Table of contents
1PH8 main motors explosion-proof version for zone 2 and 22 (option M03 and M39)
8 Operating Instructions, 11/2018, A5E44794151B AA
5 Connection ........................................................................................................................................... 51
5.1 Mechanical connection of water cooling system .................................................................... 51
5.2 Electrical connection .............................................................................................................. 51
5.2.1 Risk of electric shock if the insulating foil is removed ............................................................ 52
5.2.2 Safety note if directly connected to the line supply ................................................................ 52
5.2.3 Damage to components that are sensitive to electrostatic discharge ................................... 52
5.2.4 Note regarding the EMC directive .......................................................................................... 52
5.2.5 Cables, cable entry and cable routing ................................................................................... 53
5.2.6 Circuit diagram ....................................................................................................................... 54
5.2.7 Terminal box .......................................................................................................................... 55
5.2.8 Electrical connection data ...................................................................................................... 56
5.2.9 Motors without DRIVE-CLiQ interface ................................................................................... 56
5.2.10 Connecting the speed encoder .............................................................................................. 57
5.2.11 Fitting the disassembly protection tube for the signal plug .................................................... 58
5.2.12 Connecting the temperature sensor ...................................................................................... 59
5.2.13 Connecting a grounding conductor in the terminal box ......................................................... 59
5.2.14 Connecting the ground conductor to the housing .................................................................. 60
5.2.15 Connecting the external fan ................................................................................................... 61
5.2.16 Connecting-up an inverter ...................................................................................................... 62
6 Commissioning ..................................................................................................................................... 63
6.1 Safety instructions for commissioning ................................................................................... 63
6.2 Checklists for commissioning ................................................................................................. 65
6.3 Checking the insulation resistance ........................................................................................ 68
6.4 Switching on and switching off ............................................................................................... 69
6.5 Cooling ................................................................................................................................... 70
7 Operation .............................................................................................................................................. 71
7.1 Faults ..................................................................................................................................... 72
7.2 Non-operational periods ......................................................................................................... 74
8 Maintenance ......................................................................................................................................... 75
8.1 Inspection and maintenance .................................................................................................. 76
8.1.1 General inspection guidelines ................................................................................................ 76
8.1.2 Maintenance and inspection intervals .................................................................................... 76
8.1.3 Initial inspection...................................................................................................................... 77
8.1.4 General inspection ................................................................................................................. 78
8.1.5 Bearing change interval ......................................................................................................... 78
8.1.6 Cleaning the motor and fan (forced ventilation) ..................................................................... 81
8.1.7 Encoder replacement ............................................................................................................. 81
8.2 Repair ..................................................................................................................................... 81
8.2.1 Removing/installing the motor bearings ................................................................................. 82
8.2.2 Removing/installing the speed encoder ................................................................................. 83
8.2.3 Tightening torque for screwed connections ........................................................................... 85
8.2.4 Repairing paint damage ......................................................................................................... 86
9 Spare parts ........................................................................................................................................... 87