5 mm2 3.0 m - 8 x 1.5 mm2 > 3 m to < 5 m, any length - 8 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0CV10 911-0BV10 911-0CV20 911-0BV20 911-0CV30 911-0BV30 Han 10 E on both sides to connect the motor starter with the motor (for mounting in the vicinity of the motor) - 8 x 1.5 mm2 < 1.5 m - 8 x 1.5 mm2 1.5 m - 8 x 1.5 mm2 < 3 m, any length - 8 x 1.5 mm2 3.0 m - 8 x 1.5 mm2 > 3 m to < 5 m, any length - 8 x 1.5 mm2 5.0 m 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0CU10 911-0BU10 911-0CU20 911-0BU20 911-0CU30 911-0BU30 Motor Connection Cables (shielded) Table C-2: Order numbers for Motor Connection Cables and Power Cables ECOFAST System Manual GWA 4NEB 950 5060-02 C-3 Order numbers Description Unassembled - 8 x 1.5 mm2 20 m - 8 x 1.5 mm2 50 m - 8 x 1.5 mm2 100 m Order No. 3RK1 911-0BW60 3RK1 911-0BW70 3RK1 911-0BW80 Power Cables Han Q8 Pin/power tee connector for looping through power - 5 x 4.0 mm2 1.5 m - 5 x 4.0 mm2 < 3 m, any length - 5 x 4.0 mm2 3.0 m - 5 x 4.0 mm2 > 3 m to < 5 m, any length - 5 x 4.0 mm2 5.0 m - 5 x 4.0 mm2 > 5 m to < 10 m, any length - 5 x 4.0 mm2 10.0 m - 5 x 4.0 mm2 > 10 m to < 15 m, any length 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BB10 911-0CB20 911-0BB20 911-0CB30 911-0BB30 911-0CB40 911-0BB40 911-0CB50 Power cable Han Q8 Pin/power tee connector for looping through power - 7 x 2.5 mm2 1.5 m - 7 x 2.5 mm2 < 3 m, any length - 7 x 2.5 mm2 3.0 m - 7 x 2.5 mm2 > 3 m to < 5 m, any length - 7 x 2.5 mm2 5.0 m - 7 x 2.5 mm2 > 5 m to < 10 m, any length - 7 x 2.5 mm2 10.0 m - 7 x 2.5 mm2 > 10 m to < 15 m, any length 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BE10 911-0CE20 911-0BE20 911-0CE30 911-0BE30 911-0CE40 911-0BE40 911-0CE50 Han Q8 pin/Han Q8 Socket for looping through power - 5 x 4.0 mm2 1.5 m - 5 x 4.0 mm2 < 3 m, any length - 5 x 4.0 mm2 3.0 m - 5 x 4.0 mm2 > 3 m to < 5 m, any length - 5 x 4.0 mm2 5.0 m - 5 x 4.0 mm2 > 5 m to < 10 m, any length - 5 x 4.0 mm2 10.0 m - 5 x 4.0 mm2 > 10 m to < 15 m, any length 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BC10 911-0CC20 911-0BC20 911-0CC30 911-0BC30 911-0CC40 911-0BC40 911-0CC50 Han Q8 pin/Han Q8 Socket for looping through power - 7 x 2.5 mm2 1.5 m - 7 x 2.5 mm2 < 3 m, any length - 7 x 2.5 mm2 3.0 m - 7 x 2.5 mm2 > 3 m to < 5 m, any length - 7 x 2.5 mm2 5.0 m - 7 x 2.5 mm2 > 5 m to < 10 m, any length - 7 x 2.5 mm2 10.0 m - 7 x 2.5 mm2 > 10 m to < 15 m, any length 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BF10 911-0CF20 911-0BF20 911-0CF30 911-0BF30 911-0CF40 911-0BF40 911-0CF50 Han Q8 Pin/open end - 5 x 4.0 mm2 1.5 m - 5 x 4.0 mm2 < 3 m, any length - 5 x 4.0 mm2 3.0 m - 5 x 4.0 mm2 > 3 m to < 5 m, any length - 5 x 4.0 mm2 5.0 m - 5 x 4.0 mm2 > 5 m to < 10 m, any length - 5 x 4.0 mm2 10.0 m - 5 x 4.0 mm2 > 10 m to < 15 m, any length 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BA10 911-0CA20 911-0BA20 911-0CA30 911-0BA30 911-0CA40 911-0BA40 911-0CA50 Table C-2: Order numbers for Motor Connection Cables and Power Cables ECOFAST System Manual C-4 GWA 4NEB 950 5060-02 Order numbers Description Han Q8 Pin/open end - 7 x 2.5 mm2 1.5 m - 7 x 2.5 mm2 < 3 m, any length - 7 x 2.5 mm2 3.0 m - 7 x 2.5 mm2 > 3 m to < 5 m, any length - 7 x 2.5 mm2 5.0 m - 7 x 2.5 mm2 > 5 m to < 10 m, any length - 7 x 2.5 mm2 10.0 m - 7 x 2.5 mm2 > 10 m to < 15 m, any length Order No. 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-0BD10 911-0CD20 911-0BD20 911-0CD30 911-0BD30 911-0CD40 911-0BD40 911-0CD50 Table C-2: Order numbers for Motor Connection Cables and Power Cables ECOFAST System Manual GWA 4NEB 950 5060-02 C-5 Order numbers C.3 Power & Control Modules (Infeed Modules) Description Order No. PROFIBUS S7-300 (Master) Main power supply 3 AC 400 V, 40 A Auxiliary power supply 2 x DC 24 V Rotary actuator with main switch functions SIGUARD contactor safety combination Autostart Dimensions (W x H x D) in mm: 400 x 650 x 248 4FB2 111-2AE010AA0 PROFIBUS S7-300 (master) and AS-i bus (master) Main power supply 3 AC 400 V, 40 A Auxiliary power supply 2 x DC 24 V, 1x AS-i Rotary actuator with main switch functions SIGUARD contactor safety combination Autostart Dimensions (W x H x D) in mm: 400 x 650 x 248C 4FB2 121-2AE010AA0 PROFIBUS S7-300 (master) and AS-i bus (master) Main power supply 3 AC 400 V, 25 A Auxiliary power supply 2x DC 24 V, 1 x AS-i Rotary actuator with EMERGENCY-STOP functions AS-i monitor for SAFETY AT WORK Dimensions (W x H x D) in mm: 400 x 650 x 248 4FB2 112-2AC010AA0 PROFIBUS ET 200B (slave) Main power supply 3 AC 400 V, 40 A Auxiliary power supply 2x DC 24 V Rotary actuator with main switch functions SIGUARD contactor safety combination Autostart Dimensions (W x H x D) in mm: 400 x 650 x 248 4FB2 111-2AE010AA1 Table C-3: Order numbers for Power & Control Modules (Infeed Modules) C.4 Discriminating Modules Description Order No. Discriminating Module Used to selectively disconnect feeders with a repair switch function in order to protect the line in case of a change in cross-section and to increase the size of the segments. Connected to AS-Interface. - for AC 400 V, 8 A - for AC 400 V, 16 A - for AC 400 V, 25 A 3RK1 911-4AA08 3RK1 911-4AA16 3RK1 911-4AA25 Table C-4: Order numbers for Discriminating Modules ECOFAST System Manual C-6 GWA 4NEB 950 5060-02 Order numbers C.5 Hybrid Fieldbus Cables Description Order No. PROFIBUS ECOFAST Hybrid Cable - fiber-optic Trailing cable (PUR casing) with two plastic FO conductors for PROFIBUS-DP and four copper cores with 1.5 mm2 (DESINA-compatible) Pre-assembled with two ECOFAST connectors - 1.5 m 6XV1 830-7DH15 -3m 6XV1 830-7DH30 -5m 6XV1 830-7DH50 - 10 m 6XV1 830-7DN10 - 15 m 6XV1 830-7DN15 Unassembled cable - 20 m 6XV1 830-7CN20 - 50 m 6XV1 830-7CN50 - 100 m 6XV1 830-7CT10 PROFIBUS ECOFAST Hybrid Cable - copper Trailing cable (PUR casing) with two shielded copper conductors for PROFIBUS-DP and four copper cores with 1.5 mm2 Pre-assembled with two ECOFAST connectors - 1.5 m 6XV1 830-7BH15 -3m 6XV1 830-7BH30 -5m 6XV1 830-7BH50 - 10 m 6XV1 830-7BN10 - 15 m 6XV1 830-7BN15 - 20 m 6XV1 830-7BN20 - 25 m 6XV1 830-7BN25 - 30 m 6XV1 830-7BN30 - 35 m 6XV1 830-7BN35 - 40 m 6XV1 830-7BN40 - 45 m 6XV1 830-7BN45 - 50 m 6XV1 830-7BN50 Table C-5: Order numbers for Hybrid Fieldbus Cables ECOFAST System Manual GWA 4NEB 950 5060-02 C-7 Order numbers Unassembled cable - material sold by meter 6XV1 830-7AH10 - 20 m 6XV1 830-7AN20 - 50 m 6XV1 830-7AN50 - 100 m 6XV1 830-7AT10 Table C-5: Order numbers for Hybrid Fieldbus Cables ECOFAST System Manual C-8 GWA 4NEB 950 5060-02 Order numbers C.6 AS-Interface Shaped Cable Description Material Rubber Colour yellow (AS-Interface) black (DC 24 V) TPE Order No. yellow (AS-Interface) black (DC 24 V) Quantity 100 m roller 3RX9 010-0AA00 1 km drum 3RX9 012-0AA00 100 m roller 3RX9 020-0AA00 1 km drum 3RX9 022-0AA00 100 m roller 3RX9 013-0AA00 1 km drum 3RX9 014-0AA00 100 m roller 3RX9 023-0AA00 1 km drum 3RX9 024-0AA00 TPE Special design according to UL Class2 yellow (AS-Interface) 100 m roller 3RX9 017-0AA00 black (DC 24 V) 100 m roller 3RX9 027-0AA00 PUR yellow (AS-Interface) 100 m roller 3RX9 015-0AA00 1 km drum 3RX9 016-0AA00 100 m roller 3RX9 025-0AA00 1 km drum 3RX9 026-0AA00 black (DC 24 V) Table C-6: AS-Interface Shaped Cable C.7 Hybrid Fieldbus Interfaces Description Order No. Hybrid fieldbus interface Interface between switchgear cabinet/Infeed module (IP20) and the field IP67 Data via 2 x Copper shielded/FO 2 x 24 V DC for switched/non switched Voltage Infeeding of Data and 2 x 24 V into the hybrid fieldbus cable, 2 channels Hybrid Fieldbus Hybrid Fieldbus Hybrid Fieldbus Hybrid Fieldbus Hybrid Fieldbus Hybrid Fieldbus Hybrid Fieldbus (active) Interface Interface Interface Interface Interface Interface Interface Copper/Copper, Socket/Socket for incoming supply Copper/Copper, Pin/Socket for looping through Copper/FO, Socket/Socket incoming supply Copper/FO, Pin/Socket for looping through Copper-FO/FO, Socket/Socket incoming supply Copper-LWL/FO, Pin/Socket for looping through Copper/Copper, Socket/Socket incoming supply 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 3RK1 911-1AA22 911-1AA32 911-1AB22 911-1AB32 911-1AD22 911-1AD32 911-1AE22 Table C-7: Order numbers for Hybrid Fieldbus Interfaces ECOFAST System Manual GWA 4NEB 950 5060-02 C-9 Order numbers C.8 Connectors Description Order No. Data + 24 V Data Tee Connector Cu Data Tee Connector FO 3RK1 911-2AG00 3RK1 911-2AH00 ECOFAST Bus Terminating Connector for PROFIBUS-DP 1 piece ECOFAST Bus Terminating Connector for PROFIBUS-DP 5 pieces 6GK1 905-0DA10 6GK1 905-0DA00 PROFIBUS FO plug connector FO, 5 pieces with 2x plastic FO and 4x copper conductors 1.5 mm 2 - with pin insert - with socket insert 6GK1 905-0BA00 6GK1 905-0BB00 PROFIBUS copper-cable plug connector, 5 pieces with 2x shielded copper and 4x copper conductors 1.5 mm 2 - with pin insert - with socket insert 6GK1 905-0CA00 6GK1 905-0CN00 Power Power tee clamp connector (round cable adapter) for 400 V AC Used to connect feeders to any point on the power bus by means of standard round cables (insulation displacement method). - for Feeders (e.g. Motor Starter) - for Power supply (e.g. Power & Control Module) 3RK1 911-2BF00 3RK1 911-2BE00 Seals for Power Tee Clamp Connector - for Power Cable with O 10 to 13 mm - for Power Cable with O 13 to 16 mm - for Power Cable with O 16 to 19 mm - for Power Cable with O 19 to 22 mm 3RK1 3RK1 3RK1 3RK1 Power Tee Connector Han Q8 individual mounting Power Tee Connector Han Q8 lined up 3RK1 911-2BG00 3RK1 911-2BH00 Connector Connector Connector Connector 3RK1 3RK1 3RK1 3RK1 Set Set Set Set Han Han Han Han 10E 10E 10E 10E Pin in thin coupling enclosure PG 16 Pin in thick coupling enclosure PG 21 Socket in thin funnel enclosure PG 16 Socket in thin funnel enclosure PG 16 Connector Set Han 10E Pin EMC Connector Set Han 10E Socket EMC 911-5BA00 911-5BA10 911-5BA20 911-5BA30 911-2BK00 911-2BL00 911-2BM00 911-2BN00 3RK1 911-2BL10 3RK1 911-2BN10 Table C-8: Order numbers for Connectors ECOFAST System Manual C-10 GWA 4NEB 950 5060-02 Order numbers C.9 Project engineering software and Documentation Description Order No. Project engineering software ECOFAST ES - Graphical power bus configuration - Power bus dimensioning - Operator prompting on selection of Siemens A&D products - Norm-compliant power system design - Documentation 3ZS1 200-0CC110YA0 Switch ES * Switch ES Motor Starter V 2.0 - for parameterizing, visualizing, diagnosing and testing the ECOFAST motor starters via PROFIBUS-DP - with online help - German/English selectable - tested for execution under Windows 95/98/2000/NT System System requirements: - PROFIBUS-DP interface: CP5411 (ISA), CP5412 (ISA), CP5511 (PCMCIA) P5611 (PCI), Smart Cable for serial communication via a serial interface and Teleservice, CP5613 and CP5614 (new CP card) and MPI interface on PG7xx and its driver software (view interactive catalog CA01) - CD-ROM drive * STEP7 object manager - for integrating the ECOFAST starter as an S7 slave in SIMATIC S7 - for calling Switch ES from STEP7 System requirements: - SIMATIC: S7, M7, C7, PCS7 - STEP7: Version 5.0 or higher - CD-ROM drive 3ZS1 310-0CC200YA0 Upgrade Switch ES Motor Starter from version 1.0 up to 2.0 3ZS1 310-0CC200YE0 Documentation Manual for ECOFAST Motor Starters (German/English) Manual for ECOFAST Motor Starters High Feature (German) Manual for ECOFAST Motor Starters High Feature (English) 3RK1 702-2GB180AA0 3RK1 702-3AB181AA0 3RK1 702-3BB181AA0 Table C-9: Project engineering software and Documentation ECOFAST System Manual C-11 GWA 4NEB 950 5060-02 Order numbers C.10 Tools, Connector Sets, Configuration Description Pieces per Package Order No. Crimping tool - for contact pins and sockets 1.5 to 2.5 mm2 - for contact pins and sockets 2.5 to 4.0 mm2 1 1 3RK1 902-0AH00 3RK1 902-0CT00 Disassembling tool for contact pins and sockets 1 3RK1 902-0AJ00 1 10 3RK1 902-0CK00 3RK1 902-0CJ00 Connector set for power infeed 2.5 mm 2: 1 connector enclosure with PG 16, 1 socket insert and 9 contact sockets 2,5 mm2 1 3RK1 902-0CA00 Connector set for power infeed 2.5 mm 2: 1 connector enclosure with PG 16, 1 socket insert and 9 contact socket 4.0 mm2 1 3RK1 902-0CB00 Connector set for looping through power 2.5 mm2: 1 connector enclosure with PG 16, 1 pin insert and 9 contact pins 2.5 mm 2 1 3RK1 902-0CC00 Connector set for looping through power 4.0 mm2: 1 connector enclosure with PG 16, 1 pin insert and 9 contact pins 4.0 mm 2 1 3RK1 902-0CD00 Mounting plate (for motor plugged in) 1 3RK1 911-3AA00 Identification Plug 1 6ES7 194-1KB00-0XA0 PC cable with memory submodule 1 3RK1 911-0BN20 Test connector set 1 3RK1 911-2AM00 Cable end covers for AS-Interface Shaped Cable 1 3RK1 901-1MN00 Addressing and diagnostic unit for AS-i 1 3RK1 904-2AB00 Cover for power sockets Table C-10: Order numbers for Tools, Connector Sets, Configuration ECOFAST System Manual C-12 GWA 4NEB 950 5060-02 Glossary Terminating resistor Each bus line connecting the individual motor starters to each other must be terminated with a resistor at the start and end. This prevents line reflections. Baud rate The baud rate is the rate of data transmission and indicates the number of bits transmitted per second (baud rate = bit rate). Baud rates of 9.6 kilobaud to 12 megabaud are possible with PROFIBUS-DP. Bus Common transmission path via which all stations are connected. It has two defined ends. With PROFIBUS, the bus is a two-wire line (copper wire) or an optical-fiber cable. Bus segment see Segment Bus system The bus system comprises all the stations that are physically connected via a bus cable. Data tee connector Data tee connectors connect the components of an automation system with PROFIBUS-DP. Two data tee connectors are available in the ECOFAST system: * With a copper cable (PROFIBUS-DP Cu) * With an optical-fiber cable (PROFIBUS-DP optical-fiber cable) DESINA Decentralized and standardized installation system for machine tools: Developed by the Association of Machine Tool Manufacturers with the aim of defining a standard for the design and installation of machine tool components. DMD Device master data (DMD) contains DP slave descriptions in a standardized format. The use of DMD makes configuring the master and the DP slave easier. DP-Master The DP Master is a master that functions in accordance with EN 50 170, volume 2, PROFIBUS, and uses the DP protocol. DP-Slave The DP Slave is a slave that is operated on the PROFIBUS bus with the PROFIBUS-DP protocol and functions in accordance with EN 50 170 standard, volume 2, PROFIBUS. DP-Standard The DP Standard is the bus protocol of the ET 200 distributed I/O system based on the EN 50 170 standard, Volume 2, PROFIBUS. ECOFAST Energy and Communication Field Installation System: A system that decentralizes and modularizes installation to a large extent and permits extensive diagnostics on the component level. ECOFAST certified Confirms that devices from different manufacturers are compatible with ECOFAST specifications. ECOFAST System Manual GWA 4NEB 950 5060-02 Glossary-1 ECOFAST integrated In addition to Siemens components, devices from other manufacturers can be integrated in this configuration tool. Their integration and conformity is confirmed by the "ECOFAST integrated" certificate. ECOFAST ES The ECOFAST ES configuration tool supports power-engineering system design. Host A host is a system or unit that contains at least one DP Master. For example, the programmable controller with the CPU is the host, and the IM 308-C is the DP Master. Hybrid field bus connector The Hybrid field bus connector is the physical connection between the station and the bus cable IM 308-C The IM 308-C is a DP Master for the ET 200 distributed I/O system. The IM 308-C can be used together with COM PROFIBUS and plugged into the S5-115U, S5-135U and S5-155U programmable controllers. IrDA Infrared Data Association: standard for an infrared interface driver. Master When they are in possession of the token, masters can send data to other stations and request data from these stations (= active station). Master interface Module for a distributed configuration. The distributed inputs and outputs are "connected" to the programmable controller via the master interface C. Master-slave method A bus access method whereby only one station at a time is the master and all other stations are slaves. Master system All slaves that are assigned to a master with a reading and writing function form a master system together with the master. Power bus Linear, primary power distribution bus Power tee connectors Power tee connectors connect motor starters to the power bus. The power bus is not interrupted when the motor starter is unplugged. PROFIBUS PROcess FIeld BUS, European process and fieldbus standard which is defined in the PROFIBUS standard (EN 50 170, Volume 2, PROFIBUS). It specifies functional, electrical and mechanical properties for a one-bit, serial fieldbus system. PROFIBUS is a bus system which networks PROFIBUS-compatible automation systems and field devices at the cell and field levels. PROFIBUS is available with the following protocols: DP (= Distributed Input/ Output), FMS (= Fieldbus Message Specification), PA (Process Automation) and TF (= Technological Functions). Glossary-2 ECOFAST System Manual GWA 4NEB 950 5060-02 PROFIBUS address Each station must be assigned a PROFIBUS address for the purpose of unique identification. The PC/PU or the ET 200 hand-held unit have the PROFIBUS address "0". The master and slaves have a PROFIBUS address within the range from 1 to 125. Process image An "image" of the states of all inputs (= PII) or all outputs (= PIO) at a particular instant in time. You can access the process image in the controller program PROFIBUS-DP PROFIBUS bus system with the DP protocol. DP stands for distributed I/O system. The primary task of PROFIBUS-DP is fast cyclical exchange of data between the central DP Master and the peripheral devices Segment The bus line between two terminating resistors forms a segment. A segment contains 0 to 32 stations. Segments can be coupled via RS 485 repeaters. Slave A slave can only exchange data with a master after being requested to do so by the master. Slaves include, for example, all DP Slaves, such as motor starters, frequency converters, etc. Station A station is a device that can send, receive, or amplify data via the bus (e.g. a master, a slave, an RS 485 repeater, or an active star coupler). Station number See PROFIBUS address Current limit You can set an upper and/or a lower current limit. Example: "Substance for mixing too thick", that is, the upper current limit has been exceeded. "No-load operation because drive belt is torn", that is, the lower current limit has been undershot. The current limits and the block protection are not activated in order to bypass startup until the class time has elapsed (e.g. after 10 seconds for class 10). If the current limits are violated, the motor starter responds with either a shutdown or warning. Setting range for lower current limit: 20%..0.100% of the rated operational current. Setting range for upper current limit: 50%...150% of the rated operational current. Load feeder A load feeder is a branch from the main circuit to the load with "Switching" and "Protection" functions. The "Protection" function comprises: * Protection of the line from the load feeder to the load (line protection), * Protection of the load against overloading (load protection). ECOFAST System Manual GWA 4NEB 950 5060-02 Glossary-3 Glossary-4 ECOFAST System Manual GWA 4NEB 950 5060-02 Name SIEMENS AG A&D CD MM 3 Deutsch Sender (please fill out) D-92220 Amberg Address Fax: **49-9621-80-3337 Telephone ECOFAST System Manual Have you found any typographical errors while reading this manual? Please use this form to tell us about them. We would also welcome any ideas and suggestions you may have. ECOFAST System Manual GWA 4NEB 950 5060-02 English Company/Department ECOFAST System Manual GWA 4NEB 950 5060-02 Siemens Aktiengesellschaft Automation and Drives Low Voltage Controls and Distribution Postfach 32 40 D-91050 Erlangen www.siemens. c o m/ecofast Order No. 3RK1703-0BB18-0AA0