4.18 Transport................................................................................................................................35
4.18.1 Safety instructions for transport .............................................................................................35
4.18.2 Checking the delivery.............................................................................................................37
4.18.3 Securing the rotor...................................................................................................................37
4.18.4 Lifting and transporting the machine ......................................................................................39
4.19 Storage...................................................................................................................................39
4.19.1 Storing the machine ...............................................................................................................39
4.19.2 Storing the filter mats (option, air filter) ..................................................................................42
4.19.3 Protection against corrosion...................................................................................................42
4.20 Converter operation ...............................................................................................................43
4.20.1 Supply line configuration ........................................................................................................43
4.20.2 Converter input voltage ..........................................................................................................43
4.20.3 Reducing bearing currents .....................................................................................................44
4.20.4 Insulated bearings when operating the converter ..................................................................45
4.20.5 Converter operation on a grounded network..........................................................................47
5 Assembly ....................................................................................................................................................49
5.1 Safety instructions for mounting.............................................................................................49
5.2 Preparations for installation....................................................................................................50
5.2.1 Requirements for installation..................................................................................................50
5.2.2 Insulation resistance and polarization index ..........................................................................50
5.2.3 Testing the insulation resistance and polarization index........................................................51
5.2.4 Prepare the mating faces (IM B3) ..........................................................................................54
5.2.5 Prepare the mating face for a flange connection ...................................................................54
5.2.6 Prepare the mating face for wall mounting ............................................................................54
5.3 Lift the machine to where it will be installed, and position it...................................................54
5.3.1 Preconditions for correct alignment and secure attachment .................................................54
5.3.2 Checking the load handling attachments ...............................................................................55
5.3.3 Removing the rotor shipping brace ........................................................................................55
5.3.4 Removing the rotor shipping brace from machines in vertical type........................................55
5.3.5 Removing anti-corrosion protection .......................................................................................56
5.3.6 Mounting the output elements................................................................................................56
5.3.7 Lifting and transportation........................................................................................................58
5.3.8 Putting the machine down......................................................................................................59
5.3.9 Draining condensation ...........................................................................................................60
5.3.10 Roughly aligning the machine ................................................................................................61
5.4 Installing the machine ............................................................................................................62
5.4.1 Preconditions for smooth, vibration-free operation ................................................................62
5.4.2 Aligning the machine to the driven machine and mounting (IM B3 / IM B35) ........................62
5.4.3 Aligning the machine to the driven machine and attaching it to it (IM B5) .............................64
5.4.4 Aligning the machine to the driven machine and attaching it to it (IM V1, IM V10) ................65
5.4.5 Axial and radial forces............................................................................................................65
6 Electrical connection...................................................................................................................................67
6.1 Safety instructions for the electrical connection .....................................................................67
6.2 Basic rules..............................................................................................................................67
6.3 Terminal box ..........................................................................................................................68
6.3.1 Terminal box 1XB1621...........................................................................................................69
Table of contents
SIMOTICS FD 1LQ1
6Operating Instructions 01/2019